INSTALL BACK UP GENERATOR AND ATS FOR NMCI ROOM, BLDG 127, DAM NECK ANNEX N4008525R0072
Summary
AI-generated · Aug 25, 2025Provide backup power to the NMCI equipment room IT server racks and HVAC in Room S145, Building 127, Taylor Hall, NAS Oceana Dam Neck Annex, by installing a diesel standby generator and an automatic transfer switch (ATS). To minimize the HVAC infrastructure that must be supported by backup power, a computer room air conditioning (CRAC) unit will be installed to cool the NMCI equipment room and will be powered from the backup power system.
Only contractors on this MACC group may submit proposals. Across the records provided, the scope is the same; no changes or new information are indicated between notices.
This project will provide backup power to the NMCI equipment room IT server racks and HVAC in Room S145 of B127 Taylor Hall, NAS Oceana Dam Neck Annex via a diesel stand-by generator and automatic transfer switch (ATS). To minimize the scale of the HVAC infrastructure requiring backup power, a computer room air conditioning (CRAC) unit will be installed to cool the NMCI equipment room and powered via the backup power system. ONLY CONTRACTORS ON THIS MACC GROUP CAN SUBMIT A PROPOSAL.
From Solicitation posted on Jul 30, 2025This project will provide backup power to the NMCI equipment room IT server racks and HVAC in Room S145 of B127 Taylor Hall, NAS Oceana Dam Neck Annex via a diesel stand-by generator and automatic transfer switch (ATS). To minimize the scale of the HVAC infrastructure requiring backup power, a computer room air conditioning (CRAC) unit will be installed to cool the NMCI equipment room and powered via the backup power system. ONLY CONTRACTORS ON THIS MACC GROUP CAN SUBMIT A PROPOSAL.
From Solicitation posted on Aug 08, 2025This project will provide backup power to the NMCI equipment room IT server racks and HVAC in Room S145 of B127 Taylor Hall, NAS Oceana Dam Neck Annex via a diesel stand-by generator and automatic transfer switch (ATS). To minimize the scale of the HVAC infrastructure requiring backup power, a computer room air conditioning (CRAC) unit will be installed to cool the NMCI equipment room and powered via the backup power system. ONLY CONTRACTORS ON THIS MACC GROUP CAN SUBMIT A PROPOSAL.
From Solicitation posted on Aug 20, 2025This project will provide backup power to the NMCI equipment room IT server racks and HVAC in Room S145 of B127 Taylor Hall, NAS Oceana Dam Neck Annex via a diesel stand-by generator and automatic transfer switch (ATS). To minimize the scale of the HVAC infrastructure requiring backup power, a computer room air conditioning (CRAC) unit will be installed to cool the NMCI equipment room and powered via the backup power system. ONLY CONTRACTORS ON THIS MACC GROUP CAN SUBMIT A PROPOSAL.
From Solicitation posted on Aug 28, 2025This project will provide backup power to the NMCI equipment room IT server racks and HVAC in Room S145 of B127 Taylor Hall, NAS Oceana Dam Neck Annex via a diesel stand-by generator and automatic transfer switch (ATS). To minimize the scale of the HVAC infrastructure requiring backup power, a computer room air conditioning (CRAC) unit will be installed to cool the NMCI equipment room and powered via the backup power system. ONLY CONTRACTORS ON THIS MACC GROUP CAN SUBMIT A PROPOSAL.
From Solicitation posted on Mar 17, 2026Notice history
5-
Solicitation Posted Jul 30, 2025
-
Solicitation Posted Aug 08, 2025No changes from previous notice
-
Solicitation Posted Aug 20, 2025No changes from previous notice
-
Solicitation Posted Aug 28, 2025No changes from previous notice
-
Solicitation LATEST Posted Mar 17, 2026View changes (1)
- Response Deadline: Aug 29, 2025 → Mar 19, 2026
Details
Award Information
Not yet awarded
Documents
8Contacts
Phone
Agency
Place of Performance
USA