Inspection of a Radial Thrust Bearing Assembly W912ES26QA0110001
Summary
AI-generated · Dec 18, 2025Two-phase contract for inspection and repair of the radial thrust bearing assembly on the VOSTA HPD 550-1350-280 dredge pump. Phase 1 requires a comprehensive inspection to document component condition, identify the source and extent of oil leakage, and produce a written report with a recommended replacement list and a detailed repair/replacement cost estimate (Phase 1 price includes return shipping to the Corps facility). Phase 2, after written government approval, involves repairing or replacing only those components identified in Phase 1 using OEM-certified parts and procedures, proper torque, lubrication, and seals; all replacements must be photographed. If the inspection firm does not win the repair contract, the unit will be reassembled as needed, safely packaged, and returned within 14 business days of notification.
Requirements include adherence to OEM manuals and applicable industry standards, use of new OEM-certified parts, and personnel qualified in heavy-duty pump bearing maintenance. No work may begin without written authorization from the Contracting Officer. After repairs, the contractor must perform alignment and functional testing and document results, including lubrication flow and load verification per OEM standards. Deliverables are the Phase 1 inspection report (findings, required replacements, photos) and a repair cost estimate. The government may witness activities, and final acceptance hinges on compliance with the SOW. The contractor bears all shipping/logistics for transporting the unit to and from the contractor’s facility (the unit weighs about 8,000 pounds); all replaced components must be returned to the Government for inspection. Documentation of replacements must be submitted to the Government TPOC.
Statement of Work (SOW) Radial Thrust Bearing Assembly Inspection and Repair 1. Scope This Statement of Work (SOW) defines a two-part effort for the inspection and repair of the radial thrust bearing assembly installed on the VOSTA HPD 550-1350-280 dredge pump. Phase 1 Inspection, Report, and Repair Estimate The contractor shall perform a full inspection of the radial thrust bearing assembly to document component condition, identify the cause of oil leakage, and produce a written inspection report with a detailed repair/replacement cost estimate. The phase 1 price will include return shipping to the Corps FCSB location. Phase 2 Repair and Replacement (Upon Government Approval) Repair or replacement activities shall occur only after the Government issues written approval. The objective is to restore the assembly to full operational capability in accordance with OEM and industry standards. Oil leakage has been observed at the seals; therefore, special attention shall be given to seal condition, integrity, and lubrication during both inspection and repair. The Corps reserves the right to compete the repair among other vendors. Should the firm awarded the inspection contract not win the contract for repair work the unit will be, reassembled (if needed), safely packaged, and returned to the Corps FCSB location no later than 14 business days from notification. 2. Applicable Documents The following documents shall guide this effort. The contractor shall have permission for use and access to the following company provided documents: VOSTA HPD 550-1350-280 Operation and Maintenance Manual OEM technical drawings, specifications, and service bulletins The work shall comply with the latest revisions of the following standards: Standard Description ISO 13709 / API 610 Centrifugal Pumps for Petroleum, Petrochemical, and Natural Gas Industries (primary heavy-duty pump specification). ISO 5199 Technical specifications for centrifugal pumps Class II. ISO 281 Rolling bearings Dynamic load ratings and rating life. ISO 1940-1 Mechanical vibration Balance quality for rigid rotors. ANSI/ABMA 9 Load Ratings and Fatigue Life for Ball Bearings. ANSI/ABMA 11 Load Ratings and Fatigue Life for Roller Bearings. ANSI/ABMA 7 Shaft and Housing Fits for Metric Radial Ball and Roller Bearings. ANSI/EASA AR100 Recommended practice for repair of rotating electrical apparatus Section 2.2 regarding bearings. 3. Requirements 3.1 Phase 1 Inspection Requirements The contractor shall: Perform a complete inspection of the radial thrust bearing assembly to identify wear, damage, or defects. Document the condition of all bearing components, including races, rollers, cages, seals, lubrication channels, and other related parts. Evaluate and document the source and extent of oil leakage, including photographs and corrective recommendations. Provide a written inspection report identifying components requiring replacement. Include photographic documentation of all damaged or worn components. Provide a detailed cost estimate for repairs or replacements, including part lead times. 3.2 Phase 2 Replacement of Damaged Components (Upon Approval) The contractor shall: Remove and replace only Government-approved components identified in Phase 1. Use OEM-certified replacement parts only. Install components using OEM procedures and correct torque specifications. Apply proper lubrication, seals, and fasteners in accordance with OEM guidance. Document all replaced components with photographs. 3.2.1 Government Approval Requirement No removal, replacement, or repair work shall begin without written authorization from the Contracting Officer (CO). Any unauthorized repair work shall be performed at no cost to the Government. 3.3 Testing and Verification to be priced as part of any repair submission. After completion of approved repairs, the contractor shall: Perform alignment and functional checks. Verify rotational performance, load capacity, and lubrication flow per OEM standards. Provide documentation of all test results. 4. Materials and Workmanship All replacement parts shall be new, OEM-certified, and free of defects. All work shall comply with OEM instructions and accepted industry best practices. Personnel performing the work shall be qualified in heavy-duty pump bearing maintenance. 5. Deliverables The contractor shall provide: Phase 1 inspection report, including findings, required replacements, and photos. Repair cost estimate. 6. Quality Assurance and Acceptance Government representatives may witness inspection, repair, and testing activities. Final acceptance shall be based on: Compliance with this SOW 7. Schedule The contractor shall submit a detailed schedule for inspection, reporting, approval, repair, and testing no later than 15 January 2026. All work, to include any authorized repair, shall be completed no later than 15 March 2026. 8. Shipping, Delivery, and Reporting The contractor is responsible for all shipping costs and logistics for transporting the unit to and from their facility. The unit is Approx. 8,000 pounds, is on cribbing and can be loaded and unloaded from/to the Army Corp. facility 0730-1500 Mon-Friday. Loading/unloading from Corp. facility shall be completed by the contractor. Pick up/Shipping Address: 431 North Shore Drive PO Box 397 Fountain City, WI 54629 All documentation shall be submitted to the Government Technical Point of Contact (TPOC). All replaced components shall be returned to the Government for inspection and final disposition.
From Solicitation posted on Dec 17, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA