Contacts, documents and full notice history are available with a subscription.
Special Notice Expired 2 notices 1 document

Industry Day Web meeting for Fiber Reinforced Polymer (FRP) Composite Gates, Bulkheads, and Various Lock Components such as Concrete Rebar, Plate, Ladders, and Handrail for the Brandon Road Interbasin Project (BRIP) W912EK26Z0001

Solicitation W912EK26Z0001 Copied Notice ID 5dce4373bd2f4f8a86bdcdb551a49120 Copied DEPT OF DEFENSE — ENDIST ROCK ISLAND
SAM.gov
Posted
Nov 24, 2025
Deadline
Dec 02, 2025
Set-aside
None
NAICS
N/A
PSC
N/A

Summary

AI-generated · Nov 25, 2025

A virtual Industry Day is being held to discuss the design, fabrication, and delivery of FRP composite components for the Brandon Road Interbasin Project, including two large FRP filling/emptying valves (approximately 14x14 ft each), two FRP bulkheads (14x14 ft), two flushing valves (8x8 ft, 12 in thick), two dam head gates (16x16 ft), and substantial auxiliary FRP items such as plates, rebar, ladders, handrails, and other pultruded shapes. Draft plans and specifications will be issued later via an amendment, and the session seeks feedback from engineers, manufacturers, and fabricators with relevant experience to help shape upcoming requirements, including design, fabrication, delivery, installation, and site preparation.

Participation requires contacting the designated contract specialists, submitting an Excel Vendor Info Sheet with capability statements, and monitoring SAM.gov for updates. An Industry Day presentation link will be sent by email prior to the event, and a recording may be available on request. A round-table discussion may be offered later upon request. No proprietary data should be submitted, and no reimbursements will be provided for information, attendance, or follow-up contributions.

Description of Project: The US Army Corps of Engineers, Rock Island District, is hosting a VIRTUAL Industry Day on Thursday, December 4, 2025, at 10:00 a.m. CST, regarding the fabrication and delivery of fiber reinforced polymer (FRP) valves, bulkheads, and many auxiliary components for the Brandon Road Lock and Dam (BRLD) megaproject (https://www.mvr.usace.army.mil/brip/). The project will include the design, fabrication, and supply of the following fiber reinforced polymer (FRP) composite structures: Two filling and emptying valves nominally 14 feet long by 14 feet tall. These two valves are located at the upstream filling and emptying system, one on the land wall and one on the river wall. Two filling and emptying bulkheads nominally 14 feet long by 14 feet tall. These two bulkheads are located downstream of the upstream filling and emptying system. Two flushing valves nominally 8 feet long by 8 feet tall and 12 inches thick. These two flushing valves are located just upstream of the FRP composite filling and emptying valves. Two dam head gates nominally 16 feet long by 16 feet tall and 12 inches thick. These two head gates are located on the dam before the spillway section. Auxiliary components include large quantities of FRP plate, concrete reinforcement/rebar, ladders, handrail, and other shapes that could be pultruded. The Government seeks feedback from engineers, manufacturers, and fabricators with experience overseeing similar projects, which will be used for planning purposes. Draft plans and specifications are forthcoming and will be provided through an amendment to this announcement. This Industry Day will be an excellent opportunity for contractors with the anticipated NAICS codes 326199, 325999, and 237990. This effort is to help shape upcoming requirements and to virtually meet the USACE team. Manufacturing, Construction and Engineering firms with experience in the design and fabrication of bulkheads are highly encouraged to attend. There will also be discussion where the Government will be seeking feedback regarding design, fabrication, delivery, USACE or contractor installation, and site preparation for this work. ADDITIONAL Information Required: All interested parties must contact Contract Specialist Jake Anderson at jake.t.anderson@usace.army.mil and Contracting Officer Ryan Larrison at ryan.r.larrison@usace.army.mil No Later than 02DEC2025, 10:00AM CST, your email subjectline should be addressed as Industry Day Request (Company Name) W912EK26Z0001, Fiber Reinforced Polymer (FRP) Composite Gates, Bulkheads, and Various Lock Components such as Concrete Rebar, Plate, Ladders, and Handrail for the Brandon Road Interbasin Project (BRIP) to ensure the request is handled in a timely manner. Please provide your company information by filling out the excel spreadsheet labeled 2. Vendor Info Sheet and capability statements to Jake Anderson at jake.t.anderson@usace.army.mil and Ryan Larrison at ryan.r.larrison@usace.army.mil no Later than 02DEC2025, 10:00AM CST. All interested offerors are required to access SAM.gov for future updates. The link to access the Industry Day Presentation will be sent via Email prior to 02DEC2025 Failure to contact Jake Anderson and Ryan Larrison on the above date may result in your inability to attend the Industry Day for the Fiber Reinforced Polymer (FRP) Composite Gates, Bulkheads, and Various Lock Components such as Concrete Rebar, Plate, Ladders, and Handrail for the Brandon Road Interbasin Project (BRIP). A meeting recording will also be available upon request for those not able to attend live, please mention this in your email if able to attend or not. A round table discussion will be available at a later date upon request from . Send the request to Jake Anderson at jake.t.anderosn@usace.army.mil and Ryan Larrison at ryan.r.larrison@usace.army.mil. Notes: DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENTIAL DATA. NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE AT THE INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTD.

From Special Notice posted on Nov 24, 2025

Description of Project: The US Army Corps of Engineers, Rock Island District, is hosting a VIRTUAL Industry Day on Thursday, December 4, 2025, at 10:00 a.m. CST, regarding the fabrication and delivery of fiber reinforced polymer (FRP) valves, bulkheads, and many auxiliary components for the Brandon Road Lock and Dam (BRLD) megaproject (https://www.mvr.usace.army.mil/brip/). The project will include the design, fabrication, and supply of the following fiber reinforced polymer (FRP) composite structures: Two filling and emptying valves nominally 14 feet long by 14 feet tall. These two valves are located at the upstream filling and emptying system, one on the land wall and one on the river wall. Two filling and emptying bulkheads nominally 14 feet long by 14 feet tall. These two bulkheads are located downstream of the upstream filling and emptying system. Two flushing valves nominally 8 feet long by 8 feet tall and 12 inches thick. These two flushing valves are located just upstream of the FRP composite filling and emptying valves. Two dam head gates nominally 16 feet long by 16 feet tall and 12 inches thick. These two head gates are located on the dam before the spillway section. Auxiliary components include large quantities of FRP plate, concrete reinforcement/rebar, ladders, handrail, and other shapes that could be pultruded. The Government seeks feedback from engineers, manufacturers, and fabricators with experience overseeing similar projects, which will be used for planning purposes. Draft plans and specifications are forthcoming and will be provided through an amendment to this announcement. This Industry Day will be an excellent opportunity for contractors with the anticipated NAICS codes 326199, 325999, and 237990. This effort is to help shape upcoming requirements and to virtually meet the USACE team. Manufacturing, Construction and Engineering firms with experience in the design and fabrication of bulkheads are highly encouraged to attend. There will also be discussion where the Government will be seeking feedback regarding design, fabrication, delivery, USACE or contractor installation, and site preparation for this work. ADDITIONAL Information Required: All interested parties must contact Contract Specialist Jake Anderson at jake.t.anderson@usace.army.mil and Contracting Officer Ryan Larrison at ryan.r.larrison@usace.army.mil No Later than 02DEC2025, 10:00AM CST, your email subjectline should be addressed as Industry Day Request (Company Name) W912EK26Z0001, Fiber Reinforced Polymer (FRP) Composite Gates, Bulkheads, and Various Lock Components such as Concrete Rebar, Plate, Ladders, and Handrail for the Brandon Road Interbasin Project (BRIP) to ensure the request is handled in a timely manner. Please provide your company information by filling out the excel spreadsheet labeled 2. Vendor Info Sheet and capability statements to Jake Anderson at jake.t.anderson@usace.army.mil and Ryan Larrison at ryan.r.larrison@usace.army.mil no Later than 02DEC2025, 10:00AM CST. All interested offerors are required to access SAM.gov for future updates. The link to access the Industry Day Presentation will be sent via Email prior to 02DEC2025 Failure to contact Jake Anderson and Ryan Larrison on the above date may result in your inability to attend the Industry Day for the Fiber Reinforced Polymer (FRP) Composite Gates, Bulkheads, and Various Lock Components such as Concrete Rebar, Plate, Ladders, and Handrail for the Brandon Road Interbasin Project (BRIP). A meeting recording will also be available upon request for those not able to attend live, please mention this in your email if able to attend or not. A round table discussion will be available at a later date upon request from . Send the request to Jake Anderson at jake.t.anderosn@usace.army.mil and Ryan Larrison at ryan.r.larrison@usace.army.mil. Notes: DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENTIAL DATA. NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE AT THE INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTD.

From Special Notice posted on Nov 25, 2025

Notice history

2
  1. Special Notice Posted Nov 24, 2025
  2. Special Notice LATEST Posted Nov 25, 2025
    No changes from previous notice

Details

Solicitation number W912EK26Z0001
Notice ID 5dce4373bd2f4f8a86bdcdb551a49120
Notice type Special Notice
Place of performance Joliet, Illinois
Archive date Dec 17, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Jake Anderson

Email

secondary
Ryan R. Larrison

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION MISSISSIPPI VALLEY
ENDIST ROCK ISLAND

Place of Performance

Joliet, Illinois
USA

Dates

Posted Nov 24, 2025 8 months ago
Last Updated Aug 06, 2026 1 day ago
Due Dec 02, 2025 8 months ago