INDICATOR,AIR SPEED SPRPA125QEW96
Summary
AI-generated · Sep 27, 2025Air-speed indicator (Indicator, Air Speed) is being procured under an urgent, fixed-price requirement that must come from an approved manufacturing source identified on a source-control or DoD-STD-100 drawing. No substitutions from other sources are allowed; the government does not provide the necessary data rights or drawings for alternative sources, and the part must be acquired from the specified manufacturing source. The contract requires prior authorization before award, and the item will be inspected and accepted at the origin (FOB origin).
If you are an approved distributor of the source, you must submit an authorized distributor letter with your proposal; failure to provide this letter will render the bid non-responsive. Past performance must be at an acceptable level as documented in SPRS/FAPIIS to be eligible for award. Warranty terms are included for noncomplex supplies. The procurement is conducted under Emergency Acquisition Flexibilities.
CONTACT INFORMATION|4|APBC.08|LORAINE SMITH|445-737-4000|LORAINE.SMITH@DLA.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|X|X|||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|N/A|2:1 COMBO| |SPRPA1| | | | ||||||||| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|4||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 DAYS|45 DAYS AFTER DELIVERY||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|334511|1350||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|N/A| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| This requirement is being solicited under Emergency Acquisition Flexibilities (EAF) (FAR 5.202(a)(2) THE FOLLOWING IS INCORPORATED INTO SECTION M OF THIS SOLICITATION: This item requires prior authorization and Award will be made to the approvedPast performance must be at an acceptable level as documented in SPRS -FAPIIS. Offerors are advised that offers received from sources which are notgovernment-approved sources of supply, for this part(s) will be deemedtechnically unacceptable, and therefore ineligible for award. Any distributorsof approved source(s) MUST submit a copy of their authorized distributorletter, on the source's letterhead, to the buyer point of contact indicated onthe solicitation via email, at time of proposal submittal. Failure to providethe approved distributor letter will deem the proposal non-responsive andt technically unacceptable and ineligible for award. This part must be acquired from a manufacturing source(s) specified on a source control or selected item drawing as defined by the current version of DoD-STD-100. Suitable technical data, Government data rights, or manufacturing knowledge are not available to permit acquisition from other sources, nor qualification testing of another part, nor use of a second source part in the intended application. Although, by DoD-STD-100 definition, altered and selected items shall have an adequate technical data package, data review discloses that required data or data rights are not in Government possession and cannot be economically obtained. FOB ORIGIN INSPECT/ACCEPT ORIGIN THE GOVERNMENT DOES NOT HAVE DRAWINGS \" f2fec610a2a6404c9ada67e862a52a62"
From Solicitation posted on Sep 19, 2025CONTACT INFORMATION|4|APBC.08|LORAINE SMITH|445-737-4000|LORAINE.SMITH@DLA.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|X|X|||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|N/A|2:1 COMBO| |SPRPA1| | | | ||||||||| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|4||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 DAYS|45 DAYS AFTER DELIVERY||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|X|X|||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|334511|1350||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|N/A| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| The purpose of this amendment is to update clauses to the most recent revisions, and to add a SubClin. The following Clauses were updated to their revised form. 252.204-7007 252.225-7013 52.222-50 The following change to CLIN 0001 applies Add SubClin 0002, Quantity 4/ea. Total of all SubClins is 5/ea. All other terms and conditions remain unchanged. This requirement is being solicited under Emergency Acquisition Flexibilities (EAF) (FAR 5.202(a)(2) THE FOLLOWING IS INCORPORATED INTO SECTION M OF THIS SOLICITATION: This item requires prior authorization and Award will be made to the approvedPast performance must be at an acceptable level as documented in SPRS -FAPIIS. Offerors are advised that offers received from sources which are notgovernment-approved sources of supply, for this part(s) will be deemedtechnically unacceptable, and therefore ineligible for award. Any distributorsof approved source(s) MUST submit a copy of their authorized distributorletter, on the source's letterhead, to the buyer point of contact indicated onthe solicitation via email, at time of proposal submittal. Failure to providethe approved distributor letter will deem the proposal non-responsive andt technically unacceptable and ineligible for award. This part must be acquired from a manufacturing source(s) specified on a source control or selected item drawing as defined by the current version of DoD-STD-100. Suitable technical data, Government data rights, or manufacturing knowledge are not available to permit acquisition from other sources, nor qualification testing of another part, nor use of a second source part in the intended application. Although, by DoD-STD-100 definition, altered and selected items shall have an adequate technical data package, data review discloses that required data or data rights are not in Government possession and cannot be economically obtained. FOB ORIGIN INSPECT/ACCEPT ORIGIN THE GOVERNMENT DOES NOT HAVE DRAWINGS \" 97e05932d83c4dee882598e726674fc8"
From Solicitation posted on Oct 06, 2025Notice history
2-
Solicitation Posted Sep 19, 2025
Details
Award Information
Not yet awarded