ILLINOIS WATERWAY HYDRAULIC DREDGING INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) RIVER MILE 0.0 TO RIVER MILE 291.0 W912EK26RA003
Summary
AI-generated · Dec 23, 2025Indefinite-delivery/indefinite-quantity hydraulic dredging is required along the Illinois Waterway from river mile 0.0 to 291.0 to maintain navigable depths and authorized channel dimensions for the safe movement of commercial and recreational vessels.
The work addresses ongoing sediment deposition and must balance navigational needs with environmental concerns, including sediment disposal impacts, water quality, and habitat preservation. Ongoing maintenance dredging is essential to support economic activity, flood risk management, and overall waterway reliability.
The U.S. Army Corps of Engineers conducts dredging operations to maintain navigable waterways, ensuring the safe and efficient movement of commercial and recreational vessels. The Illinois Waterway, a critical transportation corridor, experiences continuous sediment deposition, which can create navigation hazards and reduce channel depths. Historical efforts to manage sedimentation have included periodic dredging to maintain authorized channel dimensions and prevent disruptions to river traffic. Key challenges include balancing navigational needs with environmental concerns, such as sediment disposal impacts, water quality, and habitat preservation. Ongoing maintenance dredging is essential to support economic activity, flood risk management, and overall waterway reliability.
From Solicitation posted on Dec 22, 2025Notice history
1-
Solicitation LATEST Posted Dec 22, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA