Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation NONE Expired 2 notices 1 document

IDS Maintenance Services for Fort Hunter Liggett and PRFTA, CA W911SA25QA105

Solicitation W911SA25QA105 Copied Notice ID 51cdba1a1e3f4f1786c02fa68a317654 Copied DEPT OF DEFENSE — W6QM MICC FT MCCOY (RC)
SAM.gov
Posted
Jul 10, 2025
Deadline
Jul 13, 2025
Set-aside
NONE
NAICS
561621
PSC
J063

Summary

AI-generated · Aug 24, 2025

Maintenance and repair of Commercial Off-The-Shelf intrusion detection and access control system components and badging systems at Fort Hunter Liggett and Parks Reserve Forces Training Area (PRFTA), CA. The contract includes a base period with three option years and a six-month extension option; proposals are to be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module, following the posted offer instructions.

Amendments indicate the set-aside has been updated to unrestricted and add FAR clauses 52.219-8, 52.219-9, and 52.219-16 (with a later amendment adding 52.219-14, Limitations on Subcontracting). They also update period-of-performance/contract start dates, adjust the price schedule to reflect varying base-year lengths, extend the quote due date, and provide vendor Q&A and updates to Attachment 5 (System Component Equipment Listing and Facility Location). A signed copy of each amendment must be submitted with the quote.

THE PURPOSE OF AMENDMENT 0005 IS TO UPDATE THE SET-ASIDE TO UNRESTRICTED, UPDATE THE POP DATES TO START 08/01, AND UPDATE THE PRICE SCHEDULE TO REFLECT THE 12 MONTH BASE YEAR. CLAUSES 52.219-8, 52.219-9, AND 52.219-16 HAVE ALSO BEEN ADDED. The purpose of amendment four (4) is to update the small business set-aside, update the POP dates and contract effective date to June 15, 2025, and update the price schedule to reflect the 11.5 month base year. All other terms and conditions remain unchanged. Please note a signed copy of the amendment must be submitted in addition to other requirements at time of quote. The purpose of amendment three (3) is to update FAR Clause 52.212-5 to include 52.219-14, Limitations on Subcontracting. All other terms and conditions remain unchanged. Please note a signed copy of the amendment must be submitted in addition to other requirements at time of quote. The purpose of amendment two (2) is extend the quote due date. All other terms and conditions of this solicitation remain unchanged. Please note a signed copy of the amendment must be submitted in addition to other requirements at time of quote. The purpose of amendment one (1) is to answer questions from vendors, update Attachment 5- System Component Equipment Listing and Facility Location, and extended the solicitation close date to Monday May 12, 2025. All other terms and conditions of this solicitation remain unchanged. Please note a signed copy of the amendment must be submitted in addition to other requirements at time of quote. Maintenance and repair of Commercial Off-The-Shelf Intrusion Detection and Access Control System Components, and Badging systems located at various facilities located at Fort Hunter Liggett and Parks Reserve Forces Training Area. The Period of Performance base period is from 1 June 2025 to 31 May 2026. Requirement includes three (3) option years and a six (6) month option to extend services. Quote Submission: Electronic copies of documents shall be submitted through the "Solicitation Module" of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/ . For instructions on how to post an offer, please refer to the Posting Offer demonstration: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf Solicitation link: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911SA25QA105&noticeType=CombinedSynopsisSolicitation

From Combined Synopsis/Solicitation posted on Jul 01, 2025

THE PURPOSE OF AMENDMENT 0006 IS TO ANSWER VENDOR QUESTIONS. THE PURPOSE OF AMENDMENT 0005 IS TO UPDATE THE SET-ASIDE TO UNRESTRICTED, UPDATE THE POP DATES TO START 08/01, AND UPDATE THE PRICE SCHEDULE TO REFLECT THE 12 MONTH BASE YEAR. CLAUSES 52.219-8, 52.219-9, AND 52.219-16 HAVE ALSO BEEN ADDED. The purpose of amendment four (4) is to update the small business set-aside, update the POP dates and contract effective date to June 15, 2025, and update the price schedule to reflect the 11.5 month base year. All other terms and conditions remain unchanged. Please note a signed copy of the amendment must be submitted in addition to other requirements at time of quote. The purpose of amendment three (3) is to update FAR Clause 52.212-5 to include 52.219-14, Limitations on Subcontracting. All other terms and conditions remain unchanged. Please note a signed copy of the amendment must be submitted in addition to other requirements at time of quote. The purpose of amendment two (2) is extend the quote due date. All other terms and conditions of this solicitation remain unchanged. Please note a signed copy of the amendment must be submitted in addition to other requirements at time of quote. The purpose of amendment one (1) is to answer questions from vendors, update Attachment 5- System Component Equipment Listing and Facility Location, and extended the solicitation close date to Monday May 12, 2025. All other terms and conditions of this solicitation remain unchanged. Please note a signed copy of the amendment must be submitted in addition to other requirements at time of quote. Maintenance and repair of Commercial Off-The-Shelf Intrusion Detection and Access Control System Components, and Badging systems located at various facilities located at Fort Hunter Liggett and Parks Reserve Forces Training Area. The Period of Performance base period is from 1 June 2025 to 31 May 2026. Requirement includes three (3) option years and a six (6) month option to extend services. Quote Submission: Electronic copies of documents shall be submitted through the "Solicitation Module" of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/ . For instructions on how to post an offer, please refer to the Posting Offer demonstration: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf Solicitation link: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911SA25QA105&noticeType=CombinedSynopsisSolicitation

From Combined Synopsis/Solicitation posted on Jul 10, 2025

Notice history

2
  1. Combined Synopsis/Solicitation Posted Jul 01, 2025 View
  2. Combined Synopsis/Solicitation LATEST Posted Jul 10, 2025
    • Description: Description was updated

Details

Solicitation number W911SA25QA105
Notice ID 51cdba1a1e3f4f1786c02fa68a317654
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) J063
NAICS 561621
Set-aside No Set aside used
Place of performance Jolon, California
Archive date Jul 28, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
April M. Hericks

Email

secondary
Leslie Koenig

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
MISSION INSTALLATION CONTRACTING COMMAND
419TH CSB
W6QM MICC FT MCCOY (RC)

Place of Performance

Jolon, California
USA

Dates

Posted Jul 10, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 13, 2025 1 year ago