Hydro Axe Removal Services FA500425Q0043
Summary
AI-generated · Aug 24, 2025Contractor to furnish all labor, transportation, materials, engineering and equipment to perform brush and tree clearing (hydro-axing) along rights-of-way at Eielson AFB and Birch Lake Military Recreation Camp. The cleared areas are around power lines and a JP-8 fueling pipeline, totaling about 25 to 50 acres across both sites. Rights-of-way must be cleared to an overall width of 60 feet (30 feet on each side of poles or pipelines), except Birch Lake Camp, where the width is 20 feet on each side. Work aims to prevent trees from contacting high-voltage lines and to maintain access for maintenance and repairs; areas around current and future lines and pipelines are included as shown on the project maps.
There will be a site visit at the CE Maintenance Shops, Bldg. 2351, Central Avenue, Eielson AFB, to review site conditions and requirements. A formal process exists for Requests for Information, with RFIs answered via amendment, and an amendment has updated the Performance Work Statement to reflect adjusted work hours; all other terms remain the same. Attachments contain the relevant maps and documentation, and the solicitation includes standard proposal and submission details.
Eielson Air Force Base, Alaska is issuing a solicitation for Hydro Axe Services. Description of Services: Contractor to furnish all labor, transportation, materials, engineering and equipment to perform brush and tree clearing services on Eielson AFB to include services at Birch Lake Military Recreation Camp. Eielson AFB and Birch Lake has approximately 25 acres, not to exceed 50 acres of power line and pipeline, right of ways, that require hydro axed to prevent trees from coming into contact with the high voltage overhead power lines and to keep power line right of ways clear for maintenance purposes. Additionally, maintenance access needs to be made to conduct maintenance and repairs to the JP8 pipeline fueling systems supplying fuel to the flying missions. These rights of ways need to be hydro axed to an overall width of 60ft, 30ft on each side of the pole or pipeline, with the exception of Birch Lake Military Recreation Camp. That area will be 20 feet on each side of the lines. These sections around Eielson, which will be included in the map section, are around power lines or future power lines and pipelines that require hydro-axing. The total area for the service is approximately 25 acres, not to exceed 50 acres between the two locations. See attachment, Maps, for required land coverage. Period of Performance: 1 August 2025 30 September 2025 Site Visit: A site visit will be conducted on 14 July 2025. Contractors should report to the CE Maintenance Shops building parking lot located at Bldg. 2351, Central Avenue, Eielson AFB, AK at 09:00 AM (AKST). The Point of Contact for the site visit is listed as follows: Name: Vanessa Gray Email: vanessa.gray.3@us.af.mil Phone: 3166650811 Request for Information: All Requests for Information from interested parties must be submitted formally no later than 16 July 2025 at 11:00 AM (AKST) via email to james.cameron.15@us.af.mil and vanessa.gray.3@us.af.mil. They will be answered via an amendment to the solicitation. Proposal Due Date: 22 July 2025 at 11:00 AM (AKST) via email to james.cameron.X@us.af.mil and vanessa.gray.3@us.af.mil.
From Solicitation posted on Jun 30, 2025Amendment 0001 - Amendment 0001 has been issued to: Provide responses to all RFIs received by the deadline. Update the Performance Work Statement to include adjusted work hours. All other terms and conditions remain unchanged. Please see Attachments 1-4 for relevant documentation to the Amendment. _________________________________________________________________________ Eielson Air Force Base, Alaska is issuing a solicitation for Hydro Axe Services. Description of Services: Contractor to furnish all labor, transportation, materials, engineering and equipment to perform brush and tree clearing services on Eielson AFB to include services at Birch Lake Military Recreation Camp. Eielson AFB and Birch Lake has approximately 25 acres, not to exceed 50 acres of power line and pipeline, right of ways, that require hydro axed to prevent trees from coming into contact with the high voltage overhead power lines and to keep power line right of ways clear for maintenance purposes. Additionally, maintenance access needs to be made to conduct maintenance and repairs to the JP8 pipeline fueling systems supplying fuel to the flying missions. These rights of ways need to be hydro axed to an overall width of 60ft, 30ft on each side of the pole or pipeline, with the exception of Birch Lake Military Recreation Camp. That area will be 20 feet on each side of the lines. These sections around Eielson, which will be included in the map section, are around power lines or future power lines and pipelines that require hydro-axing. The total area for the service is approximately 25 acres, not to exceed 50 acres between the two locations. See attachment, Maps, for required land coverage. Period of Performance: 1 August 2025 30 September 2025 Site Visit: A site visit will be conducted on 14 July 2025. Contractors should report to the CE Maintenance Shops building parking lot located at Bldg. 2351, Central Avenue, Eielson AFB, AK at 09:00 AM (AKST). The Point of Contact for the site visit is listed as follows: Name: Vanessa Gray Email: vanessa.gray.3@us.af.mil Phone: 3166650811 Request for Information: All Requests for Information from interested parties must be submitted formally no later than 16 July 2025 at 11:00 AM (AKST) via email to james.cameron.15@us.af.mil and vanessa.gray.3@us.af.mil. They will be answered via an amendment to the solicitation. Proposal Due Date: 22 July 2025 at 11:00 AM (AKST) via email to james.cameron.15@us.af.mil and vanessa.gray.3@us.af.mil.
From Solicitation posted on Jul 17, 2025Amendment 0001 - Amendment 0001 has been issued to: Provide responses to all RFIs received by the deadline. Update the Performance Work Statement to include adjusted work hours. All other terms and conditions remain unchanged. Please see Attachments 1-4 for relevant documentation to the Amendment. _________________________________________________________________________ Eielson Air Force Base, Alaska is issuing a solicitation for Hydro Axe Services. Description of Services: Contractor to furnish all labor, transportation, materials, engineering and equipment to perform brush and tree clearing services on Eielson AFB to include services at Birch Lake Military Recreation Camp. Eielson AFB and Birch Lake has approximately 25 acres, not to exceed 50 acres of power line and pipeline, right of ways, that require hydro axed to prevent trees from coming into contact with the high voltage overhead power lines and to keep power line right of ways clear for maintenance purposes. Additionally, maintenance access needs to be made to conduct maintenance and repairs to the JP8 pipeline fueling systems supplying fuel to the flying missions. These rights of ways need to be hydro axed to an overall width of 60ft, 30ft on each side of the pole or pipeline, with the exception of Birch Lake Military Recreation Camp. That area will be 20 feet on each side of the lines. These sections around Eielson, which will be included in the map section, are around power lines or future power lines and pipelines that require hydro-axing. The total area for the service is approximately 25 acres, not to exceed 50 acres between the two locations. See attachment, Maps, for required land coverage. Period of Performance: 1 August 2025 30 September 2025 Site Visit: A site visit will be conducted on 14 July 2025. Contractors should report to the CE Maintenance Shops building parking lot located at Bldg. 2351, Central Avenue, Eielson AFB, AK at 09:00 AM (AKST). The Point of Contact for the site visit is listed as follows: Name: Vanessa Gray Email: vanessa.gray.3@us.af.mil Phone: 3166650811 Request for Information: All Requests for Information from interested parties must be submitted formally no later than 16 July 2025 at 11:00 AM (AKST) via email to jedidiah.lee@us.af.mil and tara.richmond@us.af.mil. They will be answered via an amendment to the solicitation. Proposal Due Date: 22 July 2025 at 11:00 AM (AKST) via email to jedidiah.lee@us.af.mil and tara.richmond@us.af.mil.
From Solicitation posted on Jul 18, 2025Notice history
3Details
Award Information
Not yet awarded
Documents
8Contacts
Phone
Phone
Agency
Place of Performance
USA