HVAC and Plumbing Installation 19AU9025Q0009
Summary
AI-generated · Aug 24, 2025Perform HVAC and plumbing installation at a USG-owned building in Vienna, Austria. Work includes demolishing two radiators and pipes on the first and second floors to create space for new elevator access doors; preparing workshop drawings and an assembly plan for two new wall-mounted radiators to be installed next to the elevator doors; delivering and installing the radiators and piping, integrating them into the existing gas heating system; providing ventilation inside the elevator shaft; installing a sump pump in the shaft pit; relocating utilities including a main water pipe (14 meters) and eight garden hoses (each 14 meters long); and testing, commissioning, and certifying density, pressure, and thermal data.
The project requires coordinating these installations, including drafting/planning, and completing all required testing and certifications. Estimated project size is between $25,000 and $100,000.
This solicitation specification covers the HVAC and plumbing installation at a USG-owned building in Vienna, Austria. The work consists of, but is not limited to the following: Demolition of 2 radiators and pipes (1. Floor, 2. Floor) in the location that will be new access doors to a new elevator Workshop drawings and assembly planning of 2 new wall radiators , in the new positions vertically next to the elevator access doors Delivery and assembly of 2 radiators and pipes in the new positions, implementation into the existing gas-heating system Ventilation inside the elevator shaft Sump pump for the shaft pit Relocation of utilities: main waterpipe (14m) and 8 garden water hoses (8x14m) Tests, commissioning and certificates for density, pressure and thermal data Estimated size of the project according to FAR 36.204 is between $25,000 and $100,000.
From Solicitation posted on Jun 02, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
AUT