Hulah Lake Toe Drain, Bowring, Oklahoma W912BV25RA004

Solicitation W912BV25RA004 Copied Notice ID 7ce00dd9476a410cb8bc80a70c89b2f9 Copied DEPT OF DEFENSE — W076 ENDIST TULSA
SAM.gov
Posted
Jun 27, 2025
Deadline
Jul 25, 2025
Set-aside
SBA
NAICS
237990
PSC
Z1KA

Summary

AI-generated · Aug 24, 2025

Demolition work includes removing the existing toe drain system (toe drain piping, manholes, and relief well connections), except for the segment between existing manholes 6 and 8.2. Remove three toe road culverts, including culvert pipes and flare ends. Install a new toe drain system with perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping, tying into existing manholes 6 and 8.4. Also construct new toe road culverts using reinforced concrete pipe with precast flared ends and riprap around the new flared ends.

All four records contain the same project scope; no new information or changes have been introduced between notices.

PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system including, but not limited to, perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping. The new toe drain system will tie into the existing manholes 6 and 8.4. Construction of new toe road culverts including, but not limited to, reinforced concrete pipe, pre-cast flared ends, and riprap around new flared ends.

From Solicitation posted on Jun 27, 2025

PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system including, but not limited to, perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping. The new toe drain system will tie into the existing manholes 6 and 8.4. Construction of new toe road culverts including, but not limited to, reinforced concrete pipe, pre-cast flared ends, and riprap around new flared ends.

From Solicitation posted on Jul 11, 2025

PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system including, but not limited to, perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping. The new toe drain system will tie into the existing manholes 6 and 8.4. Construction of new toe road culverts including, but not limited to, reinforced concrete pipe, pre-cast flared ends, and riprap around new flared ends.

From Solicitation posted on Jul 17, 2025

PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system including, but not limited to, perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping. The new toe drain system will tie into the existing manholes 6 and 8.4. Construction of new toe road culverts including, but not limited to, reinforced concrete pipe, pre-cast flared ends, and riprap around new flared ends.

From Solicitation posted on Jul 23, 2025

Notice history

4
  1. Solicitation Posted Jun 27, 2025
  2. Solicitation Posted Jul 11, 2025
    No changes from previous notice
  3. Solicitation Posted Jul 17, 2025
    • Response Deadline: Jul 25, 2025Jul 30, 2025
  4. Solicitation LATEST Posted Jul 23, 2025
    No changes from previous notice

Details

Solicitation number W912BV25RA004
Notice ID 7ce00dd9476a410cb8bc80a70c89b2f9
Notice type Solicitation
Product / Service (PSC) Z1KA
NAICS 237990
Archive date Jun 27, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Tyler HASTINGS

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTHWESTERN
W076 ENDIST TULSA

Place of Performance

396120 State Hwy 10 Copan, OK 74022
74056

Dates

Posted Jun 27, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 25, 2025 1 year ago