Hulah Lake Toe Drain, Bowring, Oklahoma W912BV25RA004
Summary
AI-generated · Aug 24, 2025Demolition work includes removing the existing toe drain system (toe drain piping, manholes, and relief well connections), except for the segment between existing manholes 6 and 8.2. Remove three toe road culverts, including culvert pipes and flare ends. Install a new toe drain system with perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping, tying into existing manholes 6 and 8.4. Also construct new toe road culverts using reinforced concrete pipe with precast flared ends and riprap around the new flared ends.
All four records contain the same project scope; no new information or changes have been introduced between notices.
PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system including, but not limited to, perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping. The new toe drain system will tie into the existing manholes 6 and 8.4. Construction of new toe road culverts including, but not limited to, reinforced concrete pipe, pre-cast flared ends, and riprap around new flared ends.
From Solicitation posted on Jun 27, 2025PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system including, but not limited to, perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping. The new toe drain system will tie into the existing manholes 6 and 8.4. Construction of new toe road culverts including, but not limited to, reinforced concrete pipe, pre-cast flared ends, and riprap around new flared ends.
From Solicitation posted on Jul 11, 2025PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system including, but not limited to, perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping. The new toe drain system will tie into the existing manholes 6 and 8.4. Construction of new toe road culverts including, but not limited to, reinforced concrete pipe, pre-cast flared ends, and riprap around new flared ends.
From Solicitation posted on Jul 17, 2025PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system including, but not limited to, perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping. The new toe drain system will tie into the existing manholes 6 and 8.4. Construction of new toe road culverts including, but not limited to, reinforced concrete pipe, pre-cast flared ends, and riprap around new flared ends.
From Solicitation posted on Jul 23, 2025Notice history
4-
Solicitation Posted Jun 27, 2025
-
Solicitation Posted Jul 11, 2025No changes from previous notice
-
Solicitation LATEST Posted Jul 23, 2025No changes from previous notice