HQ AFOTEC Hallway Carpet and Painting FA7046Q0004ss
Summary
AI-generated · Aug 24, 2025Remove and replace carpet and cove base in the hallways of Building 20130, excluding the Command Staff hallway and the A-3 area, and install transition strips between the hallway carpet and each doorway.
Paint scope includes hallways above and below the wooden chair rails, three stairwells, door jams, window frames on both sides of the window openings at the Wyoming, Gibson, and Southside Courtyard entrances’ inner walls, and the handrails (excluding the A-3 area). The work also includes breezeways in front of the A-6 CST office area and the South breezeways on the first and second floors. Refinish the hallway wooden chair railings and the wooden handrails and top caps in the three stairwells.
Remove and replace carpet and cove base in hallways of Bldg. 20130, excluding the Command Staff hallway and the A-3 area. Install transition strips between the hallway carpet and each doorway. Paint Bldg. 20130 hallways above and below the wooden chair rails, 3 stairwells, door jams, window frames (both sides of window frames on Wyoming, Gibson, and Southside Courtyard entrance inner wall of windows), and handrails, excluding the A-3 area. The hallways include breezeways in front of the A-6 CST office area, and the South breezeways on both the first and second floor. Refinish the hallway wooden chair railings. Refinish the wooden handrails and top caps in 3 stairwells.
From Sources Sought posted on Aug 13, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA