Housing Floor Replacement 36C24525Q0698
Summary
AI-generated · Aug 24, 2025Replace existing flooring in three of the five village houses at the Perry Point campus, where veterans in the Mental Health Constructive Work Therapy program reside. The contractor will prepare the site, demolish and remove existing flooring, and supply all labor and materials to install new flooring in PP CWT/TR Homes 1118, 1119, 1159, 1160 and 1162, covering rooms, corridors, and related areas.
Install J&J Classics II #V5023 in color Heirloom #1003, approximately 1,053 square feet per area as reflected in quotes. Construction will occur in multiple phases to fit around clinical operations and must be performed after hours, on weekends, and during holidays to minimize disruption to patient services and access. Period of performance is up to 30 days from start. The contractor must field-verify, before bidding, the requirements to install flooring under and around the existing modular wall system.
STATEMENT OF WORK The purpose of this request is for flooring replacement in three of the five village houses on the Perry Point campus. Veterans enrolled in Mental Health s Constructive Work Therapy (CWT) program reside in these houses. The Contractor shall completely prepare site for building operations, including demolition and removal of existing flooring, and furnish labor and materials to perform the work which includes the PP CWT/TR Homes 1118, 1119, 1159, 1160 & 1162. The flooring in rooms, corridors and areas is to be replaced with J&J Classics II #V5023 - Color: Heirloom #1003, with an approximate square footage of an average 1053 SF as per quotes. Work shall be completed in multiple phases around clinical schedule as necessary, and only after hours and weekends (including holidays), to allow the service to continue to function at normal hours with little to no interruptions of patient service and access during project. The period of performance will take up to 30 days once it is initiated. The Contractor shall field verify before bid the requirements to install flooring under and around the existing modular wall system.
From Solicitation posted on Jul 18, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
none
Agency
Place of Performance
USA