Hill Air Force Base, UT Storage Igloos Demolition W9123825QA030

Solicitation W9123825QA030 Copied Notice ID 77446b755a2b41209a3ba0b5eb9265d3 Copied DEPT OF DEFENSE — W075 ENDIST SACRAMENTO
SAM.gov
Posted
Aug 29, 2025
Deadline
Sep 02, 2025
Set-aside
SBA
NAICS
238910
PSC
P400

Summary

AI-generated · Aug 24, 2025

Demolish two earth-covered reinforced concrete Munitions Storage Magazines at Hill Air Force Base (Buildings 1411 and 1432, total about 4,092 square feet), including removal of asbestos-containing and other regulated materials, disconnecting/capping utilities, and disposing of all debris. After demolition, restore the site to match adjacent grades with proper drainage and reseed per Hill AFB requirements. The scope also covers access roads, six-inch asphalt approach aprons, lightning protection, utilities, site improvements, and communications support. Work must allow grading and drainage restoration to prevent stormwater pooling, with an estimated 365 calendar days to complete under a firm-fixed-price contract using lowest-price technically acceptable selection; small-business set-aside is possible if at least two responsible small concerns can perform at fair market prices, otherwise full and open competition applies. Bids will be submitted through PIEE and SAM, with prospective Offerors required to register in PIEE to bid and in SAM by the closing date; monitor PIEE/SAM for updates, as the plan holder list and any amendments are posted there.

Between notices, the formal solicitation is planned to be posted in June 2025 with bids due in July 2025 (magnitude around $500k–$1M). Attachments will be PDFs, and any available technical data will accompany the solicitation. The only list of interested vendors is via SAM.gov. The presolicitation indicated an August 12, 2025 posting, but the actual solicitation is expected in late June 2025; no changes to the core scope, selection method, or requirements beyond confirming the posting timeline and bid process. USACE SPK will not coordinate partner arrangements or review capabilities statements in response to this synopsis; bidders should rely on PIEE/SAM for updates and amendments.

PRE-SOLICITATION NOTICE / SYNOPSIS Project Description: The U.S. Army Corps of Engineers, Sacramento District is issuing this announcement for Hill Air Force Base Storage Igloos Demolition. Anticipated Posting Date: 12 August 2025 Pre-Solicitation Notice Number: W9123825QA030 SAM Posting Title: Hill Air Force Base, UT Storage Igloos Demolition SAM Posting Description: The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for to complete the removal of two (2) earth covered reinforced concrete modular Munitions Storage Magazines (MSMs) at Hill Air Force Base (HAFB), UT. These two existing buildings are numbered 1411 and 1432 and combined equal 4092 sf total. The construction type is reinforced concrete. There is a finish membrane waterproofing layer buried between the concrete structure and finish grade. The site shall be leveled out and graded to match the existing adjacent grades in a manner that will not cause excess stormwater runoff pooling. Areas left after demolition shall be fully restored to match existing adjacent grades and vegetation specified by the reseeding requirements for Hill AFB Included in the demolition are access roads, 6 thick asphalt pavement approach aprons, lightning protection, utilities, site improvements, communication support, and all other necessary support. Additional demolition will include, but is not limited to, the abatement/removal of asbestos containing materials (ACM) and other regulated materials (ORM), disconnect/capping of utilities, disposal of all debris materials, and restoration of the site to a specified condition. Following demolition, the Contractor shall be responsible for restoring the work site with respect to grading and proper drain The Government estimates the requirement can be constructed within three hundred and sixty-five (365) calendar days. If market conditions indicate this estimate may be unrealistic, respondents are encouraged to provide specific information (such as known equipment lead times or other timeline concerns) for Government consideration when responding to this Sources Sought Notice. The potential requirement may result in a firm-fixed-price solicitation issued approximately end of June 2025. If solicited, the Government intends to award the contemplated requirement as a fixed-price contract by approximately September 2025. The Government intends to solicit and award using lowest price technically acceptable source selection process, as outlined in Federal Acquisition Regulation (FAR) Part 15, Defense FAR Supplement (DFARS) Part 215, DFARS Procedures, Guidance, and Information (PGI) Part 215, Department of Defense (DoD) Source Selection Procedures (SSP) (dated 20 August 2022), Army FAR Supplement (AFARS) Part 5115, AFARS Appendix AA, Army Source Selection Supplement (AS3) (dated 28 November 2017), and USACE Acquisition Instructions (UAI) Subpart 5115.3. In accordance with Federal Acquisition Regulation (FAR) 36.204(e) the Government currently estimates the magnitude of construction for this project to be between $500,000.00 and $1,000,000.00. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 238910, Site Preparation Contractors. The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $19,000,000.00 annual revenue. The Product Service Code for the potential requirement is anticipated to be P400, Salvage- Demolition of Buildings. If there is a reasonable expectation that at least two (2) responsible small business concerns under this NAICS can provide the anticipated services at fair market prices, the Contracting Officer is required to set the acquisition aside for small business concerns. If competition is set-aside for small businesses, FAR 52.219-14, Limitations on Subcontracting, requires that general construction small business Contractors self-perform at least twenty-five percent (25%) of the cost of the contract, not including the cost of materials. If no set aside is made, the requirement is competed with full and open competition, and the awarded Contractor is not a small business, the Contractor will be required to perform the percent of work identified in the solicitation under FAR 52.236- 1, Performance of Work by the Contractor. The solicitation will be issued through the Procurement Integrated Enterprise Environment (PIEE - https://piee.eb.mil) and Governmentwide Point of Entry, the System for Award Management (SAM - www.SAM.gov) on or about mid-to-end-June 2025 with quotes tentatively due July 2025. Please DO NOT request an updated schedule if estimated dates are surpassed; the Government will release all information publicly through PIEE and SAM when updates are available. Requests for schedule updates may be ignored. Please DO NOT request a copy of the solicitation, or draft plans or specs, as they are not currently available. Any available technical data will be furnished with any forthcoming solicitation. Following solicitation release, all responsible sources may submit a bid that shall be considered by the agency. This project and/or the anticipated solicitation may be changed, delayed, or canceled at any time. The anticipated solicitation and attachments will be posted in Portable Document Format (.pdf) which will require Adobe Acrobat Reader to open and view files. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader. All prospective Offerors must be registered in the PIEE system at least one (1) week prior to the anticipated bid due date. Registration is not required to download any forthcoming solicitation documents, plans, and/or specifications, but IS required to submit a bid. Copies of the solicitation and attachments will be made available for inspection without charge after the solicitation is released, when accessed through PIEE. Failure to register in PIEE will prevent submission of bids as the Government will not accept them by any other means. See linked PIEE registration instructions and web-based training for information about how to access the PIEE Solicitation Module and submit bids. All prospective Offerors must be registered in SAM before the anticipated solicitation closing date. Please see the SAM website for information about SAM registration requirements and approval timelines. USACE will not notify prospective Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice.

From Presolicitation posted on Aug 12, 2025

The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for to complete the removal of two (2) earth covered reinforced concrete modular Munitions Storage Magazines (MSMs) at Hill Air Force Base (HAFB), UT. These two existing buildings are numbered 1411 and 1432 and combined equal 4092 sf total. The construction type is reinforced concrete. There is a finish membrane waterproofing layer buried between the concrete structure and finish grade. The site shall be leveled out and graded to match the existing adjacent grades in a manner that will not cause excess stormwater runoff pooling. Areas left after demolition shall be fully restored to match existing adjacent grades and vegetation specified by the reseeding requirements for Hill AFB Included in the demolition are access roads, 6 thick asphalt pavement approach aprons, lightning protection, utilities, site improvements, communication support, and all other necessary support. Additional demolition will include, but is not limited to, the abatement/removal of asbestos containing materials (ACM) and other regulated materials (ORM), disconnect/capping of utilities, disposal of all debris materials, and restoration of the site to a specified condition. Following demolition, the Contractor shall be responsible for restoring the work site with respect to grading and proper drain The Government estimates the requirement can be constructed within three hundred and sixty-five (365) calendar days. If market conditions indicate this estimate may be unrealistic, respondents are encouraged to provide specific information (such as known equipment lead times or other timeline concerns) for Government consideration when responding to this Sources Sought Notice. The potential requirement may result in a firm-fixed-price solicitation issued approximately end of June 2025. If solicited, the Government intends to award the contemplated requirement as a fixed-price contract by approximately September 2025. The Government intends to solicit and award using lowest price technically acceptable source selection process, as outlined in Federal Acquisition Regulation (FAR) Part 15, Defense FAR Supplement (DFARS) Part 215, DFARS Procedures, Guidance, and Information (PGI) Part 215, Department of Defense (DoD) Source Selection Procedures (SSP) (dated 20 August 2022), Army FAR Supplement (AFARS) Part 5115, AFARS Appendix AA, Army Source Selection Supplement (AS3) (dated 28 November 2017), and USACE Acquisition Instructions (UAI) Subpart 5115.3. In accordance with Federal Acquisition Regulation (FAR) 36.204(e) the Government currently estimates the magnitude of construction for this project to be between $500,000.00 and $1,000,000.00. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 238910, Site Preparation Contractors. The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $19,000,000.00 annual revenue. The Product Service Code for the potential requirement is anticipated to be P400, Salvage- Demolition of Buildings. If there is a reasonable expectation that at least two (2) responsible small business concerns under this NAICS can provide the anticipated services at fair market prices, the Contracting Officer is required to set the acquisition aside for small business concerns. If competition is set-aside for small businesses, FAR 52.219-14, Limitations on Subcontracting, requires that general construction small business Contractors self-perform at least twenty-five percent (25%) of the cost of the contract, not including the cost of materials. If no set aside is made, the requirement is competed with full and open competition, and the awarded Contractor is not a small business, the Contractor will be required to perform the percent of work identified in the solicitation under FAR 52.236- 1, Performance of Work by the Contractor. The solicitation will be issued through the Procurement Integrated Enterprise Environment (PIEE - https://piee.eb.mil) and Governmentwide Point of Entry, the System for Award Management (SAM - www.SAM.gov) on or about mid-to-end-June 2025 with quotes tentatively due July 2025. Please DO NOT request an updated schedule if estimated dates are surpassed; the Government will release all information publicly through PIEE and SAM when updates are available. Requests for schedule updates may be ignored. Please DO NOT request a copy of the solicitation, or draft plans or specs, as they are not currently available. Any available technical data will be furnished with any forthcoming solicitation. Following solicitation release, all responsible sources may submit a bid that shall be considered by the agency. This project and/or the anticipated solicitation may be changed, delayed, or canceled at any time. The anticipated solicitation and attachments will be posted in Portable Document Format (.pdf) which will require Adobe Acrobat Reader to open and view files. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader. All prospective Offerors must be registered in the PIEE system at least one (1) week prior to the anticipated bid due date. Registration is not required to download any forthcoming solicitation documents, plans, and/or specifications, but IS required to submit a bid. Copies of the solicitation and attachments will be made available for inspection without charge after the solicitation is released, when accessed through PIEE. Failure to register in PIEE will prevent submission of bids as the Government will not accept them by any other means. See linked PIEE registration instructions and web-based training for information about how to access the PIEE Solicitation Module and submit bids. All prospective Offerors must be registered in SAM before the anticipated solicitation closing date. Please see the SAM website for information about SAM registration requirements and approval timelines. USACE will not notify prospective Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice.

From Solicitation posted on Aug 22, 2025

26-Aug-2025: Issueing Amendment to formalize the soliciation extension reflected in SAM.gov. The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for to complete the removal of two (2) earth covered reinforced concrete modular Munitions Storage Magazines (MSMs) at Hill Air Force Base (HAFB), UT. These two existing buildings are numbered 1411 and 1432 and combined equal 4092 sf total. The construction type is reinforced concrete. There is a finish membrane waterproofing layer buried between the concrete structure and finish grade. The site shall be leveled out and graded to match the existing adjacent grades in a manner that will not cause excess stormwater runoff pooling. Areas left after demolition shall be fully restored to match existing adjacent grades and vegetation specified by the reseeding requirements for Hill AFB Included in the demolition are access roads, 6 thick asphalt pavement approach aprons, lightning protection, utilities, site improvements, communication support, and all other necessary support. Additional demolition will include, but is not limited to, the abatement/removal of asbestos containing materials (ACM) and other regulated materials (ORM), disconnect/capping of utilities, disposal of all debris materials, and restoration of the site to a specified condition. Following demolition, the Contractor shall be responsible for restoring the work site with respect to grading and proper drain The Government estimates the requirement can be constructed within three hundred and sixty-five (365) calendar days. If market conditions indicate this estimate may be unrealistic, respondents are encouraged to provide specific information (such as known equipment lead times or other timeline concerns) for Government consideration when responding to this Sources Sought Notice. The potential requirement may result in a firm-fixed-price solicitation issued approximately end of June 2025. If solicited, the Government intends to award the contemplated requirement as a fixed-price contract by approximately September 2025. The Government intends to solicit and award using lowest price technically acceptable source selection process, as outlined in Federal Acquisition Regulation (FAR) Part 15, Defense FAR Supplement (DFARS) Part 215, DFARS Procedures, Guidance, and Information (PGI) Part 215, Department of Defense (DoD) Source Selection Procedures (SSP) (dated 20 August 2022), Army FAR Supplement (AFARS) Part 5115, AFARS Appendix AA, Army Source Selection Supplement (AS3) (dated 28 November 2017), and USACE Acquisition Instructions (UAI) Subpart 5115.3. In accordance with Federal Acquisition Regulation (FAR) 36.204(e) the Government currently estimates the magnitude of construction for this project to be between $500,000.00 and $1,000,000.00. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 238910, Site Preparation Contractors. The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $19,000,000.00 annual revenue. The Product Service Code for the potential requirement is anticipated to be P400, Salvage- Demolition of Buildings. If there is a reasonable expectation that at least two (2) responsible small business concerns under this NAICS can provide the anticipated services at fair market prices, the Contracting Officer is required to set the acquisition aside for small business concerns. If competition is set-aside for small businesses, FAR 52.219-14, Limitations on Subcontracting, requires that general construction small business Contractors self-perform at least twenty-five percent (25%) of the cost of the contract, not including the cost of materials. If no set aside is made, the requirement is competed with full and open competition, and the awarded Contractor is not a small business, the Contractor will be required to perform the percent of work identified in the solicitation under FAR 52.236- 1, Performance of Work by the Contractor. The solicitation will be issued through the Procurement Integrated Enterprise Environment (PIEE - https://piee.eb.mil) and Governmentwide Point of Entry, the System for Award Management (SAM - www.SAM.gov) on or about mid-to-end-June 2025 with quotes tentatively due July 2025. Please DO NOT request an updated schedule if estimated dates are surpassed; the Government will release all information publicly through PIEE and SAM when updates are available. Requests for schedule updates may be ignored. Please DO NOT request a copy of the solicitation, or draft plans or specs, as they are not currently available. Any available technical data will be furnished with any forthcoming solicitation. Following solicitation release, all responsible sources may submit a bid that shall be considered by the agency. This project and/or the anticipated solicitation may be changed, delayed, or canceled at any time. The anticipated solicitation and attachments will be posted in Portable Document Format (.pdf) which will require Adobe Acrobat Reader to open and view files. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader. All prospective Offerors must be registered in the PIEE system at least one (1) week prior to the anticipated bid due date. Registration is not required to download any forthcoming solicitation documents, plans, and/or specifications, but IS required to submit a bid. Copies of the solicitation and attachments will be made available for inspection without charge after the solicitation is released, when accessed through PIEE. Failure to register in PIEE will prevent submission of bids as the Government will not accept them by any other means. See linked PIEE registration instructions and web-based training for information about how to access the PIEE Solicitation Module and submit bids. All prospective Offerors must be registered in SAM before the anticipated solicitation closing date. Please see the SAM website for information about SAM registration requirements and approval timelines. USACE will not notify prospective Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice.

From Solicitation posted on Aug 26, 2025

28-Aug-2026: Issuing Amendment to delete the PIEE requirements in the SAM.gov description that were not present in the solicitation. 26-Aug-2025: Issuing Amendment to formalize the soliciation extension reflected in SAM.gov. The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for to complete the removal of two (2) earth covered reinforced concrete modular Munitions Storage Magazines (MSMs) at Hill Air Force Base (HAFB), UT. These two existing buildings are numbered 1411 and 1432 and combined equal 4092 sf total. The construction type is reinforced concrete. There is a finish membrane waterproofing layer buried between the concrete structure and finish grade. The site shall be leveled out and graded to match the existing adjacent grades in a manner that will not cause excess stormwater runoff pooling. Areas left after demolition shall be fully restored to match existing adjacent grades and vegetation specified by the reseeding requirements for Hill AFB Included in the demolition are access roads, 6 thick asphalt pavement approach aprons, lightning protection, utilities, site improvements, communication support, and all other necessary support. Additional demolition will include, but is not limited to, the abatement/removal of asbestos containing materials (ACM) and other regulated materials (ORM), disconnect/capping of utilities, disposal of all debris materials, and restoration of the site to a specified condition. Following demolition, the Contractor shall be responsible for restoring the work site with respect to grading and proper drain The Government estimates the requirement can be constructed within three hundred and sixty-five (365) calendar days. If market conditions indicate this estimate may be unrealistic, respondents are encouraged to provide specific information (such as known equipment lead times or other timeline concerns) for Government consideration when responding to this Sources Sought Notice. The potential requirement may result in a firm-fixed-price solicitation issued approximately end of June 2025. If solicited, the Government intends to award the contemplated requirement as a fixed-price contract by approximately September 2025. The Government intends to solicit and award using lowest price technically acceptable source selection process, as outlined in Federal Acquisition Regulation (FAR) Part 15, Defense FAR Supplement (DFARS) Part 215, DFARS Procedures, Guidance, and Information (PGI) Part 215, Department of Defense (DoD) Source Selection Procedures (SSP) (dated 20 August 2022), Army FAR Supplement (AFARS) Part 5115, AFARS Appendix AA, Army Source Selection Supplement (AS3) (dated 28 November 2017), and USACE Acquisition Instructions (UAI) Subpart 5115.3. In accordance with Federal Acquisition Regulation (FAR) 36.204(e) the Government currently estimates the magnitude of construction for this project to be between $500,000.00 and $1,000,000.00. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 238910, Site Preparation Contractors. The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $19,000,000.00 annual revenue. The Product Service Code for the potential requirement is anticipated to be P400, Salvage- Demolition of Buildings. If there is a reasonable expectation that at least two (2) responsible small business concerns under this NAICS can provide the anticipated services at fair market prices, the Contracting Officer is required to set the acquisition aside for small business concerns. If competition is set-aside for small businesses, FAR 52.219-14, Limitations on Subcontracting, requires that general construction small business Contractors self-perform at least twenty-five percent (25%) of the cost of the contract, not including the cost of materials. If no set aside is made, the requirement is competed with full and open competition, and the awarded Contractor is not a small business, the Contractor will be required to perform the percent of work identified in the solicitation under FAR 52.236- 1, Performance of Work by the Contractor. All prospective Offerors must be registered in SAM before the anticipated solicitation closing date. Please see the SAM website for information about SAM registration requirements and approval timelines. USACE will not notify prospective Offerors of any changes to the solicitation; Offerors must monitor SAM for the solicitation to be posted, and for any posted changes or amendments. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice.

From Solicitation posted on Aug 28, 2025

29-Aug-2025: Clarifying document posted for information only. This document addresses recent questions regarding the offer due date and potential site visit. The offer due date remains as previously amended. 28-Aug-2025: Issuing Amendment to delete the PIEE requirements in the SAM.gov description that were not present in the solicitation. 26-Aug-2025: Issuing Amendment to formalize the soliciation extension reflected in SAM.gov. The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for to complete the removal of two (2) earth covered reinforced concrete modular Munitions Storage Magazines (MSMs) at Hill Air Force Base (HAFB), UT. These two existing buildings are numbered 1411 and 1432 and combined equal 4092 sf total. The construction type is reinforced concrete. There is a finish membrane waterproofing layer buried between the concrete structure and finish grade. The site shall be leveled out and graded to match the existing adjacent grades in a manner that will not cause excess stormwater runoff pooling. Areas left after demolition shall be fully restored to match existing adjacent grades and vegetation specified by the reseeding requirements for Hill AFB Included in the demolition are access roads, 6 thick asphalt pavement approach aprons, lightning protection, utilities, site improvements, communication support, and all other necessary support. Additional demolition will include, but is not limited to, the abatement/removal of asbestos containing materials (ACM) and other regulated materials (ORM), disconnect/capping of utilities, disposal of all debris materials, and restoration of the site to a specified condition. Following demolition, the Contractor shall be responsible for restoring the work site with respect to grading and proper drain The Government estimates the requirement can be constructed within three hundred and sixty-five (365) calendar days. If market conditions indicate this estimate may be unrealistic, respondents are encouraged to provide specific information (such as known equipment lead times or other timeline concerns) for Government consideration when responding to this Sources Sought Notice. The potential requirement may result in a firm-fixed-price solicitation issued approximately end of June 2025. If solicited, the Government intends to award the contemplated requirement as a fixed-price contract by approximately September 2025. The Government intends to solicit and award using lowest price technically acceptable source selection process, as outlined in Federal Acquisition Regulation (FAR) Part 15, Defense FAR Supplement (DFARS) Part 215, DFARS Procedures, Guidance, and Information (PGI) Part 215, Department of Defense (DoD) Source Selection Procedures (SSP) (dated 20 August 2022), Army FAR Supplement (AFARS) Part 5115, AFARS Appendix AA, Army Source Selection Supplement (AS3) (dated 28 November 2017), and USACE Acquisition Instructions (UAI) Subpart 5115.3. In accordance with Federal Acquisition Regulation (FAR) 36.204(e) the Government currently estimates the magnitude of construction for this project to be between $500,000.00 and $1,000,000.00. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 238910, Site Preparation Contractors. The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $19,000,000.00 annual revenue. The Product Service Code for the potential requirement is anticipated to be P400, Salvage- Demolition of Buildings. If there is a reasonable expectation that at least two (2) responsible small business concerns under this NAICS can provide the anticipated services at fair market prices, the Contracting Officer is required to set the acquisition aside for small business concerns. If competition is set-aside for small businesses, FAR 52.219-14, Limitations on Subcontracting, requires that general construction small business Contractors self-perform at least twenty-five percent (25%) of the cost of the contract, not including the cost of materials. If no set aside is made, the requirement is competed with full and open competition, and the awarded Contractor is not a small business, the Contractor will be required to perform the percent of work identified in the solicitation under FAR 52.236- 1, Performance of Work by the Contractor. All prospective Offerors must be registered in SAM before the anticipated solicitation closing date. Please see the SAM website for information about SAM registration requirements and approval timelines. USACE will not notify prospective Offerors of any changes to the solicitation; Offerors must monitor SAM for the solicitation to be posted, and for any posted changes or amendments. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice.

From Solicitation posted on Aug 29, 2025

Notice history

5
  1. Presolicitation Posted Aug 12, 2025 View
  2. Solicitation Posted Aug 22, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Aug 26, 2025Aug 28, 2025
  3. Solicitation Posted Aug 26, 2025
    • Description: Description was updated
  4. Solicitation Posted Aug 28, 2025
    • Description: Description was updated
    • Response Deadline: Aug 28, 2025Sep 02, 2025
  5. Solicitation LATEST Posted Aug 29, 2025
    • Description: Description was updated

Details

Solicitation number W9123825QA030
Notice ID 77446b755a2b41209a3ba0b5eb9265d3
Notice type Solicitation
Product / Service (PSC) P400
NAICS 238910
Place of performance Hill Air Force Base, Utah
Archive date Sep 17, 2025

Award Information

Not yet awarded

Contacts

primary
Jennifer Ferrer

Email

secondary
Daniel E. Czech

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTH PACIFIC
W075 ENDIST SACRAMENTO

Place of Performance

Hill Air Force Base, Utah 84056
USA

Dates

Posted Aug 29, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 02, 2025 11 months ago