Contacts, documents and full notice history are available with a subscription.
Special Notice NONE Expired 1 notice

HI STP 360 Hana Highway Bridges 6982AF-26-SN-00002

Solicitation 6982AF-26-SN-00002 Copied Notice ID bcf9f0cbe59f4d77b24b7a1afd34fe70 Copied TRANSPORTATION, DEPARTMENT OF — 6982AF CENTRAL FEDERAL LANDS DIVISI
SAM.gov
Posted
Feb 20, 2026
Deadline
Mar 04, 2026
Set-aside
NONE
NAICS
237310
PSC
Y1LB

Summary

AI-generated · Feb 21, 2026

Six existing bridges on Hana Highway (Maui, Hawaii) will be replaced to modernize the corridor while preserving historic character. The project widens the roadway to 16-ft curb-to-curb, meets HL-93 loading, current seismic criteria, and MASH TL-2 crash-tested railings, with Bridge 19 Kopiliula on a new alignment and the other five staying on the existing alignment. Spans range from 23 to 85 feet (five single-span, one two-span); abutments will be constructed behind existing cement rubble masonry while protecting CRM in place. Access and material delivery present challenges, and numerous night and multi-day roadway closures plus a strong public outreach program are expected during construction. The work includes heavy earth moving, structural excavation and backfill, concrete and asphalt pavement, drainage, precast concrete slabs, steel reinforcement, bridge railing, micropiles and related testing, stone masonry elements, topsoil placement, and traffic control.

The project is being procured as a Best Value, tradeoff construction contract with a target construction window in the late 2020s and an estimated total cost of $35–$45 million. A special information request seeks input on the use of a Project Labor Agreement (PLA) under the Revolutionary FAR Overhaul Part 22, including estimated bid impact (percent), whether the project would be limited to a small pool of contractors or subcontractors, and any other PLA considerations specific to this project. Submissions are requested in electronic format.

This is a Special Notice and is for information purposes only regarding project HI STP 360 Hana Highway Bridges project, Sources Sought Notice 6982AF-26-SS-000001. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS. NO SOLICITATION IS CURRENTLY AVAILABLE. The purpose of this announcement is to determine the following: Will your firm bid this project if it uses a Project Labor Agreement in accordance with Revolutionary FAR Overhaul Part 22? If so, how much will your bid increase in terms of percent (estimated) due to the use of a Project Labor Agreement? Do you believe the project can only be completed by a limited pool of contractors or subcontractors? Please explain in detail. Is there any other information you would like the government to consider regarding a Project Labor Agreement for this specific construction project? SUBMITTAL INFORMATION: SUBMITTALS SHOULD BE MADE IN ELECTRONIC FORMAT ISSUE DATE: February 20, 2026 DUE DATE FOR RESPONSES: March 4, 2026, 4:00 PM MST SUBMIT RESPONSES TO: Stephanie Navarro at cflacquisitions@dot.gov HI STP 360 Hana Highway Bridges This project will provide improvements to 6 of the 59 existing bridges along State Route 360, also referred to as Hana Highway, between mile markers 6.0 and 28.4. This project is located along the northeast coast of the island of Maui in the State of Hawaii. The purpose of the project is to improve the existing bridges to 16-ft curb-to-curb minimum widths, meet HL-93 loading capacities, meet current seismic criteria, and meet MASH TL-2 crash-tested railings while maintaining historic and rural character of the bridges and existing roadway alignment. The existing six bridges to be improved are: Bridge #2 Kailua Stream, Bridge #5 Makanali Stream, Bridge #8 Puohokamoa Stream, Bridge #19 Kopiliula Stream, Bridge #39 Ula ino Stream and Bridge #40 Mokulehua Stream. Bridge #19 Kopiliula Stream will be built on a new alignment while the other five bridges will be kept on the existing alignment of Hana Highway. SCOPE OF THE WORK: The scope of this project includes replacement of 6 existing bridges along Hana Highway. The proposed bridges range in length from 23 feet to 85 feet. Five of the proposed bridges will be single span bridges with one bridge being a two-span bridge. Proposed abutments will be constructed behind existing cement rubble masonry (CRM) abutments while protecting existing CRM in place. Location of the bridges along Hana Highway will present accessibility and materials and equipment delivery challenges. It is anticipated that numerous night closures and multi-day closures of Hana Highway will be required to construct proposed improvements. Public outreach during construction will be paramount to keep the residents and the traveling public updated about construction activities and roadway closures. PRINCIPAL WORK ITEMS: Approximate quantities of principal work items include: 200 cubic yards of Removal of Stone Masonry 1,800 cubic yards of Roadway Excavation 1,620 cubic yards of Structure Excavation 1,100 cubic yards of Structural Backfill 1,140 ton of Roadway Aggregate, Method 2 1,170 ton of Asphalt Concrete Pavement, Type 1 1,75 cubic yards of Structural Concrete, Class A 15 Precast, Prestressed Concrete Slabs 250,100 pounds of Reinforced Steel 655 linear feet of Bridge Railing, Concrete 7,510 linear feet of Micropiles 15 Micropile Load Verification Tests 230 square yards of Stone Masonry 520 linear feet of Stone Masonry Guardwall 155 linear feet of the Stone Masonry Anchor Slab Guardwall 10,000 square yards of Placing Conserved Topsoil 4-inch Depth Removal of Bridge Superstructure Temporary Traffic Control Temporary Traffic Control, Public Information Program The Federal Highway Administration (FHWA), Central Federal Lands Highway Division (CFLHD), anticipates awarding a Best Value- Tradeoff Approach construction contract in July 2026. The contract is anticipated to be under construction between August 2026 and November 2029. The cost of the entire project is estimated to be between $35,000,000 and $45,000,000.

From Special Notice posted on Feb 20, 2026

Notice history

1
  1. Special Notice LATEST Posted Feb 20, 2026 View

Details

Solicitation number 6982AF-26-SN-00002
Notice ID bcf9f0cbe59f4d77b24b7a1afd34fe70
Notice type Special Notice
Product / Service (PSC) Y1LB
NAICS 237310
Set-aside No Set aside used
Place of performance Hana, Hawaii
Archive date Mar 19, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Stephanie Navarro

Email

secondary
Leslie Karsten

Email

Agency

TRANSPORTATION, DEPARTMENT OF
FEDERAL HIGHWAY ADMINISTRATION
6982AF CENTRAL FEDERAL LANDS DIVISI

Place of Performance

Hana, Hawaii 96713
USA

Dates

Posted Feb 20, 2026 5 months ago
Last Updated Aug 06, 2026 1 day ago
Due Mar 04, 2026 5 months ago