Contacts, documents and full notice history are available with a subscription.
Award Notice SBA 3 notices 5 documents

Heber Ranger District HVAC 1240LS25Q0066

Solicitation 1240LS25Q0066 Copied Notice ID 91875012df69489483f6075283e09370 Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA INTERMOUNTAIN 7
SAM.gov
Posted
Jan 12, 2026
Deadline
Feb 12, 2026
Set-aside
SBA
NAICS
238220
PSC
Z2AZ

Summary

AI-generated · Jan 13, 2026

Replace the entire HVAC system for the Heber Ranger District Office. Remove and replace all current cooling and heating equipment, including three outdoor AC units (one Payne single-phase and two Lennox three-phase units), two basement furnaces, and one attic fan coil. The existing units are about 33 years old and use R22 refrigerant; dampers are nonfunctional and heat exchangers fail. To address long lead times and efficiency, replace with single-phase units where practical and upgrade to refrigerants of the 454B class. Start-up, testing and balancing, owner training, and warranty are included.

Work will occur with the building remaining open to the public and forest service personnel; the contractor must limit access to the work areas and use the existing electrical service for construction only, turning off lights and power when not needed. Water service is available on site, and toilet facilities are on site (verify which toilets with the COR). Construction hours are 7:00 a.m.–7:00 p.m., Monday through Saturday. The contractor must hold HVAC licenses and ensure all installations meet federal energy efficiency and indoor air quality standards. This is a small business set-aside, and a site visit will be offered to prospective bidders (details in the solicitation).

The Heber District Office HVAC system has failed and requires replacement of all AC units and furnaces to have the system operational again. The current system consists of: Three (3) outdoor AC Units Payne Model #PA13NR060-J (Single Phase) Lennox Model #HS29-036-13Y (Three Phase) Lennox Model #HS24-413-1Y (Three Phase) Two (2) Basement Furnace Units Lennox Model #G20RQ3E-75-6 (Single Phase) Lennox Model #C16-41W-1FF (Single Phase) One (1) Attic Fan Coil Lennox Model #CH19-65-2 (Single Phase) The life expectancy of the AC units is approximately 15-20 years old, and these ones are now 33 years old. They also use a refrigerant (R22) that is 2 generations old. The furnaces are old heat exchangers that constantly fail. The dampers on the furnaces are no longer functional. Due to long lead times and the need for an efficient replacement of this system, we are recommending replacing the two (2) three phase AC units with single phase units. All other units should be replaced with single phase units as well. We also recommend updating the AC units to units that use the new 454B refrigerant. The site will not be closed to the public or forest service personnel during implementation. The contractor shall be responsible for signing and limiting public and forest service access to the portions of the building where the work is being completed. There is an electrical service existing for the site. Contractor shall have permission to use existing electrical services during construction. Contractor shall be aware of the use of electrical services and shall limit the use of electrical services to the construction alone. Contractor is responsible for turning off all lights and power so as not to waste electrical services. Contractor shall provide connections and extensions of services as required for construction operations. There is water service on site. Contractor shall provide connections and extensions of services as required for construction operations. Toilet facilities are on site. Contractor and workers shall have access to toilet facilities during construction. Verify with COR which toilets will be available. Construction Hours Hours of operation for the construction, demolition, and subsequent cleanup shall be only between the hours between 7:00 a.m. and 7:00 p.m. Monday through Saturday. Contractor shall hold all necessary HVAC contractor licenses. Contractor shall ensure all systems that are to be installed meet the energy efficiency requirements and indoor air quality standards as governed by the Federal Government. Start up, testing and balancing, checkout, owner training, and warranty shall be included in the project. This is a total Small Business Set Aside A Site visit for prospective contractors will be held on February 3, 2026 at 2:00 PM (Mountain Time) at the Heber Ranger District Office, 2460 South Hwy 40, Heber, UT 84032.

From Combined Synopsis/Solicitation posted on Jan 12, 2026

Amendment 1- The purpose of this Amendment is to: 1-Post Site Visit Questions/Answers/Photos and list of attendees 2- Extend Closing date to Thursday, February 19, 2026 at 1:00 PM local time (Mountain Time). The Heber District Office HVAC system has failed and requires replacement of all AC units and furnaces to have the system operational again. The current system consists of: Three (3) outdoor AC Units Payne Model #PA13NR060-J (Single Phase) Lennox Model #HS29-036-13Y (Three Phase) Lennox Model #HS24-413-1Y (Three Phase) Two (2) Basement Furnace Units Lennox Model #G20RQ3E-75-6 (Single Phase) Lennox Model #C16-41W-1FF (Single Phase) One (1) Attic Fan Coil Lennox Model #CH19-65-2 (Single Phase) The life expectancy of the AC units is approximately 15-20 years old, and these ones are now 33 years old. They also use a refrigerant (R22) that is 2 generations old. The furnaces are old heat exchangers that constantly fail. The dampers on the furnaces are no longer functional. Due to long lead times and the need for an efficient replacement of this system, we are recommending replacing the two (2) three phase AC units with single phase units. All other units should be replaced with single phase units as well. We also recommend updating the AC units to units that use the new 454B refrigerant. The site will not be closed to the public or forest service personnel during implementation. The contractor shall be responsible for signing and limiting public and forest service access to the portions of the building where the work is being completed. There is an electrical service existing for the site. Contractor shall have permission to use existing electrical services during construction. Contractor shall be aware of the use of electrical services and shall limit the use of electrical services to the construction alone. Contractor is responsible for turning off all lights and power so as not to waste electrical services. Contractor shall provide connections and extensions of services as required for construction operations. There is water service on site. Contractor shall provide connections and extensions of services as required for construction operations. Toilet facilities are on site. Contractor and workers shall have access to toilet facilities during construction. Verify with COR which toilets will be available. Construction Hours Hours of operation for the construction, demolition, and subsequent cleanup shall be only between the hours between 7:00 a.m. and 7:00 p.m. Monday through Saturday. Contractor shall hold all necessary HVAC contractor licenses. Contractor shall ensure all systems that are to be installed meet the energy efficiency requirements and indoor air quality standards as governed by the Federal Government. Start up, testing and balancing, checkout, owner training, and warranty shall be included in the project. This is a total Small Business Set Aside A Site visit for prospective contractors will be held on February 3, 2026 at 2:00 PM (Mountain Time) at the Heber Ranger District Office, 2460 South Hwy 40, Heber, UT 84032.

From Combined Synopsis/Solicitation posted on Feb 10, 2026

Notice history

3
  1. Combined Synopsis/Solicitation Posted Jan 12, 2026
  2. Combined Synopsis/Solicitation Posted Feb 10, 2026
    • Description: Description was updated
    • Response Deadline: Feb 12, 2026Feb 19, 2026
  3. Award Notice LATEST Posted Mar 26, 2026

Details

Solicitation number 1240LS25Q0066
Notice ID 91875012df69489483f6075283e09370
Award number 1240LS26P0016
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) Z2AZ
NAICS 238220
Place of performance Utah
Archive date Feb 27, 2026

Award Information

Awardee
1
Total Awarded
$30,974.00
Award Date
Mar 26, 2026

Awardees

Company Name UEI CAGE Code Location
ABSOLUTE COMFORT HEATING AND AIR CONDITIONING, LLC G94ZXX8ECAN3 197R3 Ogden, UT

Contacts

primary
Chris Hansen

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA INTERMOUNTAIN 7

Place of Performance

Utah 84032
USA

Dates

Posted Jan 12, 2026 6 months ago
Last Updated Aug 06, 2026 1 day ago
Due Feb 12, 2026 5 months ago