Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation NONE Expired 1 notice 8 documents

Hazardous Waste Collection and Disposal Services RFP25-049R

Solicitation RFP25-049R Copied Notice ID 57c8948c96e742a3b982bad2c9d3e439 Copied ENERGY, DEPARTMENT OF — PRINCETON LAB - DOE CONTRACTOR
SAM.gov
Posted
Sep 03, 2025
Deadline
Oct 08, 2025
Set-aside
NONE
NAICS
562211
PSC
F108

Summary

AI-generated · Sep 06, 2025

A Hazardous Waste Subcontractor is needed to manage, transport, and dispose of hazardous waste at RCRA-permitted treatment, storage, and disposal facilities, with waste moved to PPPL-approved TSDFs on an as-needed basis. The number of transport units and quantities will vary with PPPL’s needs, and the contract may include emergency and routine spill cleanup, vacuum truck clean-out, waste sampling, and related duties. The subcontractor may also be asked to perform all waste-management activities on site, including collection, intra-site transportation, characterization, storage, packaging, and arranging for disposal, with on-site work varying by PPPL requirements.

A mandatory pre-proposal meeting will be held. Offerors should review the prequalification information in Section III, and if qualified and able to submit a competitive proposal, complete and submit the RFP acknowledgment form included in the attachments.

The United States (US) Department of Energy (DOE) s Princeton Plasma Physics Laboratory (PPPL) requires the service of a Hazardous Waste Subcontractor for the management, transportation, and disposal of hazardous waste at RCRA-permitted treatment, storage, and disposal facilities (TSDFs). Waste materials are to be transported and disposed of at PPPL pre-approved TSDFs on an as-needed basis. The number of transportation units, and quantities of waste transported and disposed will vary depending upon the needs of PPPL. PPPL may require the services of the Hazardous Waste Subcontractor to perform emergency and routine spill cleanup, vacuum truck clean-out services, sampling of wastes, and other duties as required by PPPL. In addition, the Hazardous Waste Subcontractor may be called upon in the future to perform all waste management activities on site to include collection, intra-site transportation, characterization, storage, packaging, and arrange for transportation and disposal of hazardous waste. On site work activities will also vary depending upon the needs of PPPL. A mandatory pre-proposal meeting has been scheduled for 1:30 PM on 15 Sep 2025. Offerors are strongly encouraged to review the prequalification information referenced in Section III of the solicitation. If, after reviewing the proposal preparation instructions you are convinced that you can qualify and submit a competitive proposal, please complete and submit the RFP acknowledgment form listed in the RFP attachments

From Combined Synopsis/Solicitation posted on Sep 03, 2025

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Sep 03, 2025

Details

Solicitation number RFP25-049R
Notice ID 57c8948c96e742a3b982bad2c9d3e439
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) F108
NAICS 562211
Set-aside No Set aside used
Place of performance Princeton, New Jersey
Archive date Nov 08, 2025

Award Information

Not yet awarded

Contacts

primary
Jimmy Russell

Email

Phone

Agency

ENERGY, DEPARTMENT OF
ENERGY, DEPARTMENT OF
PRINCETON LAB - DOE CONTRACTOR

Place of Performance

Princeton, New Jersey 08543
USA

Dates

Posted Sep 03, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Oct 08, 2025 9 months ago