Hatch Stagefield Air Traffic Control Tower Equipment Movement W9124G-26-R-A007
Summary
AI-generated · May 27, 2026De-install the Air Traffic Control equipment from the existing Hatch Stagefield ATCT at Fort Rucker, Alabama, and reinstall it into the newly constructed Hatch Stagefield ATCT per the building design. The work includes all required cabling and grounding; installations must comply with FAA-STD-019e and MIL-STD-188-124(B).
Provide all personnel and supervision necessary to perform the non-personal services under a firm-fixed-price contract.
This non personal services requirement is being competed as a Firm Fixed Price 100% Total Small Business set aside, under NAICS 238210 and PSC N059. The contractor shall provide all personnel and supervision required to perform the de-installation of Air Traffic Control (ATC) equipment in the existing Air Traffic Control Tower (ATCT) at Hatch Stagefield, Fort Rucker, Alabama and the installation of the ATC equipment into newly constructed ATCT as per building design. Installation shall include all required cabling and grounding as specified in the appropriate regulations and standards FAA-STD-019e and MIL-STD-188-124(B).
From Combined Synopsis/Solicitation posted on May 26, 2026Notice history
1-
Combined Synopsis/Solicitation LATEST Posted May 26, 2026
Details
Award Information
Not yet awarded
Documents
8Contacts
Phone
Phone
Agency
Place of Performance
USA