Hatch ATC Equipment Movement W9124G-26-R-ATCT
Summary
AI-generated · Mar 26, 2026De-installation, engineering, relocation, and reinstallation of Air Traffic Control (ATC) equipment from the current Air Traffic Control Tower (ATCT) to the newly constructed ATCT at Hatch Stage Field, Fort Rucker, AL, with all personnel and supervision required to perform the work.
The goal is to enable Soldiers and Civilians in the 1-11th Aviation Regiment to control air traffic from the new towers, requiring the moved equipment to be installed in working condition. Additional details are provided in attachments.
The Mission Installation Contracting Command-Fort Eustis Detachment Rucker has a requirement from the 1-11th Aviation Regiment to provide all personnel and supervision required to perform the de-installation, engineering, relocation, and reinstallation of Air Traffic Control (ATC) equipment from the current Air Traffic Control Tower (ATCT) to the newly constructed ATCT located at Hatch Stage Field at Fort Rucker, AL. In order for the Soldiers and Civilians in 1-11th Aviation Regiment to control air traffic from these new towers, ATC equipment must be moved from the old tower and installed in the new one in working condition. Please see attachments for additional details.
From Sources Sought posted on Mar 25, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA