H245--Vancouver Boiler Emission Compliance 36C26025Q0716
Summary
AI-generated · Aug 24, 2025Conduct a boiler emission test on three boilers in Building 3 at the Vancouver Campus to verify compliance with permit 19-3332 (SWCAA) and 40 CFR 60. Perform three runs of Volumetric Flow Rate (EPA M1/M2), three runs of O2, CO2, NOx, and CO (EPA M3A, 7E, 10), three runs of Water Vapor (EPA M4), and TC calibration (EPA ALT-011). This five-year interval testing is required to maintain operation of the Vancouver boilers, which supply steam for laundry, sterile processing, space heating/hot water, and hot water to five buildings.
The notice set includes a presolicitation and a solicitation with essentially the same scope; additional records labeled “SOLICITATION DESCRIPTION” contain no further detail. Award information shown is $0.00 for all awards, indicating no awards have been issued yet. No brand-name requirements, site-visit details, or other unique conditions are provided beyond the EPA/SWCAA-emission testing requirements.
Statement of Work Boiler Emission Compliance, VA Portland HCS Vancouver Campus Perform a boiler emission test on 3 boilers in Building 3, VA Portland HCS Vancouver Campus Test to determine compliance with permit 19-3332 issued by Southwest Clean Air Agency (SWCAA) and 40 CFR 60. Perform three runs of Volumetric Flow Rate test per Environmental Protection Agency (EPA) M1 and M2. Perform three runs of O2, CO2, NOx, and CO test per EPA M3A, 7E and 10 Perform three runs of Water Vapor test per EPA M4 Perform TC Calibration per EPA ALT-011 This test is required every 5 years by SWCAA to maintain the permit for operation on the Vancouver boilers. The Vancouver boilers provide steam to maintain laundry operations, sterile processing, heating hot water and hot water to 5 buildings.
From Presolicitation posted on Jul 23, 2025Statement of Work Boiler Emission Compliance, VA Portland HCS Vancouver Campus Perform a boiler emission test on 3 boilers in Building 3, VA Portland HCS Vancouver Campus Test to determine compliance with permit 19-3332 issued by Southwest Clean Air Agency (SWCAA) and 40 CFR 60. Perform three runs of Volumetric Flow Rate test per Environmental Protection Agency (EPA) M1 and M2. Perform three runs of O2, CO2, NOx, and CO test per EPA M3A, 7E and 10 Perform three runs of Water Vapor test per EPA M4 Perform TC Calibration per EPA ALT-011 This test is required every 5 years by SWCAA to maintain the permit for operation on the Vancouver boilers. The Vancouver boilers provide steam to maintain laundry operations, sterile processing, heating hot water and hot water to 5 buildings.
From Solicitation posted on Jul 23, 2025SOLICITATION DESCRIPTION
From Solicitation posted on Jul 31, 2025SOLICITATION DESCRIPTION
From Solicitation posted on Aug 05, 2025This requirement involves the testing of boiler emissions for the Portland VAMC.
From Award Notice posted on Sep 05, 2025Notice history
5-
Presolicitation Posted Jul 23, 2025
-
Solicitation Posted Jul 31, 2025View changes (2)
- Description: Description was updated
- Set-Aside: Service-Disabled Veteran-Owned Small Business Set Aside → None
-
Solicitation Posted Aug 05, 2025No changes from previous notice
-
Award Notice LATEST Posted Sep 05, 2025
Details
Award Information
Award Notices
Posted: Sep 05, 2025
This requirement involves the testing of boiler emissions for the Portland VAMC.
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| STERILECO LLC | N/A | N/A | Indianapolis, IN |
Contacts
Contract Specialist
Agency
Place of Performance
Portland, OR 97239-2964