H-27 Water Pump (Remove/Replace) FA462525Q1042
Summary
AI-generated · Sep 10, 2025Remove the defective H-27 water pump ( BURKS ED10M Regen Pump Bronze with cast iron construction, 2-1/2" NPT inlet, 2" NPT outlet) and its BALDOR EM2513T 15HP motor (1800 RPM, 254T frame, 3-phase, 60 Hz, 230/460V) and replace them with a pump and motor of equal or greater capability. Complete the work and delivery within 30 days after order, at Whiteman AFB, MO.
Submit a responsive quote that includes the proposed equipment/services, confirmation of required certifications listed in the Performance Work Statement, and details of the replacement pump (specifications and images). Include your company name, address, primary contact, and CAGE/UEI. Required attachments include the PWS, price schedule, and wage provisions; note that SCA wage determinations apply and HUBZone price evaluation preferences will be used. Questions should be submitted by email to the two designated points of contact with the subject line referencing the project title.
This is an official Request for Quote (RFQ) Notice (FA254325Q1042). The U.S. Air Force 509th Contracting Squadron at Whiteman AFB, MO is posting this Request for Quote (RFQ) to find potential vendors to provide a service for Removal/replacement of an H-27 Water Pump that meets the requirements specified of the attached Performance Work Statement (PWS). DESCRIPTION OF REQUIREMENT: The Contractor will remove the defective pump (BURKS ED10M Regen Pump Bronze fitted, cast iron construction, 2-1/2" NPT inlet, 2" NPT outlet) and motor (BALDOR Motor EM2513T 15HP, 1800 RPM, 254T Frame, 3ph, 60HZ, 230/460V) and replace with a pump and motor of equal or greater capabilities. DELIVERABLES: The contractor shall complete performance no more than 30 days after receipt of the order. Service will be performed at Whiteman AFB, MO 65305. RESPONSES: Questions are due to both the Contracting Officer: Brittainy Shirley, at brittainy.shirley@us.af.mil and the Contract Specialist: Emori Laqai, at emori.laqai.fj@us.af.mil NLT 4:00 PM CDT, Wednesday, 10 September 2025. Questions received after that time may not be answered. To ensure all questions and responses are received, questions and responses must include the RFQ Number (FA254325Q1042) and title (Remove/replace H-27 Water Pump) in the subject line of the email submission and are to be sent via email to both the Contracting Officer: Brittainy Shirley at brittainy.shirley@spaceforce.mil and the Contract Specialist: Emori Laqai, at emori.laqai.fj@us.af.mil NLT 2:00 PM CDT, Friday, 12 September 2025. SUBMISSION DETAILS: To be considered responsive, you must also include the following: - Must include a quote for equipment/services provided - Must Include confirmation of required certification as listed in the PWS - Must Include Details of what you intend to replace the current pump with, including any necessary specs/images - Must include the following information in your response: - Company name, address, and point of contact, with email address and phone number - CAGE Code and/or UEI number Attachments: 1. PWS - MXS Remove and Replace H-27 Water Pump 3 June 2025 2. Price Schedule 3. Clauses 4. SCA Wage Determination Provisions and clauses, in their latest editions, will apply to this acquisition. FAR 19.1307 Price evaluation preference for HUBZone small business concerns applies to this solicitation.
From Solicitation posted on Sep 09, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA