Grand Prairie Pump Station Inlet Channel W912EQ25RA004
Summary
AI-generated · Aug 23, 2025Award of a sole-source contract to Ozark Dumey JV, LLC for completing the inlet channel serving the Grand Prairie Pump Station from the White River to enable delivery of water to landowners. The inlet channel runs about 1,825 feet long with a 104-foot bottom width, and the work includes excavation to establish channel grade and cross-section, removal and placement of spoil, and erosion-control measures. Remaining excavation depths are expected to be 5–15 feet and may be influenced by river stages.
Period of performance is 230 days from notice to proceed, with a firm-fixed-price contract. The estimated value is between $1 million and $5 million. This is a sole-source action under the 8(a) program and is not open to competitive proposals. Interested firms should identify their interest and provide documentation demonstrating capability to meet the requirements.
Notice of Intent to Award a Sole Source Contract to Ozark Dumey JV, LLC. Notice of Intent to Award an 8(a) Sole Source Procurement to Ozark Dumey JV, LLC.This is a notice of intent of the U.S. Army Corps of Engineers, Memphis District, Contracting Branch to negotiate a sole source award with Ozark Dumey JV, LLC., 3067 South Westwood Blvd., Poplar Bluff, Missouri, 63901.This contract action was accomplished using other than competitive procedures, because a statute exists that expressly authorizes or requires that this acquisition be made from a specific source or through another agency; specifically, FAR 6.302-5(b)(4) for sole source awards under the 8(a) program 15 U.S.C.637(a) and in accordance with 13 CFR 124.1-1(c) and FAR 19.8. The work consists of completing the inlet channel serving the pump station from the White River, which will allow for delivery of water to landowners. The inlet channel is approximately 1,825 long with a 104-foot bottom width. The project will consist of (but not be limited to) excavation to establish channel grade and section, removal and placement of spoil, pertinent erosion control measures, etc. Remaining excavation depths necessary for the inlet channel are 5 -15 . Excavation activities may be dictated by river stages.3. The intended period of performance is 230 days from time of notice to proceed. The proposed action will result in a firm-fixed price contract.The North American Industrial Classification System (NAICS) Code is 237110 (Water and Sewer Line and Related Structures Construction), with a Small Business size standard of $45M. The estimated value of this project is between $1M and $5M. This Notice of Intent is posted for informational purposes only and is not a request for competitive proposals. Interested firms must identify their interest and provide documentation demonstrating their capability (include detailed technical information and other technical literature) demonstrating ability to meet the above requirements, by emailing Ozark Dumey JV, LLC. point of contact Leo Acevedo at leo@ozarkconstructors.com. A determination by the Government not to compete this requirement is solely within the discretion of the Government. No requests for capability briefings will be honored as a result of this notice.
From Special Notice posted on Jun 26, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA