GMF Rochester Ranger District Office Fleet Garage 12445526Q0035
Summary
AI-generated · Mar 09, 2026Provide and install a pre-engineered building on Green Mountain National Forest in Rochester, VT, with exterior finishes matched to the existing Rochester Workshop. Refer to project plans for style and configuration. The structure must be supported by foundations below frost depth and designed by the contractor or the building manufacturer. It shall include a concrete slab floor, power, lighting, site work, and other miscellaneous items as shown on the project plans.
The USDA, Forest Service has a requirement on the Green Mountain National Forest in Rochester, VT, to provide and install a pre-engineered building with exterior to match appearance with existing Rochester Workshop. See Project Plans for style and configuration. Structure shall be supported by foundations below frost depth and design by the Contractor or building manufacturer. Building shall have a concrete slab floor, power, lighting, site work, and other miscellaneous items as shown on the project plans.
From Solicitation posted on Mar 05, 2026March 30, 2026: This amendment add a Q&A document. The USDA, Forest Service has a requirement on the Green Mountain National Forest in Rochester, VT, to provide and install a pre-engineered building with exterior to match appearance with existing Rochester Workshop. See Project Plans for style and configuration. Structure shall be supported by foundations below frost depth and design by the Contractor or building manufacturer. Building shall have a concrete slab floor, power, lighting, site work, and other miscellaneous items as shown on the project plans.
From Solicitation posted on Mar 20, 2026March 23, 2026- The estmated magnatude of this project is between $500,000 and $1,000,000. March 30, 2026: This amendment add a Q&A document. The USDA, Forest Service has a requirement on the Green Mountain National Forest in Rochester, VT, to provide and install a pre-engineered building with exterior to match appearance with existing Rochester Workshop. See Project Plans for style and configuration. Structure shall be supported by foundations below frost depth and design by the Contractor or building manufacturer. Building shall have a concrete slab floor, power, lighting, site work, and other miscellaneous items as shown on the project plans.
From Solicitation posted on Mar 23, 2026March 24, 2026 - Add a revised Q&A document. March 23, 2026- The estimated magnatude of this project is between $500,000 and $1,000,000. March 30, 2026: This amendment add a Q&A document. The USDA, Forest Service has a requirement on the Green Mountain National Forest in Rochester, VT, to provide and install a pre-engineered building with exterior to match appearance with existing Rochester Workshop. See Project Plans for style and configuration. Structure shall be supported by foundations below frost depth and design by the Contractor or building manufacturer. Building shall have a concrete slab floor, power, lighting, site work, and other miscellaneous items as shown on the project plans.
From Solicitation posted on Mar 24, 2026March 31, 2026 - Add a revised Q&A document. March 24, 2026 - Add a revised Q&A document. March 23, 2026- The estimated magnatude of this project is between $500,000 and $1,000,000. March 30, 2026: This amendment add a Q&A document. The USDA, Forest Service has a requirement on the Green Mountain National Forest in Rochester, VT, to provide and install a pre-engineered building with exterior to match appearance with existing Rochester Workshop. See Project Plans for style and configuration. Structure shall be supported by foundations below frost depth and design by the Contractor or building manufacturer. Building shall have a concrete slab floor, power, lighting, site work, and other miscellaneous items as shown on the project plans.
From Solicitation posted on Mar 31, 2026April 1, 2026 - Extend the closing date until April 13, 2026. March 31, 2026 - Add a revised Q&A document. March 24, 2026 - Add a revised Q&A document. March 23, 2026- The estimated magnatude of this project is between $500,000 and $1,000,000. March 30, 2026: This amendment add a Q&A document. The USDA, Forest Service has a requirement on the Green Mountain National Forest in Rochester, VT, to provide and install a pre-engineered building with exterior to match appearance with existing Rochester Workshop. See Project Plans for style and configuration. Structure shall be supported by foundations below frost depth and design by the Contractor or building manufacturer. Building shall have a concrete slab floor, power, lighting, site work, and other miscellaneous items as shown on the project plans.
From Solicitation posted on Apr 01, 2026Notice history
6-
Solicitation Posted Mar 05, 2026
-
Solicitation LATEST Posted Apr 01, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Apr 03, 2026 → Apr 13, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA