GLEN 22-1016 – Chiller System Integration FA255026TY0001
Summary
AI-generated · Jan 17, 2026Turnkey system integration for the Chiller Replacement project requires replacing two existing chillers with two government-specified Trane CenTraVac water-cooled centrifugal chillers in a mission-critical central utility plant. The scope includes project management for all phases, demolition and removal of the existing chillers and associated pumps, structural, mechanical, and electrical modifications to accommodate the new equipment, procurement, delivery, installation, and commissioning of the two chillers, and integration of the new chiller controls with the campus-wide Building Automation System (BAS).
This is a Sources Sought for market research to identify potential sources, including small businesses, capable of performing this work as a prime contractor. Interested parties should demonstrate technical capability and relevant experience in large-scale mechanical projects, and the ability to manage the procurement and installation of OEM-specified equipment.
The United States Space Force, 50th Contracting Squadron (50 CONS), at Schriever Space Force Base, CO is conducting market research to identify potential sources capable of performing a turnkey system integration for the Chiller Replacement project. The project requires the complete replacement of two existing chillers with two new, Government-specified Trane CenTraVac water-cooled centrifugal chillers within a mission-critical central utility plant. Please see attached for any additional details. The scope of work includes, but is not limited to: Project management for all phases of the project. Demolition and removal of two existing chillers and associated pumps. Structural, mechanical, and electrical modifications required to accommodate the new equipment. Procurement, delivery, installation, and commissioning of the two new Trane chillers. Integration of the new chiller controls with the existing campus-wide Building Automation System (BAS). This is a Sources Sought notice for market research purposes only and is not a solicitation for proposals. The purpose is to identify potential sources, including small businesses, capable of performing this work as a prime contractor. Interested parties should demonstrate their technical capability, relevant experience in large-scale mechanical projects, and ability to manage the procurement and installation of OEM-specified equipment.
From Sources Sought posted on Jan 16, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA