AI-generated · Feb 27, 2026Replace a failing concrete plank boat ramp with a concrete boat ramp panel system. The work includes removing and resetting a 60 ft by 8 ft floating dock, installing about 150 ft of erosion-control silt curtain, sawcutting pavement, removing roughly 3 cubic yards of asphalt concrete, removing the existing 30 ft by 12 ft concrete plank ramp, and preparing the site with 45 cubic yards of embankment grading.
Additionally, place 100 square yards of geotextile Type II, place and compact a 6-inch aggregate base, use 15 cubic yards of government-source material, erect and install a panel steel rail system, place nine concrete panels (4 ft by 14 ft by 8 in thick), wrap the new ramp with keyed Class 2 riprap, and place and compact about 2 inches of asphalt concrete pavement (roughly 7 tons) to match existing grades.
BOAT RAMP REPLACEMENT: the scope is to replace the failing existing concrete plank ramp with a concrete boat ramp panel system. This work consist of removing and resetting 60 feet long x 8 feet wide floating dock, installing approximate 150 feet erosion control mechanism (silt curtain), sawcut existing pavement, removing approximately 3 cubic yards existing asphalt concrete, removing an existing 30 feet long x 12 feet wide concrete plank boat ramp, excavating grading 45 cubic yards of embankment, placing 100 square yards geotextile type II, placing and compacting 6 inch layer aggregate, 15 cubic yards government source, erecting and installing panel steel rail system, placing nine 4 feet long x 14 feet wide x 8 inch thick concrete panels, wrapping the new boat ramp with keyed class 2 riprap and finally placing and compacting 2 inch thick asphalt concrete payment, approximately 7 ton, matching existing to proposed grades.
From Solicitation posted on Feb 26, 2026Notice history
1-
Solicitation LATEST Posted Feb 26, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA