GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, Colorado 1240LT26Q0107
Summary
AI-generated · Aug 07, 2026Complete the Crystal Lakes water and septic resuscitation in PSICC, Colorado: install a 2-inch HDPE waterline beneath Colorado Highway 24 and perform all Subsurface Utility Engineering required for CDOT permitting, connecting the new line from Dwelling 1 to the existing distribution. Replace the well pump to provide a 15 GPM supply, install a dual-stage booster pump and basement water storage, and carry out related electrical work (relocate meters, bury service lines, upgrade panels) to support the water and booster systems. Replace multiple septic systems serving the Blue House, Brown House, Bunkhouse, and Shop, install new sewer and dosing infrastructure, and perform asphalt removal along with new road and gate installation.
This project involves installing a new 2-inch HDPE waterline beneath Colorado Highway 24, including completing all Subsurface Utility Engineering required for CDOT permitting. Work includes connecting the new waterline from Dwelling 1 to the existing distribution system, replacing the well pump to provide a 15 GPM supply, installing a dual‑stage booster pump and basement water storage, and performing associated electrical upgrades such as relocating meters, burying service lines, upgrading panels, and supporting septic and booster pump systems. The project also replaces multiple septic systems serving the Blue House, Brown House, Bunkhouse, and Shop, installs new sewer and dosing infrastructure, and includes asphalt removal along with new road and gate installation.
From Combined Synopsis/Solicitation posted on Aug 07, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA