GAOA Lake Winfield Scott Campground (GA) 12445226Q0003

Solicitation 12445226Q0003 Copied Notice ID f013bf41f8094a22994eb51c107228c3 Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA EAST 12
SAM.gov
Posted
Jan 15, 2026
Deadline
Feb 25, 2026
Set-aside
SBA
NAICS
236220
PSC
Y1FB

Summary

AI-generated · Jan 16, 2026

Construct campground facilities at Lake Winfield Scott within the Blue Ridge Ranger District of the Chattahoochee-Oconee National Forests. A site visit is scheduled at the Blue Ridge Ranger District location; be aware that bridge construction on SR-180 at Slaughter Creek has reduced the roadway to a single lane with automated traffic signals, so plan travel accordingly.

Questions or requests for information must be submitted by the stated deadline via email.

Project: GAOA Lake Winfield Scott Campground Construction located at Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572. Site Visit: Wednesday, 1/28/26 at 10am EST, located at the Blue Ridge Ranger District, 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512) ****Bridge construction is ongoing on SR-180 at Slaughter Creek. The roadway is reduced to a single lane with automated traffic signals. Plan accordingly**** RFI's/Questions: Due Friday, 1/30/26 by 1pm EST via email.

From Solicitation posted on Jan 15, 2026

January 23,2026 Due to the inclement weather, the site visit on January 28, 2026 is postponed. Continue to monitor the description section for new site visit details. Also, the deadline for questions and quotes will be extended via solicitation amendment. _________________________________________________________________________________________________ Project: GAOA Lake Winfield Scott Campground Construction located at Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572. Site Visit: Wednesday, 1/28/26 at 10am EST, located at the Blue Ridge Ranger District, 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512) ****Bridge construction is ongoing on SR-180 at Slaughter Creek. The roadway is reduced to a single lane with automated traffic signals. Plan accordingly**** RFI's/Questions: Due Friday, 1/30/26 by 1pm EST via email.

From Solicitation posted on Jan 23, 2026

Amendment 0001 - Amendment 0001 to update site visit date, Question & Answer date, and RFQ proposal due date. Also updated A1 - rev RFQ Terms and Conditions 12445226Q0003. Description - This project is intended to replace existing infrastructure that is obsolete and beyond its usable life. If left in place, deferred maintenance costs will continue to increase and further damage will occur. The following areas shall be addressed as part of the scope of work: Replacing existing north loop bathhouse, updating the water and sewer systems, soil erosion control/site stabilization, survey staking and pavement repairs. *Optional items to be addressed if possible: replacing existing south loop bathhouse, repairs/renovations to guard shack and replacement of entrance/dump station. Refer to schedule of items (A3 SOI) for further details. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Solicitation number 12445226Q0003 is issued as a Request for Quotation (RFQ) for GAOA Lake Winfield Scott Campground Construction located at the Blue Ridge Ranger District in Blairsville, GA. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The applicable North American Industry Classification Standard Code is 236220 - Commercial and Institutional Building Construction The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. FAR 36.204 Magnitude of Construction Project - Between $1,000,000 and $5,000,000. A SF1442 will be provided to the awardee for signature. A bid guarantee is required Site Visit: There will be a site visit on Wednesday, 2/11/26 at 10am EST located at the Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512). **Offerors are highly encouraged to attend the site visit. Please submit your RSVP via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov no later than Tuesday, 2/10/26 by 1pm EST. Questions Questions shall be submitted via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov due no later than Friday, 2/13/26 by 1:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number (EX: 12445226Q0003 GAOA Lake Winfield Scott) as the subject line of the email. ----------------------------------------------------- January 23,2026 Due to the inclement weather, the site visit on January 28, 2026 is postponed. Continue to monitor the description section for new site visit details. Also, the deadline for questions and quotes will be extended via solicitation amendment. _________________________________________________________________________________________________ Project: GAOA Lake Winfield Scott Campground Construction located at Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572. Site Visit: Wednesday, 1/28/26 at 10am EST, located at the Blue Ridge Ranger District, 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512) ****Bridge construction is ongoing on SR-180 at Slaughter Creek. The roadway is reduced to a single lane with automated traffic signals. Plan accordingly**** RFI's/Questions: Due Friday, 1/30/26 by 1pm EST via email.

From Solicitation posted on Jan 30, 2026

Amendment 0001 - Amendment 0001 to update site visit date, Question & Answer date, and RFQ proposal due date. Also updated A1 - rev RFQ Terms and Conditions 12445226Q0003. Description - This project is intended to replace existing infrastructure that is obsolete and beyond its usable life. If left in place, deferred maintenance costs will continue to increase and further damage will occur. The following areas shall be addressed as part of the scope of work: Replacing existing north loop bathhouse, updating the water and sewer systems, soil erosion control/site stabilization, survey staking and pavement repairs. *Optional items to be addressed if possible: replacing existing south loop bathhouse, repairs/renovations to guard shack and replacement of entrance/dump station. Refer to schedule of items (A3 SOI) for further details. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Solicitation number 12445226Q0003 is issued as a Request for Quotation (RFQ) for GAOA Lake Winfield Scott Campground Construction located at the Blue Ridge Ranger District in Blairsville, GA. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The applicable North American Industry Classification Standard Code is 236220 - Commercial and Institutional Building Construction The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. FAR 36.204 Magnitude of Construction Project - Between $1,000,000 and $5,000,000. A SF1442 will be provided to the awardee for signature. A bid guarantee is required Site Visit: There will be a site visit on Wednesday, 2/11/26 at 10am EST located at the Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512). **Offerors are highly encouraged to attend the site visit. Please submit your RSVP via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov no later than Tuesday, 2/10/26 by 1pm EST. Questions Questions shall be submitted via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov due no later than Friday, 2/13/26 by 1:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number (EX: 12445226Q0003 GAOA Lake Winfield Scott) as the subject line of the email. ----------------------------------------------------- January 23,2026 Due to the inclement weather, the site visit on January 28, 2026 is postponed. Continue to monitor the description section for new site visit details. Also, the deadline for questions and quotes will be extended via solicitation amendment. _________________________________________________________________________________________________ Project: GAOA Lake Winfield Scott Campground Construction located at Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572. Site Visit: Wednesday, 1/28/26 at 10am EST, located at the Blue Ridge Ranger District, 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512) ****Bridge construction is ongoing on SR-180 at Slaughter Creek. The roadway is reduced to a single lane with automated traffic signals. Plan accordingly**** RFI's/Questions: Due Friday, 1/30/26 by 1pm EST via email.

From Solicitation posted on Feb 13, 2026

3/7/26 An incorrect Attachment A1 - rev2 RFQ T & C was inadvertantly uploaded at the time of Amendment 0002. The correct A1 - rev2 RFQ T & C has been uploaded. Amendment 0002 - Amendment 0002 includes a revised A2- SOW, revised A3- SOI, revised A1- Term & Conditions, extend quote due date and update evaluation and submittal process. Quote due date has changed to 3/23/26 by 5pm EST. ------------------------------------------------------------------------------------ **Amendment 0002 is currently being worked to answer all questions received by the due date and time. The bid due date has extended from 3/11/26 to 3/23/26. More to come in the next few days. Thank you for your interest in ths project** ------------------------------------------------------------------------------------- Amendment 0001 - Amendment 0001 to update site visit date, Question & Answer date, and RFQ proposal due date. Also updated A1 - rev RFQ Terms and Conditions 12445226Q0003. Description - This project is intended to replace existing infrastructure that is obsolete and beyond its usable life. If left in place, deferred maintenance costs will continue to increase and further damage will occur. The following areas shall be addressed as part of the scope of work: Replacing existing north loop bathhouse, updating the water and sewer systems, soil erosion control/site stabilization, survey staking and pavement repairs. *Optional items to be addressed if possible: replacing existing south loop bathhouse, repairs/renovations to guard shack and replacement of entrance/dump station. Refer to schedule of items (A3 SOI) for further details. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Solicitation number 12445226Q0003 is issued as a Request for Quotation (RFQ) for GAOA Lake Winfield Scott Campground Construction located at the Blue Ridge Ranger District in Blairsville, GA. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The applicable North American Industry Classification Standard Code is 236220 - Commercial and Institutional Building Construction The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. FAR 36.204 Magnitude of Construction Project - Between $1,000,000 and $5,000,000. A SF1442 will be provided to the awardee for signature. A bid guarantee is required Site Visit: There will be a site visit on Wednesday, 2/11/26 at 10am EST located at the Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512). **Offerors are highly encouraged to attend the site visit. Please submit your RSVP via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov no later than Tuesday, 2/10/26 by 1pm EST. Questions Questions shall be submitted via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov due no later than Friday, 2/13/26 by 1:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number (EX: 12445226Q0003 GAOA Lake Winfield Scott) as the subject line of the email. ----------------------------------------------------- January 23,2026 Due to the inclement weather, the site visit on January 28, 2026 is postponed. Continue to monitor the description section for new site visit details. Also, the deadline for questions and quotes will be extended via solicitation amendment. _________________________________________________________________________________________________ Project: GAOA Lake Winfield Scott Campground Construction located at Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572. Site Visit: Wednesday, 1/28/26 at 10am EST, located at the Blue Ridge Ranger District, 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512) ****Bridge construction is ongoing on SR-180 at Slaughter Creek. The roadway is reduced to a single lane with automated traffic signals. Plan accordingly**** RFI's/Questions: Due Friday, 1/30/26 by 1pm EST via email.

From Solicitation posted on Mar 07, 2026

3/10/26 Updated Attached A5 - rev LWS Architectural Set as printing was reduced to 8 1/2 x 11. New revised A5 in Attachments for printing 24x36. ---------------------------------------------------------------------------------- 3/7/26 An incorrect Attachment A1 - rev2 RFQ T & C was inadvertantly uploaded at the time of Amendment 0002. The correct A1 - rev2 RFQ T & C has been uploaded. Amendment 0002 - Amendment 0002 includes a revised A2- SOW, revised A3- SOI, revised A1- Term & Conditions, extend quote due date and update evaluation and submittal process. Quote due date has changed to 3/23/26 by 5pm EST. ------------------------------------------------------------------------------------ **Amendment 0002 is currently being worked to answer all questions received by the due date and time. The bid due date has extended from 3/11/26 to 3/23/26. More to come in the next few days. Thank you for your interest in ths project** ------------------------------------------------------------------------------------- Amendment 0001 - Amendment 0001 to update site visit date, Question & Answer date, and RFQ proposal due date. Also updated A1 - rev RFQ Terms and Conditions 12445226Q0003. Description - This project is intended to replace existing infrastructure that is obsolete and beyond its usable life. If left in place, deferred maintenance costs will continue to increase and further damage will occur. The following areas shall be addressed as part of the scope of work: Replacing existing north loop bathhouse, updating the water and sewer systems, soil erosion control/site stabilization, survey staking and pavement repairs. *Optional items to be addressed if possible: replacing existing south loop bathhouse, repairs/renovations to guard shack and replacement of entrance/dump station. Refer to schedule of items (A3 SOI) for further details. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Solicitation number 12445226Q0003 is issued as a Request for Quotation (RFQ) for GAOA Lake Winfield Scott Campground Construction located at the Blue Ridge Ranger District in Blairsville, GA. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The applicable North American Industry Classification Standard Code is 236220 - Commercial and Institutional Building Construction The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. FAR 36.204 Magnitude of Construction Project - Between $1,000,000 and $5,000,000. A SF1442 will be provided to the awardee for signature. A bid guarantee is required Site Visit: There will be a site visit on Wednesday, 2/11/26 at 10am EST located at the Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512). **Offerors are highly encouraged to attend the site visit. Please submit your RSVP via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov no later than Tuesday, 2/10/26 by 1pm EST. Questions Questions shall be submitted via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov due no later than Friday, 2/13/26 by 1:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number (EX: 12445226Q0003 GAOA Lake Winfield Scott) as the subject line of the email. ----------------------------------------------------- January 23,2026 Due to the inclement weather, the site visit on January 28, 2026 is postponed. Continue to monitor the description section for new site visit details. Also, the deadline for questions and quotes will be extended via solicitation amendment. _________________________________________________________________________________________________ Project: GAOA Lake Winfield Scott Campground Construction located at Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572. Site Visit: Wednesday, 1/28/26 at 10am EST, located at the Blue Ridge Ranger District, 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512) ****Bridge construction is ongoing on SR-180 at Slaughter Creek. The roadway is reduced to a single lane with automated traffic signals. Plan accordingly**** RFI's/Questions: Due Friday, 1/30/26 by 1pm EST via email.

From Solicitation posted on Mar 10, 2026

3/12/26 Updated Attachment A3 - Rev SOI LWS Mar2026 for: Base Bid Item 7 Sanitary Sewer: Construct Access Road line item removed, duplicate. Broken out in Item 8 Service Road Construction in the last version. Option Bid Item 2 (Entrance/ Dump Station): Survey Staking & Soil Erosion Control and Site Stabilization removed, duplicate and in Base Bid, Clearing and Grubbing removed, not necessary. Option Bid Item 3 (Guard Shack): Clearing and Grubbing removed, not necessary. ---------------------------------------------------------------------------------- 3/10/26 Updated Attached A5 - rev LWS Architectural Set as printing was reduced to 8 1/2 x 11. New revised A5 in Attachments for printing 24x36. ---------------------------------------------------------------------------------- 3/7/26 An incorrect Attachment A1 - rev2 RFQ T & C was inadvertantly uploaded at the time of Amendment 0002. The correct A1 - rev2 RFQ T & C has been uploaded. Amendment 0002 - Amendment 0002 includes a revised A2- SOW, revised A3- SOI, revised A1- Term & Conditions, extend quote due date and update evaluation and submittal process. Quote due date has changed to 3/23/26 by 5pm EST. ------------------------------------------------------------------------------------ **Amendment 0002 is currently being worked to answer all questions received by the due date and time. The bid due date has extended from 3/11/26 to 3/23/26. More to come in the next few days. Thank you for your interest in ths project** ------------------------------------------------------------------------------------- Amendment 0001 - Amendment 0001 to update site visit date, Question & Answer date, and RFQ proposal due date. Also updated A1 - rev RFQ Terms and Conditions 12445226Q0003. Description - This project is intended to replace existing infrastructure that is obsolete and beyond its usable life. If left in place, deferred maintenance costs will continue to increase and further damage will occur. The following areas shall be addressed as part of the scope of work: Replacing existing north loop bathhouse, updating the water and sewer systems, soil erosion control/site stabilization, survey staking and pavement repairs. *Optional items to be addressed if possible: replacing existing south loop bathhouse, repairs/renovations to guard shack and replacement of entrance/dump station. Refer to schedule of items (A3 SOI) for further details. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Solicitation number 12445226Q0003 is issued as a Request for Quotation (RFQ) for GAOA Lake Winfield Scott Campground Construction located at the Blue Ridge Ranger District in Blairsville, GA. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The applicable North American Industry Classification Standard Code is 236220 - Commercial and Institutional Building Construction The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. FAR 36.204 Magnitude of Construction Project - Between $1,000,000 and $5,000,000. A SF1442 will be provided to the awardee for signature. A bid guarantee is required Site Visit: There will be a site visit on Wednesday, 2/11/26 at 10am EST located at the Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512). **Offerors are highly encouraged to attend the site visit. Please submit your RSVP via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov no later than Tuesday, 2/10/26 by 1pm EST. Questions Questions shall be submitted via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov due no later than Friday, 2/13/26 by 1:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number (EX: 12445226Q0003 GAOA Lake Winfield Scott) as the subject line of the email. ----------------------------------------------------- January 23,2026 Due to the inclement weather, the site visit on January 28, 2026 is postponed. Continue to monitor the description section for new site visit details. Also, the deadline for questions and quotes will be extended via solicitation amendment. _________________________________________________________________________________________________ Project: GAOA Lake Winfield Scott Campground Construction located at Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572. Site Visit: Wednesday, 1/28/26 at 10am EST, located at the Blue Ridge Ranger District, 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512) ****Bridge construction is ongoing on SR-180 at Slaughter Creek. The roadway is reduced to a single lane with automated traffic signals. Plan accordingly**** RFI's/Questions: Due Friday, 1/30/26 by 1pm EST via email.

From Solicitation posted on Mar 12, 2026

3/19/26 Amendment 3 to include additional questions/answers (see attachment - Amend3 LWS Campground Recon) received by the due date/time and extend the bid due date from 3/23/26 to 3/27/26 at 5pm EST. ----------------------------------------------------------------------------- 3/12/26 Updated Attachment A3 - Rev SOI LWS Mar2026 for: Base Bid Item 7 Sanitary Sewer: Construct Access Road line item removed, duplicate. Broken out in Item 8 Service Road Construction in the last version. Option Bid Item 2 (Entrance/ Dump Station): Survey Staking & Soil Erosion Control and Site Stabilization removed, duplicate and in Base Bid, Clearing and Grubbing removed, not necessary. Option Bid Item 3 (Guard Shack): Clearing and Grubbing removed, not necessary. ---------------------------------------------------------------------------------- 3/10/26 Updated Attached A5 - rev LWS Architectural Set as printing was reduced to 8 1/2 x 11. New revised A5 in Attachments for printing 24x36. ---------------------------------------------------------------------------------- 3/7/26 An incorrect Attachment A1 - rev2 RFQ T & C was inadvertantly uploaded at the time of Amendment 0002. The correct A1 - rev2 RFQ T & C has been uploaded. Amendment 0002 - Amendment 0002 includes a revised A2- SOW, revised A3- SOI, revised A1- Term & Conditions, extend quote due date and update evaluation and submittal process. Quote due date has changed to 3/23/26 by 5pm EST. ------------------------------------------------------------------------------------ **Amendment 0002 is currently being worked to answer all questions received by the due date and time. The bid due date has extended from 3/11/26 to 3/23/26. More to come in the next few days. Thank you for your interest in ths project** ------------------------------------------------------------------------------------- Amendment 0001 - Amendment 0001 to update site visit date, Question & Answer date, and RFQ proposal due date. Also updated A1 - rev RFQ Terms and Conditions 12445226Q0003. Description - This project is intended to replace existing infrastructure that is obsolete and beyond its usable life. If left in place, deferred maintenance costs will continue to increase and further damage will occur. The following areas shall be addressed as part of the scope of work: Replacing existing north loop bathhouse, updating the water and sewer systems, soil erosion control/site stabilization, survey staking and pavement repairs. *Optional items to be addressed if possible: replacing existing south loop bathhouse, repairs/renovations to guard shack and replacement of entrance/dump station. Refer to schedule of items (A3 SOI) for further details. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Solicitation number 12445226Q0003 is issued as a Request for Quotation (RFQ) for GAOA Lake Winfield Scott Campground Construction located at the Blue Ridge Ranger District in Blairsville, GA. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The applicable North American Industry Classification Standard Code is 236220 - Commercial and Institutional Building Construction The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. FAR 36.204 Magnitude of Construction Project - Between $1,000,000 and $5,000,000. A SF1442 will be provided to the awardee for signature. A bid guarantee is required Site Visit: There will be a site visit on Wednesday, 2/11/26 at 10am EST located at the Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512). **Offerors are highly encouraged to attend the site visit. Please submit your RSVP via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov no later than Tuesday, 2/10/26 by 1pm EST. Questions Questions shall be submitted via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov due no later than Friday, 2/13/26 by 1:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number (EX: 12445226Q0003 GAOA Lake Winfield Scott) as the subject line of the email. ----------------------------------------------------- January 23,2026 Due to the inclement weather, the site visit on January 28, 2026 is postponed. Continue to monitor the description section for new site visit details. Also, the deadline for questions and quotes will be extended via solicitation amendment. _________________________________________________________________________________________________ Project: GAOA Lake Winfield Scott Campground Construction located at Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572. Site Visit: Wednesday, 1/28/26 at 10am EST, located at the Blue Ridge Ranger District, 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512) ****Bridge construction is ongoing on SR-180 at Slaughter Creek. The roadway is reduced to a single lane with automated traffic signals. Plan accordingly**** RFI's/Questions: Due Friday, 1/30/26 by 1pm EST via email.

From Solicitation posted on Mar 19, 2026

3/26/26 Amendment 4 updates Attachment 'A1- rev3 RFQ T and C' correcting evaluation methodology for Past Performance and Price factors. No bid extension for this RFQ, bid due date remains Friday, 3/27/26 at 5pm EST. ----------------------------------------------------------------------------- 3/19/26 Amendment 3 to include additional questions/answers (see attachment - Amend3 LWS Campground Recon) received by the due date/time and extend the bid due date from 3/23/26 to 3/27/26 at 5pm EST. ----------------------------------------------------------------------------- 3/12/26 Updated Attachment A3 - Rev SOI LWS Mar2026 for: Base Bid Item 7 Sanitary Sewer: Construct Access Road line item removed, duplicate. Broken out in Item 8 Service Road Construction in the last version. Option Bid Item 2 (Entrance/ Dump Station): Survey Staking & Soil Erosion Control and Site Stabilization removed, duplicate and in Base Bid, Clearing and Grubbing removed, not necessary. Option Bid Item 3 (Guard Shack): Clearing and Grubbing removed, not necessary. ---------------------------------------------------------------------------------- 3/10/26 Updated Attached A5 - rev LWS Architectural Set as printing was reduced to 8 1/2 x 11. New revised A5 in Attachments for printing 24x36. ---------------------------------------------------------------------------------- 3/7/26 An incorrect Attachment A1 - rev2 RFQ T & C was inadvertantly uploaded at the time of Amendment 0002. The correct A1 - rev2 RFQ T & C has been uploaded. Amendment 0002 - Amendment 0002 includes a revised A2- SOW, revised A3- SOI, revised A1- Term & Conditions, extend quote due date and update evaluation and submittal process. Quote due date has changed to 3/23/26 by 5pm EST. ------------------------------------------------------------------------------------ **Amendment 0002 is currently being worked to answer all questions received by the due date and time. The bid due date has extended from 3/11/26 to 3/23/26. More to come in the next few days. Thank you for your interest in ths project** ------------------------------------------------------------------------------------- Amendment 0001 - Amendment 0001 to update site visit date, Question & Answer date, and RFQ proposal due date. Also updated A1 - rev RFQ Terms and Conditions 12445226Q0003. Description - This project is intended to replace existing infrastructure that is obsolete and beyond its usable life. If left in place, deferred maintenance costs will continue to increase and further damage will occur. The following areas shall be addressed as part of the scope of work: Replacing existing north loop bathhouse, updating the water and sewer systems, soil erosion control/site stabilization, survey staking and pavement repairs. *Optional items to be addressed if possible: replacing existing south loop bathhouse, repairs/renovations to guard shack and replacement of entrance/dump station. Refer to schedule of items (A3 SOI) for further details. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Solicitation number 12445226Q0003 is issued as a Request for Quotation (RFQ) for GAOA Lake Winfield Scott Campground Construction located at the Blue Ridge Ranger District in Blairsville, GA. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The applicable North American Industry Classification Standard Code is 236220 - Commercial and Institutional Building Construction The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. FAR 36.204 Magnitude of Construction Project - Between $1,000,000 and $5,000,000. A SF1442 will be provided to the awardee for signature. A bid guarantee is required Site Visit: There will be a site visit on Wednesday, 2/11/26 at 10am EST located at the Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512). **Offerors are highly encouraged to attend the site visit. Please submit your RSVP via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov no later than Tuesday, 2/10/26 by 1pm EST. Questions Questions shall be submitted via email to penny.zortman@usda.gov and Jalisa.sims@usda.gov due no later than Friday, 2/13/26 by 1:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number (EX: 12445226Q0003 GAOA Lake Winfield Scott) as the subject line of the email. ----------------------------------------------------- January 23,2026 Due to the inclement weather, the site visit on January 28, 2026 is postponed. Continue to monitor the description section for new site visit details. Also, the deadline for questions and quotes will be extended via solicitation amendment. _________________________________________________________________________________________________ Project: GAOA Lake Winfield Scott Campground Construction located at Blue Ridge Ranger District Chattahoochee-Oconee National Forests 439 Lake Winfield Scott Rd Suches, GA 30572. Site Visit: Wednesday, 1/28/26 at 10am EST, located at the Blue Ridge Ranger District, 439 Lake Winfield Scott Rd Suches, GA 30572 (Coordinates: 34.732393, -83.976512) ****Bridge construction is ongoing on SR-180 at Slaughter Creek. The roadway is reduced to a single lane with automated traffic signals. Plan accordingly**** RFI's/Questions: Due Friday, 1/30/26 by 1pm EST via email.

From Solicitation posted on Mar 26, 2026

Notice history

9
  1. Solicitation Posted Jan 15, 2026
  2. Solicitation Posted Jan 23, 2026
    • Description: Description was updated
  3. Solicitation Posted Jan 30, 2026
    • Description: Description was updated
    • Response Deadline: Feb 25, 2026Mar 11, 2026
  4. Solicitation Posted Feb 13, 2026
    No changes from previous notice
  5. Solicitation Posted Mar 07, 2026
    • Description: Description was updated
    • Response Deadline: Mar 11, 2026Mar 23, 2026
  6. Solicitation Posted Mar 10, 2026
    • Description: Description was updated
  7. Solicitation Posted Mar 12, 2026
    • Description: Description was updated
  8. Solicitation Posted Mar 19, 2026
    • Description: Description was updated
    • Response Deadline: Mar 23, 2026Mar 27, 2026
  9. Solicitation LATEST Posted Mar 26, 2026
    • Description: Description was updated

Details

Solicitation number 12445226Q0003
Notice ID f013bf41f8094a22994eb51c107228c3
Notice type Solicitation
Product / Service (PSC) Y1FB
NAICS 236220
Place of performance Georgia
Archive date Mar 12, 2026

Award Information

Not yet awarded

Contacts

primary
Penny Zortman

Email

secondary
SIMS, JALISA C

Email

Phone

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA EAST 12

Place of Performance

Georgia
USA

Dates

Posted Jan 15, 2026 6 months ago
Last Updated Aug 06, 2026 1 day ago
Due Feb 25, 2026 5 months ago