Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 4 notices 8 documents

Black River Harbor Waterfall Overlook Reconstruction 12445525B0016

Solicitation 12445525B0016 Copied Notice ID 33e4de3e0cce4ec5879a693d46210546 Copied AGRICULTURE, DEPARTMENT OF — SHAWNEE NATIONAL FOREST
SAM.gov
Posted
Oct 06, 2025
Deadline
Oct 08, 2025
Set-aside
SBA
NAICS
237990
PSC
Z2PA

Summary

AI-generated · Aug 24, 2025

Repaving and parking improvements for GAOA Bell Springs in Shawnee National Forest (Hidden Springs Ranger District) require a contractor to perform a broad range of roadway and drainage work. Tasks include mobilization, drainage excavation, brushing and clearing, clearing and grubbing, placement of aggregate base and surface, roadway reconditioning or construction of new roadway sections, culvert removal and new installation, small headwall work for culverts, and specialty masonry to remove and replace a historic stone headwall. The contractor must furnish all labor, supervision, equipment, materials, transportation, and incidentals (unless something is Government-furnished) and ensure all equipment complies with applicable laws.

Bonds are required: performance and payment bonds plus a bid guarantee. The project is estimated to range from $1,000,000 to $5,000,000 in value. The work site is within the Shawnee National Forest, and all terms and provisions of the contract apply.

THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT SEPTEMBER 1, 2025. PROJECT DESCRIPTION: GAOA Bell Springs Repaving and Parking The GAOA Bell Springs Repaving and Parking project consists Work for this project consists of, but is not limited to: mobilization, drainage excavation, brushing, clearing and grubbing, aggregate base and surface placement, roadway reconditioning, roadway excavation / new roadway construction, culvert removal / new installation, small culvert headwall removal / installation, and specialty masonry to remove and replace a historic stone headwall. Contractor is responsible for ensuring all equipment meets State, Federal, and Local Laws. PROJECT LOCATION: This project is located in the Shawnee National Forest on the Hidden Springs Ranger District. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around May 1, 2026. Engineering point of contact is Austin Henk, email austin.henk@usda.gov. Both performance and payment bonds will be required for this project as well as a bid guarantee. Estimated project value is between $1,000,000 and $5,000,000. NAICS 237310 with size standard $39.5 mil. This project is set aside 100% for small business.

From Presolicitation posted on Aug 18, 2025

The USDA, Forest Service has a requirement for the Black River Falls Overlook rehabilitation located on the Ottawa National Forest. Please see the attached bid documents. All questions shall be submitted by September 24, 2025. Questions submitted after this date may not be addressed.

From Solicitation posted on Sep 08, 2025

The USDA, Forest Service has a requirement for the Black River Falls Overlook rehabilitation located on the Ottawa National Forest. Please see the attached bid documents. All questions shall be submitted by September 24, 2025. Questions submitted after this date may not be addressed.

From Solicitation posted on Sep 30, 2025

***This public bid opening has been put on hold until further notice.*** The USDA, Forest Service has a requirement for the Black River Falls Overlook rehabilitation located on the Ottawa National Forest. Please see the attached bid documents. All questions shall be submitted by September 24, 2025. Questions submitted after this date may not be addressed.

From Solicitation posted on Oct 06, 2025

Notice history

4
  1. Presolicitation Posted Aug 18, 2025 View
  2. Solicitation Posted Sep 08, 2025
    • Title: GAOA Bell Smith Springs Repaving and ParkingBlack River Harbor Waterfall Overlook Reconstruction
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Sep 01, 2025Oct 08, 2025
    • Set-Aside: NoneTotal Small Business Set-Aside (FAR 19.5)
    • NAICS Codes: 237310237990
  3. Solicitation Posted Sep 30, 2025
    No changes from previous notice
  4. Solicitation LATEST Posted Oct 06, 2025
    • Description: Description was updated

Details

Solicitation number 12445525B0016
Notice ID 33e4de3e0cce4ec5879a693d46210546
Notice type Solicitation
Product / Service (PSC) Z2PA
NAICS 237990
Place of performance Bessemer, Michigan
Archive date Oct 23, 2025

Award Information

Not yet awarded

Contacts

primary
Brad Higley

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
SHAWNEE NATIONAL FOREST

Place of Performance

Bessemer, Michigan 49911
USA

Dates

Posted Oct 06, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Oct 08, 2025 9 months ago