AI-generated · Aug 24, 2025Paving project consists of performing full depth reclamation (FDR) and installing two 1.5 lifts of Type II concrete on the Bay Furnace Campground Road, plus preparing existing gravel parking spurs for asphalt and then applying two 1.5 lifts of Type II concrete, all in accordance with contract specifications and current industry standards. The work is located at Bay Furnace Campground, Munising, MI, and the contractor must furnish all labor, supervision, equipment, materials, transportation, and incidentals (unless government-furnished) and ensure compliance with state, federal, and local laws. The project requires bid and performance and payment bonds, and the anticipated duration is about four weeks, with an estimated value between $500,000 and $1,000,000.
THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT SEPTEMBER 1, 2025. PROJECT DESCRIPTION: GAOA Bay Furnace Campground Paving Project The GAOA Bay Furnace Campground paving project consists of performing full depth reclamation (FDR) and install two 1.5 lifts of Type II concrete of the Bay Furnace Campground Road. The contractor shall also prepare the existing gravel parking spurs for asphalt and then apply two 1.5 lifts of Type II concrete in accordance with specification and exhibits in this contract, and current industry standards. Contractor is responsible for ensuring all equipment meets State, Federal, and Local Laws. PROJECT LOCATION: The project is located at the Hiawatha National Forest Munising District Bay Furnace Campground at Bay Furnace Rd, M-28, Munising, MI 49862. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around 7 September 2026. Peirod of performance is 4 weeks. Engineering point of contact is Greg Gardner, telephone: 906-428-5887. Both performance and payment bonds will be required for this project as well as a bid guarantee. Estimated project value is between $500,000 and $1,000,000. NAICS 237310 with size standard $39.5 mil. This project is set aside 100% for small business.
From Presolicitation posted on Aug 18, 2025GAOA Bay Furnace Campground Paving Project A site visit will be held on September 15, 2025 All questions are due no later than 22 September 2025. Send all questions to Paula Sales at paula.sales@usda.gov
From Solicitation posted on Sep 09, 2025GAOA Bay Furnace Campground Paving Project Amendment 1: Updated Attachment 1 and Attachment 2. Updated Schedule of Items added as Attachment 4. Changes in statement of work and drawings are as follows: Cross sections for the roadway and campground spurs have been added. Cross sections show required 2 wide shoulders. Thickness of pavement on campground spurs has been reduced to 2 thick. Numbered locations and lengths of campground spurs have been added to the drawings. Specifications for Full Depth Reclamation has been changed to Section 304, from Section 306. This is a much simpler process that should give us a better price and is what we originally intended. Allowable hours of operation have been changed to 06:00 to 18:00. The Schedule of Items Quote Form has been changed to show the paving of the campground spurs as an alternate add. The time of year when the work can be done has been clarified. We would prefer the work to be done in the Spring before campground opening, and the campground opening can be delayed into early June if we have a six month notice of when the work will be scheduled. A site visit will be held on September 15, 2025 All questions are due no later than 22 September 2025. Send all questions to Paula Sales at paula.sales@usda.gov
From Solicitation posted on Sep 18, 2025GAOA Bay Furnace Campground Paving Project Amendment 1: Updated Attachment 1 and Attachment 2. Updated Schedule of Items added as Attachment 4. Changes in statement of work and drawings are as follows: Cross sections for the roadway and campground spurs have been added. Cross sections show required 2 wide shoulders. Thickness of pavement on campground spurs has been reduced to 2 thick. Numbered locations and lengths of campground spurs have been added to the drawings. Specifications for Full Depth Reclamation has been changed to Section 304, from Section 306. This is a much simpler process that should give us a better price and is what we originally intended. Allowable hours of operation have been changed to 06:00 to 18:00. The Schedule of Items Quote Form has been changed to show the paving of the campground spurs as an alternate add. The time of year when the work can be done has been clarified. We would prefer the work to be done in the Spring before campground opening, and the campground opening can be delayed into early June if we have a six month notice of when the work will be scheduled. A site visit will be held on September 15, 2025 All questions are due no later than 22 September 2025. Send all questions to Paula Sales at paula.sales@usda.gov
From Solicitation posted on Sep 24, 2025GAOA Bay Furnace Campground Paving Project Amendment 1: Updated Attachment 1 and Attachment 2. Updated Schedule of Items added as Attachment 4. Changes in statement of work and drawings are as follows: Cross sections for the roadway and campground spurs have been added. Cross sections show required 2 wide shoulders. Thickness of pavement on campground spurs has been reduced to 2 thick. Numbered locations and lengths of campground spurs have been added to the drawings. Specifications for Full Depth Reclamation has been changed to Section 304, from Section 306. This is a much simpler process that should give us a better price and is what we originally intended. Allowable hours of operation have been changed to 06:00 to 18:00. The Schedule of Items Quote Form has been changed to show the paving of the campground spurs as an alternate add. The time of year when the work can be done has been clarified. We would prefer the work to be done in the Spring before campground opening, and the campground opening can be delayed into early June if we have a six month notice of when the work will be scheduled. A site visit will be held on September 15, 2025 All questions are due no later than 22 September 2025. Send all questions to Paula Sales at paula.sales@usda.gov
From Solicitation posted on Sep 25, 2025GAOA Bay Furnace Campground Paving Project Amendment 1: Updated Attachment 1 and Attachment 2. Updated Schedule of Items added as Attachment 4. Changes in statement of work and drawings are as follows: Cross sections for the roadway and campground spurs have been added. Cross sections show required 2 wide shoulders. Thickness of pavement on campground spurs has been reduced to 2 thick. Numbered locations and lengths of campground spurs have been added to the drawings. Specifications for Full Depth Reclamation has been changed to Section 304, from Section 306. This is a much simpler process that should give us a better price and is what we originally intended. Allowable hours of operation have been changed to 06:00 to 18:00. The Schedule of Items Quote Form has been changed to show the paving of the campground spurs as an alternate add. The time of year when the work can be done has been clarified. We would prefer the work to be done in the Spring before campground opening, and the campground opening can be delayed into early June if we have a six month notice of when the work will be scheduled. A site visit will be held on September 15, 2025 All questions are due no later than 22 September 2025. Send all questions to Paula Sales at paula.sales@usda.gov
From Solicitation posted on Dec 23, 2025Notice history
6-
Presolicitation Posted Aug 18, 2025
-
Solicitation Posted Sep 09, 2025View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Sep 12, 2025 → Sep 25, 2025
-
Solicitation Posted Sep 24, 2025No changes from previous notice
-
Solicitation Posted Sep 25, 2025No changes from previous notice
-
Solicitation LATEST Posted Dec 23, 2025No changes from previous notice