G640 Concrete Landscape Beds N4008525R9006
Summary
AI-generated · Aug 26, 2025Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project to construct concrete landscape beds. See attached documents for the scope of work and applicable drawings. The facility/activity will remain in operation during the construction period, and the contractor must perform operations with the least possible interference to normal operations.
Records 1, 2, and 3 are identical in content; there is no new information or changes noted between notices.
Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings. The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations to cause the least possible interference with normal operations of the facility/activity.
From Combined Synopsis/Solicitation posted on Jul 08, 2025Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings. The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations to cause the least possible interference with normal operations of the facility/activity.
From Combined Synopsis/Solicitation posted on Jul 24, 2025Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings. The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations to cause the least possible interference with normal operations of the facility/activity.
From Combined Synopsis/Solicitation posted on Aug 12, 2025Notice history
4-
Combined Synopsis/Solicitation Posted Jul 08, 2025
-
Combined Synopsis/Solicitation Posted Jul 24, 2025No changes from previous notice
-
Combined Synopsis/Solicitation Posted Aug 12, 2025View changes (1)
- Response Deadline: Aug 11, 2025 → Aug 12, 2025
-
Award Notice LATEST Posted Jan 28, 2026
Details
Award Information
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| T E DAVIS CONSTRUCTION CO | GVU8QN8M81V1 | 4ECC6 | Jacksonville, NC |
Contacts
Phone
Agency
Place of Performance
USA