Contacts, documents and full notice history are available with a subscription.
Award Notice NONE 4 notices

FY26 Lake Marion Cameron Reach Water Lines W912HP26RA003

Solicitation W912HP26RA003 Copied Notice ID a847140838e14e69a5e085f3bd8b630d Copied DEPT OF DEFENSE — W074 ENDIST CHARLESTON
SAM.gov
Posted
Oct 01, 2025
Deadline
Nov 15, 2025
Set-aside
NONE
NAICS
237110
PSC
Y1NE

Summary

AI-generated · Oct 09, 2025

Furnish, install, and bring into operation approximately 65,000 linear feet of 12-inch diameter water main and 1,000 linear feet of 8-inch diameter water main, along with all associated work to place the Cameron Reach of the Lake Marion Regional Water System into service. The scope includes pipes, valves, appurtenances, roadway bores, horizontally directionally drilled pipe, backfill, compaction, testing, quality control, safety, and all other related activities required for operational readiness. The contract will be firm-fixed-price and is anticipated to have a project value in the $10–$25 million range.

The work is part of the Lake Marion Regional Water System, with portions owned, operated, and maintained by Santee Cooper and Calhoun County. The contractor must coordinate with local utility owners, property owners, Lake Marion Water Treatment Plant personnel, and Calhoun County. A formal solicitation with full details will follow this pre-solicitation, and bidders must be registered in SAM.gov prior to award. Offerors are responsible for monitoring the posting for changes.

PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction plans & specifications, instructions to offerors, and the evaluation factors/basis for award. OFFERORS ARE RESPONSIBLE FOR MONITORING THIS WEBSITE FOR CHANGES TO THIS NOTICE AND THE FORMAL SOLICITATION ANNOUNCEMENT. PLANNED SOLICITATION: The final Solicitation for this project will be announced anytime between 15 and 30 days after the posting of this pre-solicitation. The contract type will be firm-fixed-price. Scope of Work Summary. The Cameron Reach Water Main contract consists of the furnishing, installing, and placing into successful operation approximately 65,000 LF of 12-inch diameter water main pipe, 1,000 LF of 8-inch diameter water main pipe and all associated work. The contract includes all pipe, valves, appurtenances, roadway bores, horizontally directionally drilled pipe, backfill, compaction, testing, quality control, safety, and all other related work required to place the project into successful operation. This contract will be a portion of the Lake Marion Regional Water System with portions owned, operated, and maintained by both Santee Cooper and Calhoun County. The Contractor will be responsible for coordinating work with local utility owners, property owners, Lake Marion Water Treatment Plant personnel, and Calhoun County. MAGNITUDE OF WORK: $10,000,000 TO $25,000,000 The contractor must be registered in WWW.SAM.GOV prior to award of the solicitation.

From Presolicitation posted on Oct 01, 2025

THE CAMERON REACH WATER MAIN CONTRACT CONSISTS OF THE FURNISHING, INSTALLING, AND PLACING INTO SUCCESSFUL OPERATION APPROXIMATELY 65,000 LF OF 12-INCH DIAMETER WATER MAIN PIPE, 1,000 LF OF 8-INCH DIAMETER WATER MAIN PIPE AND ALL ASSOCIATED WORK. THE CONTRACT INCLUDES ALL PIPE, VALVES, APPURTENANCES, ROADWAY BORES, HORIZONTALLY DIRECTIONALLY DRILLED PIPE, BACKFILL, COMPACTION, TESTING, QUALITY CONTROL, SAFETY, AND ALL OTHER RELATED WORK REQUIRED TO PLACE THE PROJECT INTO SUCCESSFUL OPERATION. THIS CONTRACT WILL BE A PORTION OF THE LAKE MARION REGIONAL WATER SYSTEM WITH PORTIONS OWNED, OPERATED, AND MAINTAINED BY BOTH SANTEE COOPER AND CALHOUN COUNTY. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK WITH LOCAL UTILITY OWNERS, PROPERTY OWNERS, LAKE MARION WATER TREATMENT PLANT PERSONNEL, AND CALHOUN COUNTY. THIS SOLICITATION IS HEREBY POSTED ON 24 OCTOBER 2025.

From Solicitation posted on Oct 24, 2025

THE CAMERON REACH WATER MAIN CONTRACT CONSISTS OF THE FURNISHING, INSTALLING, AND PLACING INTO SUCCESSFUL OPERATION APPROXIMATELY 65,000 LF OF 12-INCH DIAMETER WATER MAIN PIPE, 1,000 LF OF 8-INCH DIAMETER WATER MAIN PIPE AND ALL ASSOCIATED WORK. THE CONTRACT INCLUDES ALL PIPE, VALVES, APPURTENANCES, ROADWAY BORES, HORIZONTALLY DIRECTIONALLY DRILLED PIPE, BACKFILL, COMPACTION, TESTING, QUALITY CONTROL, SAFETY, AND ALL OTHER RELATED WORK REQUIRED TO PLACE THE PROJECT INTO SUCCESSFUL OPERATION. THIS CONTRACT WILL BE A PORTION OF THE LAKE MARION REGIONAL WATER SYSTEM WITH PORTIONS OWNED, OPERATED, AND MAINTAINED BY BOTH SANTEE COOPER AND CALHOUN COUNTY. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK WITH LOCAL UTILITY OWNERS, PROPERTY OWNERS, LAKE MARION WATER TREATMENT PLANT PERSONNEL, AND CALHOUN COUNTY. THIS SOLICITATION IS HEREBY POSTED ON 24 OCTOBER 2025. THE PURPOSE OF THIS AMENDMENT 0001 IS TO PROVIDE An UPDATED CD02 PLAN SHEET. THIS AMENDMENT IS HEREBY POSTED AS OF 20 NOVEMBER 2025

From Solicitation posted on Nov 20, 2025

THE CAMERON REACH WATER MAIN CONTRACT CONSISTS OF THE FURNISHING, INSTALLING, AND PLACING INTO SUCCESSFUL OPERATION APPROXIMATELY 65,000 LF OF 12-INCH DIAMETER WATER MAIN PIPE, 1,000 LF OF 8-INCH DIAMETER WATER MAIN PIPE AND ALL ASSOCIATED WORK. THE CONTRACT INCLUDES ALL PIPE, VALVES, APPURTENANCES, ROADWAY BORES, HORIZONTALLY DIRECTIONALLY DRILLED PIPE, BACKFILL, COMPACTION, TESTING, QUALITY CONTROL, SAFETY, AND ALL OTHER RELATED WORK REQUIRED TO PLACE THE PROJECT INTO SUCCESSFUL OPERATION. THIS CONTRACT WILL BE A PORTION OF THE LAKE MARION REGIONAL WATER SYSTEM WITH PORTIONS OWNED, OPERATED, AND MAINTAINED BY BOTH SANTEE COOPER AND CALHOUN COUNTY. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK WITH LOCAL UTILITY OWNERS, PROPERTY OWNERS, LAKE MARION WATER TREATMENT PLANT PERSONNEL, AND CALHOUN COUNTY. THIS SOLICITATION IS HEREBY POSTED ON 24 OCTOBER 2025. THE PURPOSE OF THIS AMENDMENT 0001 IS TO PROVIDE An UPDATED CD02 PLAN SHEET. THIS AMENDMENT IS HEREBY POSTED AS OF 20 NOVEMBER 2025. This award was made to Chandler Construction in the amount of $16,471,000.00 and is hereby posted on 1.12.2026.

From Award Notice posted on Jan 12, 2026

Notice history

4
  1. Presolicitation Posted Oct 01, 2025
  2. Solicitation Posted Oct 24, 2025
    • Title: FY26 Lake Marion Cameron Reach Water LinesFY26 Lake Marion Cameron Reach Water Lines
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Nov 15, 2025Nov 24, 2025
    • Set-Aside: No Set aside usedNone
    • Status: InactiveActive
  3. Solicitation Posted Nov 20, 2025
    • Description: Description was updated
  4. Award Notice LATEST Posted Jan 12, 2026

Details

Solicitation number W912HP26RA003
Notice ID a847140838e14e69a5e085f3bd8b630d
Award number W912HP26CA002
Notice type Presolicitation
Product / Service (PSC) Y1NE
NAICS 237110
Set-aside No Set aside used
Place of performance Charleston, South Carolina
Archive date Nov 30, 2025

Award Information

Awardee
1
Total Awarded
$16,471,000.00
Award Date
Jan 12, 2026

Award Notices

FY26 Lake Marion Cameron Reach Water Lines View Notice

Posted: Jan 12, 2026

THE CAMERON REACH WATER MAIN CONTRACT CONSISTS OF THE FURNISHING, INSTALLING, AND PLACING INTO SUCCESSFUL OPERATION APPROXIMATELY 65,000 LF OF 12-INCH DIAMETER WATER MAIN PIPE, 1,000 LF OF 8-INCH DIAMETER WATER MAIN PIPE AND ALL ASSOCIATED WORK. THE CONTRACT INCLUDES ALL PIPE, VALVES, APPURTENANCES,...

Awardees

Company Name UEI CAGE Code Location
CHANDLER CONSTRUCTION SERVICES, INC. C87FBZZ9D341 0M045 Ninety Six, SC

Documents

No files available

View on SAM.gov

Contacts

primary
Evelyn HALLIBURTON

Email

Phone

secondary
Addison G. Layfield

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTH ATLANTIC
W074 ENDIST CHARLESTON

Place of Performance

Charleston, South Carolina 29403
USA

Dates

Posted Oct 01, 2025 10 months ago
Last Updated Aug 06, 2026 5 days ago
Due Nov 15, 2025 8 months ago