FY26 B509 Lift Station Repair FA441826Q0056
Summary
AI-generated · May 02, 2026Repair the sewer lift station at Building 509 on Joint Base Charleston by replacing four standpipes and bases, providing all labor, materials, parts, and equipment needed. Work includes setting up OSHA-permitted confined-space entry, plugging the manhole, installing a bypass pump while old components are removed, pulling pump #1 to access and remove guiderails, standpipes, and bases, installing new bases and standpipes, reinstalling guiderails with new brackets, and repeating the process for the remaining three standpipes. After installation, all components must be tested to ensure normal operation.
A mandatory site visit will be held for prospective bidders, with base access coordinated through the Joint Base Charleston Visitor Center. Attendees’ names and contact details must be provided to the Contract Specialist prior to the visit, and full requirements are detailed in the attachments.
The deadline for questions has been extended to 06 May 2026, 2:00 PM EDT due to the scheduled Site Visit. The attached Combined Synopsis/Solicitation Revision 1 reflects this change. A Site Visit will be held on Tuesday, 05 May 2026. PLEASE NOTE that all interested vendors MUST meet with Contracting personnel at the Air Base Visitor s Center located at 700 W Hill Blvd, Joint Base Charleston (JBC), SC 29404 no later than 8:40 AM EDT on Tuesday, 05 May. We will coordinate base access at the Visitor s Center first and then escort vendors to the site location at 200 E Simpson St, JBC, SC 29404. Prior to site visitation, the names and email addresses of all attendees must be submitted to Contract Specialist SrA Kuhl, carmen.kuhl@us.af.mil and nicholas.riccio.1@us.af.mil NLT 2:00 PM EDT on 04 May. The project consists of providing all plant, labor, material parts, and equipment necessary to replace standpipes and bases on the sewer lift station at building 509 on Joint Base Charleston Air Base, South Carolina. See all attachments for full details. The project requirements include, but are not limited to the following major items of work: Sewer Lift station Contractor Requirements: Set-up to perform OSHA Permitted Confined Space Entry (CSE). Plug manhole and install bypass pump while old equipment is being removed. Pull pump #1 and perform CSE to remove #1 guiderails, standpipe and base. Set new base, standpipe and reinstall existing guide rails using new guide rail brackets. Repeat process for other three standpipes. Once installed, all components will be tested for functionality to ensure normal operations. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number FA441826Q0056 is issued as a request for quotation (RFQ) for the repair of the sewer lift station located at Building 509 on Joint Base Charleston Air Base. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. This acquisition is 100% set-aside for Small Business concerns. The associated NAICS code is 237110 with a size standard of $45,000,000.00.
From Combined Synopsis/Solicitation posted on May 01, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA