FY26 Airfield Striping & Rubber Removal FA449726RStripingandRubberRemoval
Summary
AI-generated · Sep 28, 2025A 290,000-square-foot airfield pavement markings project is contemplated, consisting of repainting existing markings and adding new ones (225,000 SF reflective and 65,000 SF non-reflective). The contractor must provide layouts for all new markings, repaint all existing lines to the same width (typically 6 wide), and remove built-up or flaking markings as needed up to 10,000 SF. Rubber removal is included as part of the airfield pavement maintenance scope.
A sources-sought notice is issued to gauge industry capability and interest for a potential FY26 Striping & Rubber Removal contract at Dover AFB.
The 436th Contracting Squadron, Dover AFB, DE, is contemplating a FY26 Striping & Rubber Removal contract which consists of, but is not limited to: A. Repaint existing and paint new pavement markings for a maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective). B. Provide layouts for all new pavement markings. C. Repaint all existing lines to the same width (typically 6 wide). D. Remove built up and flaking markings as required up to a maximum of 10,000 SF.
From Sources Sought posted on Sep 24, 2025Notice history
1-
Sources Sought LATEST Posted Sep 24, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA