Contacts, documents and full notice history are available with a subscription.
Solicitation NONE Expired 1 notice 2 documents

FY25 Replace UPS Control/ COMM Shop 15B11125Q00000022

Solicitation 15B11125Q00000022 Copied Notice ID 2b99462ee4ae4c12aef625db3f8d12a8 Copied JUSTICE, DEPARTMENT OF — FCI MEMPHIS
SAM.gov
Posted
Aug 13, 2025
Deadline
Aug 27, 2025
Set-aside
NONE
NAICS
238210
PSC
J061

Summary

AI-generated · Aug 24, 2025

Removal of two existing Uninterruptible Power Systems and installation of two new UPS units to provide at least 90 minutes of backup for the Communication and Control Center at the Memphis facility. Contractor shall provide all labor, equipment, and materials, perform lockout/tagout to shut off main power, disconnect and remove the old UPS units, install 3-position switches on the load side to allow switching between UPS and utility power, and install safety disconnects on the line side for maintenance. Re-feed power to the existing panels in the Communication Room and Control Center.

Provide two UPS units (type 9355-30) and battery cabinets (type 9355-30, Part KA1512100000010) for the Communication and Control Center, with batteries delivering at least 90 minutes of backup per UPS. Specifications: two units, 9355-30, 208 VAC 3-phase input, 70 A; 208 VAC 3-phase output, 55 A; 30 kW configuration (KB2013100000110). See the attached SOW for full details; award will be made to a single responsible entity.

The Federal Bureau of Prisons (FBOP), Federal Correctional Institution, Memphis, TN, intends to make an award to single responsible entity for the removal and installation of two (2) Uninterruptible Power Systems capable of providing power for a minimum ninety (90) minute period for the Federal Correctional Institution located at 1101 John A. Denie Road, Memphis, TN. The contractor will provide labor, equipment and materials needed to complete the project. The contractor will complete the following: - Shut off the main power feeds to the existing electrical panels and utilize the Lock out Tag out procedures. - Disconnect the current power feeds from the two (2) old Uninterrupted Power Systems and remove them from service. - Install the 3- position switches on the load side of the UPS systems for ability to swap between the UPS and utility power source. - Install safety disconnects on the line side of the UPS systems to allow for maintenance and or replacement. - The contractor will provide two (2) Uninterrupted Power systems type 9355-30 for the Communication and Control Center. - The contractor will provide Battery cabinets type 9355-30 Part Number: KA1512100000010 for the Communication and Control Center. The battery should provide at least 90 minutes back up power for each UPS system. - The contractor will disconnect current power feeds from the two (2) Uninterrupted Power Systems and re-feed power sources to the existing panels in each area that the UPS provides protection for the Communication Room and Control Center. The Uninterrupted Power Systems specifications Qty (2) 9355-30 Model 20 AC IN: 208 VAC 4 W 50/60 HZ 3P 70 A AC OUT: 208 VAC 4 W 50/60 HZ 3P 55 A 30KW Configuration: KB2013100000110 PLEASE SEE THE ATTACHED SOW FOR FULL DETAILS.

From Solicitation posted on Aug 13, 2025

Notice history

1
  1. Solicitation LATEST Posted Aug 13, 2025 View

Details

Solicitation number 15B11125Q00000022
Notice ID 2b99462ee4ae4c12aef625db3f8d12a8
Notice type Solicitation
Product / Service (PSC) J061
NAICS 238210
Set-aside No Set aside used
Place of performance Memphis, Tennessee
Archive date Sep 11, 2025

Award Information

Not yet awarded

Contacts

primary
Manuel F. Rosario

Email

Phone

9013845457

secondary
Yourlanda Ghoston-Williams

Email

Phone

9013845457

Agency

JUSTICE, DEPARTMENT OF
FEDERAL PRISON SYSTEM / BUREAU OF PRISONS
FCI MEMPHIS

Place of Performance

Memphis, Tennessee 38134
USA

Dates

Posted Aug 13, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 27, 2025 11 months ago