FY25 PETALUMA RIVER AND ATF CHANNEL MAINTENANCE DREDGING W912P725BA005
Summary
AI-generated · Aug 24, 2025Maintenance dredging of the Petaluma River channel and ATF Channel in Sonoma County, California, to -8 ft MLLW with 1 ft of paid over-depth, and transportation of the dredged material to disposal sites. Material from Reaches 1–6 is suitable for disposal at a contractor-furnished upland beneficial reuse site, while material from Reaches 7–9 is suitable for disposal at the aquatic site SF-10.
The solicitation has undergone multiple amendments: the bid submission window has been extended, the wage determination has been updated to a newer version, and one amendment addresses a request for information. The overall scope and disposal requirements remain unchanged.
PROJECT TITLE: FY25 PETALUMA RIVER AND ATF CHANNEL MAINTENANCE DREDGING PROJECT, SONOMA COUNTY, CALIFORNIA PROJECT LOCATION: PETALUMA, CA THE WORK INCLUDES MAINTENANCE DREDGING OF THE PETALUMA RIVER CHANNEL TO -8-FT (MLLW) PLUS 1-FT OF PAID OVER-DEPTH AND TRANSPORTING OF THE DREDGED MATERIAL PER THE REQUIREMENTS IN SPECIFICATION SECTION 00 10 00 PRICING SCHEDULE AND 01 11 00 SUMMARY OF WORK. MATERIAL FROM REACHES 1 THROUGH 6 IS SUITABLE AND SHALL BE TAKEN FOR DISPOSAL AT A CONTRACTOR-FURNISHED UPLAND BENEFICIAL REUSE SITE. MATERIAL FROM REACHES 7 THROUGH 9 IS SUITABLE AND SHALL BE TAKEN FOR DISPOSAL AT THE AQUATIC SITE SF-10.
From Solicitation posted on Jul 02, 2025AMENDMENT 00001 THIS AMENDMENT IS TO EXTEND THE CLOSING DATE TO AUGUST 1, 2025@11:00AM. ALL SUBMISSIONS MAY BE UP TO 6 CALENDAR DAYS PRIOR TO BID OPENING. THIS ALLOWS A SUBMISSION WINDOW FROM SATURDAY, JULY 26TH AT 11:00 AM PST UNTIL 11:00 AM PST ON FRIDAY, AUGUST1ST. EARLY AND LATE SUBMISSIONS OUTSIDE OF THIS WINDOW WILL NOT BE ACCEPTED. PLEASE REFER TO SECTION 00 22 00; 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID: ************************************************************************************************************ PROJECT TITLE: FY25 PETALUMA RIVER AND ATF CHANNEL MAINTENANCE DREDGING PROJECT, SONOMA COUNTY, CALIFORNIA PROJECT LOCATION: PETALUMA, CA THE WORK INCLUDES MAINTENANCE DREDGING OF THE PETALUMA RIVER CHANNEL TO -8-FT (MLLW) PLUS 1-FT OF PAID OVER-DEPTH AND TRANSPORTING OF THE DREDGED MATERIAL PER THE REQUIREMENTS IN SPECIFICATION SECTION 00 10 00 PRICING SCHEDULE AND 01 11 00 SUMMARY OF WORK. MATERIAL FROM REACHES 1 THROUGH 6 IS SUITABLE AND SHALL BE TAKEN FOR DISPOSAL AT A CONTRACTOR-FURNISHED UPLAND BENEFICIAL REUSE SITE. MATERIAL FROM REACHES 7 THROUGH 9 IS SUITABLE AND SHALL BE TAKEN FOR DISPOSAL AT THE AQUATIC SITE SF-10.
From Solicitation posted on Jul 21, 2025AMENDMENT 00002 THIS AMENDMENT IS TO EXTEND THE CLOSING DATE TO AUGUST 8, 2025@11:00AM. ALL SUBMISSIONS MAY BE UP TO 6 CALENDAR DAYS PRIOR TO BID OPENING. THIS ALLOWS A SUBMISSION WINDOW FROM SATURDAY, AUGUST 2ND@11:00 AM PST UNTIL 11:00 AM PST ON FRIDAY, AUGUST 8TH. EARLY AND LATE SUBMISSIONS OUTSIDE OF THIS WINDOW WILL NOT BE ACCEPTED. PLEASE REFER TO SECTION 00 22 00; 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID. ************************************************************************************************************************************************** AMENDMENT 00001 THIS AMENDMENT IS TO EXTEND THE CLOSING DATE TO AUGUST 1, 2025@11:00AM. ALL SUBMISSIONS MAY BE UP TO 6 CALENDAR DAYS PRIOR TO BID OPENING. THIS ALLOWS A SUBMISSION WINDOW FROM SATURDAY, JULY 26TH AT 11:00 AM PST UNTIL 11:00 AM PST ON FRIDAY, AUGUST1ST. EARLY AND LATE SUBMISSIONS OUTSIDE OF THIS WINDOW WILL NOT BE ACCEPTED. PLEASE REFER TO SECTION 00 22 00; 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID: ************************************************************************************************************ PROJECT TITLE: FY25 PETALUMA RIVER AND ATF CHANNEL MAINTENANCE DREDGING PROJECT, SONOMA COUNTY, CALIFORNIA PROJECT LOCATION: PETALUMA, CA THE WORK INCLUDES MAINTENANCE DREDGING OF THE PETALUMA RIVER CHANNEL TO -8-FT (MLLW) PLUS 1-FT OF PAID OVER-DEPTH AND TRANSPORTING OF THE DREDGED MATERIAL PER THE REQUIREMENTS IN SPECIFICATION SECTION 00 10 00 PRICING SCHEDULE AND 01 11 00 SUMMARY OF WORK. MATERIAL FROM REACHES 1 THROUGH 6 IS SUITABLE AND SHALL BE TAKEN FOR DISPOSAL AT A CONTRACTOR-FURNISHED UPLAND BENEFICIAL REUSE SITE. MATERIAL FROM REACHES 7 THROUGH 9 IS SUITABLE AND SHALL BE TAKEN FOR DISPOSAL AT THE AQUATIC SITE SF-10.
From Solicitation posted on Jul 25, 2025AMENDMENT 0003 THIS AMENDMENT UPDATES THE WAGE DETERMINATION FROM CA20250007 DATED 6-27-2025 TO CA20250007 DATED 7-18-2025. ****************************************************************************************************************************************************** AMENDMENT 0002 THIS AMENDMENT IS TO EXTEND THE CLOSING DATE TO AUGUST 8, 2025@11:00AM. ALL SUBMISSIONS MAY BE UP TO 6 CALENDAR DAYS PRIOR TO BID OPENING. THIS ALLOWS A SUBMISSION WINDOW FROM SATURDAY, AUGUST 2ND@11:00 AM PST UNTIL 11:00 AM PST ON FRIDAY, AUGUST 8TH. EARLY AND LATE SUBMISSIONS OUTSIDE OF THIS WINDOW WILL NOT BE ACCEPTED. PLEASE REFER TO SECTION 00 22 00; 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID. ************************************************************************************************************************************************** AMENDMENT 0001 THIS AMENDMENT IS TO EXTEND THE CLOSING DATE TO AUGUST 1, 2025@11:00AM. ALL SUBMISSIONS MAY BE UP TO 6 CALENDAR DAYS PRIOR TO BID OPENING. THIS ALLOWS A SUBMISSION WINDOW FROM SATURDAY, JULY 26TH AT 11:00 AM PST UNTIL 11:00 AM PST ON FRIDAY, AUGUST1ST. EARLY AND LATE SUBMISSIONS OUTSIDE OF THIS WINDOW WILL NOT BE ACCEPTED. PLEASE REFER TO SECTION 00 22 00; 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID: *************************************************************************************************************************************************** PROJECT TITLE: FY25 PETALUMA RIVER AND ATF CHANNEL MAINTENANCE DREDGING PROJECT, SONOMA COUNTY, CALIFORNIA PROJECT LOCATION: PETALUMA, CA THE WORK INCLUDES MAINTENANCE DREDGING OF THE PETALUMA RIVER CHANNEL TO -8-FT (MLLW) PLUS 1-FT OF PAID OVER-DEPTH AND TRANSPORTING OF THE DREDGED MATERIAL PER THE REQUIREMENTS IN SPECIFICATION SECTION 00 10 00 PRICING SCHEDULE AND 01 11 00 SUMMARY OF WORK. MATERIAL FROM REACHES 1 THROUGH 6 IS SUITABLE AND SHALL BE TAKEN FOR DISPOSAL AT A CONTRACTOR-FURNISHED UPLAND BENEFICIAL REUSE SITE. MATERIAL FROM REACHES 7 THROUGH 9 IS SUITABLE AND SHALL BE TAKEN FOR DISPOSAL AT THE AQUATIC SITE SF-10.
From Solicitation posted on Jul 29, 2025ABSTRACT OF OFFERES UPLOADED ************************************************************************************************************************************************** AMENDMENT 0004 THE PURPOSE OF THIS AMENDMENT IS TO RESPOND TO THE REQUEST FOR INFORMATION (RFI). ****************************************************************************************************************************************************** AMENDMENT 0003 THIS AMENDMENT UPDATES THE WAGE DETERMINATION FROM CA20250007 DATED 6-27-2025 TO CA20250007 DATED 7-18-2025. ****************************************************************************************************************************************************** AMENDMENT 0002 THIS AMENDMENT IS TO EXTEND THE CLOSING DATE TO AUGUST 8, 2025@11:00AM. ALL SUBMISSIONS MAY BE UP TO 6 CALENDAR DAYS PRIOR TO BID OPENING. THIS ALLOWS A SUBMISSION WINDOW FROM SATURDAY, AUGUST 2ND@11:00 AM PST UNTIL 11:00 AM PST ON FRIDAY, AUGUST 8TH. EARLY AND LATE SUBMISSIONS OUTSIDE OF THIS WINDOW WILL NOT BE ACCEPTED. PLEASE REFER TO SECTION 00 22 00; 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID. ************************************************************************************************************************************************** AMENDMENT 0001 THIS AMENDMENT IS TO EXTEND THE CLOSING DATE TO AUGUST 1, 2025@11:00AM. ALL SUBMISSIONS MAY BE UP TO 6 CALENDAR DAYS PRIOR TO BID OPENING. THIS ALLOWS A SUBMISSION WINDOW FROM SATURDAY, JULY 26TH AT 11:00 AM PST UNTIL 11:00 AM PST ON FRIDAY, AUGUST1ST. EARLY AND LATE SUBMISSIONS OUTSIDE OF THIS WINDOW WILL NOT BE ACCEPTED. PLEASE REFER TO SECTION 00 22 00; 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID: *************************************************************************************************************************************************** PROJECT TITLE: FY25 PETALUMA RIVER AND ATF CHANNEL MAINTENANCE DREDGING PROJECT, SONOMA COUNTY, CALIFORNIA PROJECT LOCATION: PETALUMA, CA THE WORK INCLUDES MAINTENANCE DREDGING OF THE PETALUMA RIVER CHANNEL TO -8-FT (MLLW) PLUS 1-FT OF PAID OVER-DEPTH AND TRANSPORTING OF THE DREDGED MATERIAL PER THE REQUIREMENTS IN SPECIFICATION SECTION 00 10 00 PRICING SCHEDULE AND 01 11 00 SUMMARY OF WORK. MATERIAL FROM REACHES 1 THROUGH 6 IS SUITABLE AND SHALL BE TAKEN FOR DISPOSAL AT A CONTRACTOR-FURNISHED UPLAND BENEFICIAL REUSE SITE. MATERIAL FROM REACHES 7 THROUGH 9 IS SUITABLE AND SHALL BE TAKEN FOR DISPOSAL AT THE AQUATIC SITE SF-10.
From Solicitation posted on Aug 11, 2025Notice history
5-
-
Solicitation Posted Jul 21, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 31, 2025 → Aug 01, 2025
-
Solicitation Posted Jul 25, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 01, 2025 → Aug 08, 2025
Details
Award Information
Not yet awarded