FY25 Joint Base Lewis McChord Multi Domain Task Force Buildings 3221-3222 W912DW25R0002
Summary
AI-generated · Aug 24, 2025Convert two existing barracks (Buildings 3221 and 3222) at JBLM into operational facilities for a three-tier command structure of the MDTF. The Hammer Heads are single-story; the Hammer Handles have three floors with a crawl space. The basement houses a main utility/mechanical and electrical room that extends under both buildings. Demolition includes hazardous material abatement largely in the crawl space, about 75% removal of the exterior envelope and interior walls, about 90% removal of mechanical/electrical systems, and removal of the existing EPDM roof (roof framing to remain). New work calls for a new exterior envelope, limited mechanical/electrical systems, and a new TPO roof system. Site coordination involves new utility connections largely by others and shared construction boundaries with adjacent projects.
Amendments have updated bidding information: R0001 revised the Bid Key to 6PR99N-E25ZZU in section 002100, and R0002 through R0006 consist of attached amendments to the solicitation.
General work will convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle. The definitive removal / demolition work items for each building will require: - Hazardous material / debris abatement and removal mostly within the crawl space - Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc, - Removal at ~ 90% removal of building mechanical – electrical systems - Removal of the existing roof EPDM system (but not the roof framing structure) The definitive repair / new work items for each building will require: - New exterior envelope - New building mechanical – electrical systems - New roof TPO system Other considerations for site work coordination - New utility connections (mostly by other entities) - Shared construction boundaries with adjacent current and future projects
From Presolicitation posted on Jun 10, 2025General work will convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as ?the Hammer Heads?. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical and electrical room extends partially under both the Hammer Head and the Hammer Handle.The definitive removal / demolition work items for each building will require: Hazardous material / debris abatement and removal mostly within the crawl space, Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc, Removal at ~ 90% removal of building mechanical ? electrical systems, Removal of the existing roof EPDM system (but not the roof framing structure)The definitive repair / new work items for each building will require: New exterior envelope, few building mechanical ? electrical systems, New roof TPO system Other considerations for site work coordination, New utility connections (mostly by other entities), and Shared construction boundaries with adjacent current and future projects.
From Solicitation posted on Jun 30, 2025Amendment R0001-Revised Bid Key to 6PR99N-E25ZZU in section 002100.
From Solicitation posted on Jul 09, 2025Amendment R0002- Please see attached amendment.
From Solicitation posted on Jul 15, 2025Amendment R0003- Please see attached amendment.
From Solicitation posted on Jul 25, 2025Amendment R0004- Please see attached amendment.
From Solicitation posted on Aug 04, 2025Amendment R0005- Please see attached amendment.
From Solicitation posted on Aug 12, 2025Amendment R0006- Please see attached amendment.
From Solicitation posted on Aug 20, 2025Notice history
8-
Presolicitation Posted Jun 10, 2025
-
Solicitation Posted Jun 30, 2025View changes (5)
- Title: FY25 Joint Base Lewis McChord Multi Domain Task Force Buildings 3221-3222 → FY25 JBLM MDTF BLDGs 3221 AND 3222
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Jun 25, 2025 → Jul 30, 2025
- Set-Aside: Total Small Business Set-Aside (FAR 19.5) → None
-
Solicitation Posted Jul 15, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 30, 2025 → Aug 06, 2025
-
Solicitation Posted Aug 04, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 06, 2025 → Aug 26, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA