Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 1 notice 11 documents

FY25 GAOA HORSESHOE CREEK TRAIL BRIDGE INSTALL. 1240LU25Q0013

Solicitation 1240LU25Q0013 Copied Notice ID 0257b1de4b554a08b256910d7f4a90d7 Copied AGRICULTURE, DEPARTMENT OF — CUSTER GALLATIN NATIONAL FOREST
SAM.gov
Posted
Jun 24, 2025
Deadline
Jun 30, 2025
Set-aside
SBA
NAICS
237310
PSC
Y1LB

Summary

AI-generated · Aug 23, 2025

Install a trail bridge at Horseshoe Creek as part of FY25 GAOA. The provided record contains no description of the scope, deliverables, schedule, site conditions, or special requirements; interested bidders should review the full solicitation package to learn the exact requirements, including scope of work, acceptance criteria, safety and permitting considerations, and contract terms.

The scope of this project is to deliver the bridge items needed to install a new trail bridge, Horseshoe Creek, on the Custer Gallatin National Forest on the Beartooth Ranger District. BASE ITEMS: Contractor shall provide both sills and all (20) diaphragms, (See attached drawings for dimensions), remove and dispose of the old existing sills, and install the stringers, sills, diaphragms and all fasteners for these items. This contract includes delivering other Government furnished material to bridge location, which includes stringers, decking, curb, wearing surface material, and other applicable hardware. The Government will provide all material except Sills and Diaphragms. Government furnished material will be available at the Meyers Creek Administration site upon request. OPTION ITEMS: Option items will be for complete bridge installation to be able to open the bridge up to the public. These optional items include deck, curb, running planks, and applicable hardware installation, approach work, and new trail construction to tie the trail into the new bridge approaches. Approach grades shall be no steeper than 30%. Approach work does include gabion basket installation on the North approach. Gabion baskets are available onsite to aid in approach construction and minimize embankment. Gabion baskets not used in the approach work shall be returned to Meyers Creek Site.

From Solicitation posted on Jun 24, 2025

Notice history

1
  1. Solicitation LATEST Posted Jun 24, 2025 View

Details

Solicitation number 1240LU25Q0013
Notice ID 0257b1de4b554a08b256910d7f4a90d7
Notice type Solicitation
Product / Service (PSC) Y1LB
NAICS 237310
Place of performance Montana
Archive date Jun 30, 2025

Award Information

Not yet awarded

Contacts

primary
Paula Sales

Email

secondary
John Curry

Email

Phone

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
CUSTER GALLATIN NATIONAL FOREST

Place of Performance

Montana 59771
USA

Dates

Posted Jun 24, 2025 1 year ago
Last Updated Aug 05, 2026 2 days ago
Due Jun 30, 2025 1 year ago