AI-generated · Aug 24, 2025Maintenance dredging of about 2,044,000 cubic yards from the deep-draft federal navigation channel serving the Port of Baltimore and portions of the Cape Henry Channel, dredged to a depth of 50 feet MLLW with up to 1 foot of overdepth. Work is to be performed by a hopper dredge, with all dredged material transported to and placed in the government-furnished Dam Neck Ocean Disposal Site, and completed in roughly 150 calendar days from Notice-to-Proceed. The work occurs in heavy commercial waterways and has an estimated value of $20–$25 million.
Current solicitation includes a site visit on July 9, 2025; proposal due July 30, 2025; and a Request for Information cut-off July 11, 2025. Amendment 0001, published July 23, 2025, revises clauses and adds documentation. A prior presolicitation noted the same scope and a planned release around June 27, 2025. A Special Notice references an attached Abstract of Bids.
This solicitation is expected to be released on/about 27 June 2025. The project consists of maintenance dredging approximately 2,044,000 cubic yards (cy) from the deep-draft federal navigation channel serving the Port of Baltimore. The work is to be performed between November 2025 through March 2026. The project consists of dredging portions of the Cape Henry Federal Navigation Channel. The work consists of maintenance dredging to a required depth of 50-foot MLLW with one foot of allowable overdepth. Approximately 2,044,000 cy of material will be dredged including overdepth. Work shall be performed by a hopper dredge with all dredged material transported and placed in the designated Government-furnished placement area at Dam Neck Ocean Disposal Site. The estimated magnitude of construction is $20M-$25M. The work areas are within heavy commercial waterways supporting the Port of Baltimore. Large hopper dredges are required to remove the dredged material from the channel and haul the material to the placement site. The material will be dredged by hopper and placed within a period of performance of approximately 150 calendar days from receipt of Notice-to-Proceed.
From Presolicitation posted on Jun 11, 2025The project consists of maintenance dredging approximately 2,044,000 cubic yards (cy) from the deep-draft federal navigation channel serving the Port of Baltimore. The work is to be performed between November 2025 through March 2026. The project consists of dredging portions of the Cape Henry Federal Navigation Channel. The work consists of maintenance dredging to a required depth of 50-foot MLLW with one foot of allowable overdepth. Approximately 2,044,000 cy of material will be dredged including overdepth. Work shall be performed by a hopper dredge with all dredged material transported and placed in the designated Government-furnished placement area at Dam Neck Ocean Disposal Site. The estimated magnitude of construction is $20M-$25M. The work areas are within heavy commercial waterways supporting the Port of Baltimore. Large hopper dredges are required to remove the dredged material from the channel and haul the material to the placement site. The material will be dredged by hopper and placed within a period of performance of approximately 150 calendar days from receipt of Notice-to-Proceed. *****Project Solicitation issued on 27 June 2025 with a proposal due date of 30 July 2025. Site Visit scheduled for 09 July 2025. RFI Cut-off date is 11 July 2025.
From Solicitation posted on Jun 27, 2025The project consists of maintenance dredging approximately 2,044,000 cubic yards (cy) from the deep-draft federal navigation channel serving the Port of Baltimore. The work is to be performed between November 2025 through March 2026. The project consists of dredging portions of the Cape Henry Federal Navigation Channel. The work consists of maintenance dredging to a required depth of 50-foot MLLW with one foot of allowable overdepth. Approximately 2,044,000 cy of material will be dredged including overdepth. Work shall be performed by a hopper dredge with all dredged material transported and placed in the designated Government-furnished placement area at Dam Neck Ocean Disposal Site. The estimated magnitude of construction is $20M-$25M. The work areas are within heavy commercial waterways supporting the Port of Baltimore. Large hopper dredges are required to remove the dredged material from the channel and haul the material to the placement site. The material will be dredged by hopper and placed within a period of performance of approximately 150 calendar days from receipt of Notice-to-Proceed. *****Project Solicitation issued on 27 June 2025 with a proposal due date of 30 July 2025. Site Visit scheduled for 09 July 2025. RFI Cut-off date is 11 July 2025.***Amendment 0001 published on 23 July 2025 in order to provide clauses revisions and additional documentation.*****
From Solicitation posted on Jul 23, 2025ATTACHED IS THE ABSTRACT OF BIDS ******************************************************************
From Special Notice posted on Jul 30, 2025Notice history
4-
Presolicitation Posted Jun 11, 2025
-
Solicitation Posted Jun 27, 2025View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Jun 27, 2025 → Jul 30, 2025
-
Special Notice LATEST Posted Jul 30, 2025View changes (2)
- Description: Description was updated
- Notice Type: Solicitation → Special Notice