FY 26 Dorm Washers & Dryers Minot AFB FA4528-26-Q-SP01
Summary
AI-generated · Apr 17, 2026Remove and replace 84 double-stack washer and dryer units (42 in Building 214 and 42 in Building 216) in the common areas, with each replacement including new water hoses, drain lines, and dryer venting from the appliance to the wall connection point. An optional CLIN covers the same scope of work for the removal and replacement of 36 washers and dryers in the common areas.
Additionally, replace 18 side-by-side (non-stackable) washers and dryers in Building 205 and 18 in Building 207.
The removal and replacement of 84 double stack washer & dryers All replacements shall include new water hoses, drain lines, and dryer venting from the appliance to the wall connection point in the common areas for Buildings 214 & 216. Requirement calls for the removal and replacement of: - 42 double stack washers and dryers for Building 214 - 42 double stack washers and dryers for Building 216 OPTIONAL WASHER AND DRYER CLIN: To perform all work required same as above CLIN for the removal and replacement of 36 washer & dryers in the common areas. -18 side-by-side (non-stackable) washers and dryers for Building 205 -18 side-by-side (non-stackable) washers and dryers for Building 207
From Combined Synopsis/Solicitation posted on Apr 16, 2026The removal and replacement of 84 double stack washer & dryers All replacements shall include new water hoses, drain lines, and dryer venting from the appliance to the wall connection point in the common areas for Buildings 214 & 216. Requirement calls for the removal and replacement of: - 42 double stack washers and dryers for Building 214 - 42 double stack washers and dryers for Building 216 OPTIONAL WASHER AND DRYER CLIN: To perform all work required same as above CLIN for the removal and replacement of 36 washer & dryers in the common areas. -18 side-by-side (non-stackable) washers and dryers for Building 205 -18 side-by-side (non-stackable) washers and dryers for Building 207
From Combined Synopsis/Solicitation posted on Apr 20, 2026Notice history
2-
Combined Synopsis/Solicitation Posted Apr 16, 2026
-
Combined Synopsis/Solicitation LATEST Posted Apr 20, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA