FY 25 Wax Plant Electrical Upgrades , B3566 W912PL25RA0150001
Summary
AI-generated · Aug 24, 2025Design-build project to complete design drawings from 65% to 100% and supply all materials and labor to install three Wax Mixing, Melting, and Pouring Systems (WMMPS) and two conditioning chambers at Building 3566, Yuma Proving Grounds. The WMMPS and chambers are primarily configured to support wax loading of projectile and mortar bodies.
Replace steam injection with electric resistive heating to directly heat the wax equipment; remove and dispose of the current wax equipment, fuel tank, steam generators, and all associated piping. The contractor will increase the facility’s electrical service capacity to support the higher power demand.
Design Build construction project to complete D-B drawings from 65% to 100% and furnish all materials and labor necessary to install three (3) Wax Mixing, Melting, and Pouring Systems (WMMPS) and two (2) conditioning chambers at Building 3566, Yuma Proving Grounds (YPG). The WMMPS and chambers will be configured primarily to support wax loading of projectile and mortar bodies. The new equipment will replace steam injection with electric resistive heating to directly heat the wax equipment. The current wax equipment, fuel tank, steam generators, and all associated piping shall be removed and disposed. The contractor will increase the available power to accommodate increased demands for electrical service inside of the facility
From Special Notice posted on Jul 17, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance