AI-generated · Aug 26, 2025Upgrade Missile Field 2 silo interface vault power by installing Automatic Transfer Switches and Main Lug Only distribution panels with Molded Case Circuit Breakers to provide electrical power redundancy. Physically separate SUS A and SUS B switchgear, add enhanced coordination and protection, and convert the configuration from Main-Tie-Main to Main Tie-Tie-Main. Extend the Power Control and Monitoring System (PCMS) and the Power Quality Monitoring System (PQMS) to Missile Field 2.
To obtain a copy of the solicitation and amendments, contact the named program points of contact (email addresses provided in the notice).
This is a Request for Proposal (RFP) for a standalone 8(a) competitive contract. The purpose of the project is to provide electrical power redundancy to the Missile Field 2 silo interface vaults by adding Automatic Transfer Switches and Main Lug Only distribution panels with Molded Case Circuit Breakers. The SUS A and B switchgear will be physically separated, have enhanced coordination/protection features incorporated, and will be converted from a Main-Tie-Main to a Main Tie-Tie-Main configuration. Additionally, the Power Control and Monitoring System (PCMS) and Power Quality Monitoring System (PQMS) will be extended to Missile Field 2.TO RECEIVE A COPY OF THE SOLICITATION AND AMENDMENTS PLEASE EMAIL BRITTNEY MORRISON AT BRITTNEY.MORRISON@USACE.ARMY.MIL AND MICHELLE NELSEN AT MICHELLE.NELSEN@USACE.ARMY.MIL
From Solicitation posted on Jul 14, 2025Notice history
1-
Solicitation LATEST Posted Jul 14, 2025
Details
Award Information
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| N/A | N/A | N/A |
Documents
8Contacts
Phone
Phone