AI-generated · Jun 17, 2026Construct a standard Design Flight Control Tower for the FCKY project at Fort Campbell, KY, through a single-phase Evaluation Board RFP. The primary facility includes the tower cab and related spaces on the first floor and the vertical shaft, plus administrative offices, server room, storage, restrooms with showers, locker rooms, training and conference rooms, break room, ready room, janitor spaces, and support spaces, along with the Army Radar Approach Control functional space and associated mechanical, electrical, and equipment rooms. The project requires special foundations, backup power generation and an uninterruptible power supply, and will include Fire Life Safety, Building Control Systems, and Electronic Security Systems, with an EMCS connection provided if applicable, and accessible design up to the tenth floor.
Fort Campbell-designated critical asset status necessitates additional antiterrorism measures beyond the minimum DoD UFC 4-010-01 requirements, with the related costs included in the Building Antiterrorism Measures line item. Supporting facilities include paving, walks, parking, lighting, and site improvements, along with comprehensive interior design and furnishings. Heating and air conditioning will be provided by a self-contained system, and the facility is designed for a minimum 40-year life under UFC 1-200-02 energy criteria.
The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (Single Phase Evaluation Board RFP) for the FCKY Air Traffic Control Tower (ATCT), located in Fort Campbell, KY. Construct a standard Design Flight Control Tower. The Primary Facility (Air Traffic/Flight Control Tower) includes spaces on the first floor and throughout the functional vertical shaft space for equipment maintenance, open and closed administrative offices, administrative support spaces, passenger elevator, a server room, storage, bathrooms with showers, locker rooms, training and conference rooms, a ready room, janitors closets, break room, control tower cab, Army Radar Approach Control functional space, mechanical, electrical and equipment rooms. Project includes special foundations, backup power generation and an uninterruptable power supply. Fire Life Safety (FLS) systems, Building Control Systems (BCS), and Electronic Security Systems (ESS) are included. Energy Monitoring and Control Systems (EMCS) connection will be provided if applicable. Access for individuals with disabilities will be provided up to the tenth floor. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided and costs are included in the building unit cost. Fort Campbell has designated this facility as a critical asset and requested additional antiterrorism measures over the minimum required by UFC 4-010-01 be included. The cost for the additional measures is included in the Building Antiterrorism Measures line item. Supporting facilities include paving, walks, parking, lighting, and site improvements. Comprehensive interior design and furnishings are required. Heating and air conditioning will be provided by a self-contained system. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy.
From Presolicitation posted on Jun 16, 2026The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (Single Phase Evaluation Board RFP) for the FCKY Air Traffic Control Tower (ATCT), located in Fort Campbell, KY. Construct a standard Design Flight Control Tower. The Primary Facility (Air Traffic/Flight Control Tower) includes spaces on the first floor and throughout the functional vertical shaft space for equipment maintenance, open and closed administrative offices, administrative support spaces, passenger elevator, a server room, storage, bathrooms with showers, locker rooms, training and conference rooms, a ready room, janitors closets, break room, control tower cab, Army Radar Approach Control functional space, mechanical, electrical and equipment rooms. Project includes special foundations, backup power generation and an uninterruptable power supply. Fire Life Safety (FLS) systems, Building Control Systems (BCS), and Electronic Security Systems (ESS) are included. Energy Monitoring and Control Systems (EMCS) connection will be provided if applicable. Access for individuals with disabilities will be provided up to the tenth floor. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided and costs are included in the building unit cost. Fort Campbell has designated this facility as a critical asset and requested additional antiterrorism measures over the minimum required by UFC 4-010-01 be included. The cost for the additional measures is included in the Building Antiterrorism Measures line item. Supporting facilities include paving, walks, parking, lighting, and site improvements. Comprehensive interior design and furnishings are required. Heating and air conditioning will be provided by a self-contained system. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy.
From Presolicitation posted on Jun 23, 2026Notice history
2-
-
Presolicitation LATEST Posted Jun 23, 2026No changes from previous notice