Ft Leavenworth Bldg. 45 Porches & Brick Renovation W91QF425BA013
Summary
AI-generated · Aug 24, 2025Furnish all supervision, management, personnel, labor, equipment, transportation, supplies, and any other items necessary to complete renovations of Fort Leavenworth Building 45 porches and surrounding brickwork in strict accordance with the plans and specifications. Work includes removing the north three-story porches except the far northwest porches; repairing and painting the wood porch structures and railings and replacing the roof on the northwest porches; replacing some wood structure and trim on the south porches; replacing downspouts and eaves around the building; and tuckpointing and replacing historic brick around the building.
Brick work involves replacing approximately 176 historic true 8-inch-long bricks around the building (mostly on Floor 1, with a few on Floor 2), and replacing about 7,000 historic bricks (roughly 1,000 SF) in the center of Floor 3 from above the floor line to the roof. Additional tasks include tuckpointing about 280 SF of brick joints, cutting in two new brick expansion joints in the Floor 1 south brick arcade adjacent to the center south brick section, and sealing two full-height brick cracks in two columns on the Floor 1 south arcade. See attached SOW for more information.
The contractor shall provide all supervision, management, personnel, labor, equipment, transportation, supplies, and any other items necessary to complete The work consists of furnishing all plant, labor, equipment, and materials to perform all work in strict accordance with the plans and specification to a) Remove north three story porches except the far northwest porches, b) repair and paint wood porch structure and railings and replace the roof on the northwest porches, c) replace some wood structure and trim on the south porches, d) replace downspouts and eaves around the building, and e) tuckpoint and replace historic 8 brick around the building. Brick Replacement and Repair Replace approximately 176 historic (true 8 long) brick units around the building, virtually all on Floor 1 level with a few on Floor 2, replace approximately 7,000 historic brick units (1,000 SF) in the center of Floor 3 virtually all above the floor line to the roof. Tuckpoint approximately 280 SF of brick joints around the building. Cut-in two (2) new brick expansion joints in the Floor 1 south brick arcade immediately adjacent to the center south brick section without porches. Route out and seal two (2) full height brick cracks in two columns on the Floor 1 south arcade. See attached SOW for more information.
From Solicitation posted on Aug 18, 2025Notice history
1-
Solicitation LATEST Posted Aug 18, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA