FSR 589A Culvert Replacement 127EAX25R0009
Summary
AI-generated · Aug 25, 2025Replace two reinforced concrete pipe culverts with aluminum arch culverts measuring 141 wide x 86 high x 31 6 long, including prefabricated headwalls and wingwalls, for the crossing tributaries of Horsepen Crk. The project encompasses the accompanying road work and site improvements.
Includes embankment construction, stream restoration, signage installation, road grading, and aggregate surface placement; demolition and removal of the existing structures; road reconstruction to fit the new culverts; scour protection; and construction of the culverts and other road appurtenances and improvements as shown in the plans.
The scope of the project is to construct the replacement of two reinforced concrete pipe culverts with 141 wide x 86 high x 31 6 long aluminum arch culverts with prefabricated headwalls and wingwalls for the crossing tributaries of Horsepen Crk. Also included in this work is the road work incidental to these culvert installations including embankment construction, stream restoration, signage installation, road grading, and aggregate surface placement, demolition and removal of the existing structures, road reconstruction to fit the new structure, scour protection, and the construction of the culverts and other road appurtenances and improvements as shown in the plans.
From Presolicitation posted on Jul 10, 2025The scope of the project is to construct the replacement of two reinforced concrete pipe culverts with 141 wide x 86 high x 31 6 long aluminum arch culverts with prefabricated headwalls and wingwalls for the crossing tributaries of Horsepen Crk. Also included in this work is the road work incidental to these culvert installations including embankment construction, stream restoration, signage installation, road grading, and aggregate surface placement, demolition and removal of the existing structures, road reconstruction to fit the new structure, scour protection, and the construction of the culverts and other road appurtenances and improvements as shown in the plans.
From Solicitation posted on Aug 29, 2025The scope of the project is to construct the replacement of two reinforced concrete pipe culverts with 141 wide x 86 high x 31 6 long aluminum arch culverts with prefabricated headwalls and wingwalls for the crossing tributaries of Horsepen Crk. Also included in this work is the road work incidental to these culvert installations including embankment construction, stream restoration, signage installation, road grading, and aggregate surface placement, demolition and removal of the existing structures, road reconstruction to fit the new structure, scour protection, and the construction of the culverts and other road appurtenances and improvements as shown in the plans.
From Solicitation posted on Feb 25, 2026Notice history
3-
Presolicitation Posted Jul 10, 2025
-
Solicitation Posted Aug 29, 2025View changes (2)
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Jul 24, 2025 → Sep 25, 2025
-
Solicitation LATEST Posted Feb 25, 2026View changes (1)
- Response Deadline: Sep 25, 2025 → Feb 25, 2026