Fort Peck Powerhouse 1 Cubicle Room 15kV Switchgear Replacement Project W9128F25RA008
Summary
AI-generated · Aug 23, 2025Replace the Fort Peck Powerhouse 1 Cubicle Room 15kV switchgear by removing 10 breaker cubicles and associated buswork and substituting them with 5 new breakers in the cubicle rooms plus 6 outdoor breakers in the switchyard. The complete 15 kV system includes metal-clad switchgear and breakers with instrumentation transformers, 3 generator breakers and 2 tie breakers with bus work, outdoor breakers with instrumentation transformers, disconnect switches, and interconnecting aluminum bus; plus power, protection, control, and annunciation cabling to the control room, and modifications to control boards, metering, and control switches. Revisions to protective relaying and synchronization, 15 kV bus differential protection, a new 15 kV, 4000 A cable bus linking the cubicle room to the new switchyard breakers, and new feeders from those breakers to transformers KX5A, KV7A, KZ2A, KY4A and the new reactors (with KV7A feeder requiring an underground air-rated tray). The scope also covers two new 15 kV, 12 MVA reactor banks connected to outdoor switchgear for MVAR support, replacement of cable trays in the tunnel, in-kind replacement of lighting distribution panelboards and dry-type switchyard transformers, installation of warning lights at the cubicle room entrances, and an evaluation of the cubicle room lighting.
Amendments and site-visit updates have been issued, with related documents attached. A follow-on site visit is planned and bidders must reserve through the designated contact; a contractor sign-in sheet has been posted, and the proposal due date has been updated in the latest amendment. The outage window is tight due to the plant’s role in supporting the western power grid. Review attachments for full requirements and site-visit instructions.
UPDATED: On or about 7 July 2025, the U.S. Army Corps of Engineers, Omaha District intends to issue a Request for Proposal (RFP) solicitation for Fort Peck Powerhouse 1 Cubicle Room 15kV Switchgear Upgrade . DESCRIPTION OF WORK: The Fort Peck power plant has a series of 15kV class breakers that act as the generator breakers connecting the 3 generators in powerhouse 1 to the eastern and western power grids. Even through the breakers operate at 13.8kV their unique configuration requires switching orders from the transmission authority. Under the scope of this sources sought the 10 breaker cubicles and all associated buswork and equipment would be removed and replaced. This equipment will be replaced with 5 new breakers in the cubical rooms with associated equipment housed in additional cubicles. An additional 6 outdoor rated breakers will be installed in the switchyard. It is noted that the outage of the cubical room will be under tight time constraints given the support the power plant provides to the western power grid. The complete 15 kV switchgear system will include: Metal-clad 15kV switchgear and breakers with instrumentation transformers (current and rack-out potential transformers). This includes 3 generator breakers and 2 tie breakers with associated bus work. 15kV outdoor circuit breakers with instrumentation transformers, 15kV disconnect switches and interconnecting 15kV aluminum bus system. Power, protection, control, and annunciation cabling between switchgear and control room. Control board modifications of the mimic bus, metering equipment and control switches. Revisions to existing protective relaying and synchronization scheme. 15kV Bus differential protection. New 15kV, 4000A cable bus to connect the 15kV switchgear in Cubicle Room to the new 15kV breakers in the switchyard. New feeders from the new 15kV breakers in the switchyard to transformers KX5A, KV7A, KZ2A, KY4A and the new reactors. The KV7A feeder is required to be installed in a 15kV air rated underground tray system. The scope will also include the installation of two new 15kV, 12MVA reactors banks. These banks will be connected to outdoor 15kV switchgear. They will be providing MVAR support to the transmission systems off the tertiary of the 115kV/230kV KV7A Autotransformer. Additionally, the scope incudes the replacement of the cable trays in the cable tunnel, the replacement in kind of the lighting distribution panelboards and dry-type transformers in the switchyard, the installation of warning lights at the three entrance points to the Cubicle Room, and an evaluation of the existing lighting system in the Cubicle Room.
From Presolicitation posted on Jun 23, 2025Please see attached documents.
From Solicitation posted on Jul 21, 2025UPDATE: Amendment 0001 was issued on 31 July 2025. Please see four (4) corresponding documents. Original Solicitation issued on 21 July 2025.
From Solicitation posted on Jul 31, 2025UPDATE: The Contractor Sign-in Sheet for the Site Visit held on 5 August 2025 has been posted in the attachments. UPDATE: Amendment 0001 was issued on 31 July 2025. Please see four (4) corresponding documents. Original Solicitation issued on 21 July 2025.
From Solicitation posted on Aug 05, 2025UPDATE: A follow-on site visit is scheduled for September 9, 2025 at 10:00 am. Contractors interested in seeing the site need to make a reservation with Irene Whitmer by e-mail at Irene.E.Whitmer@usace.army.mil. Contractors are to meet at the Powerhouse. UPDATE: Amendment 0002 was issued on 6 August 2025. Please see two (2) corresponding documents and updated proposal due date. UPDATE: The Contractor Sign-in Sheet for the Site Visit held on 5 August 2025 has been posted in the attachments. UPDATE: Amendment 0001 was issued on 31 July 2025. Please see four (4) corresponding documents. Original Solicitation issued on 21 July 2025.
From Solicitation posted on Aug 21, 2025UPDATE: Amendment 0003 was issued on 27 August 2025. Please see four (4) corresponding documents. UPDATE: A follow-on site visit is scheduled for September 9, 2025 at 10:00 am. Contractors interested in seeing the site need to make a reservation with Irene Whitmer by e-mail at Irene.E.Whitmer@usace.army.mil. Contractors are to meet at the Powerhouse. UPDATE: Amendment 0002 was issued on 6 August 2025. Please see two (2) corresponding documents and updated proposal due date. UPDATE: The Contractor Sign-in Sheet for the Site Visit held on 5 August 2025 has been posted in the attachments. UPDATE: Amendment 0001 was issued on 31 July 2025. Please see four (4) corresponding documents. Original Solicitation issued on 21 July 2025.
From Solicitation posted on Aug 27, 2025UPDATE: Amendment 0004 was issued on 22 September 2025. Please see seven (7) corresponding documents. UPDATE: The Contractor Sign-in Sheet for the Site Visit held on 9 September 2025 has been posted in the attachments. UPDATE: Amendment 0003 was issued on 27 August 2025. Please see four (4) corresponding documents. UPDATE: A follow-on site visit is scheduled for September 9, 2025 at 10:00 am. Contractors interested in seeing the site need to make a reservation with Irene Whitmer by e-mail at Irene.E.Whitmer@usace.army.mil. Contractors are to meet at the Powerhouse. UPDATE: Amendment 0002 was issued on 6 August 2025. Please see two (2) corresponding documents and updated proposal due date. UPDATE: The Contractor Sign-in Sheet for the Site Visit held on 5 August 2025 has been posted in the attachments. UPDATE: Amendment 0001 was issued on 31 July 2025. Please see four (4) corresponding documents. Original Solicitation issued on 21 July 2025.
From Solicitation posted on Sep 22, 2025UPDATE: Amendment 0005 was issued on 1 October 2025. Please see four (4) corresponding documents. UPDATE: Amendment 0004 was issued on 22 September 2025. Please see seven (7) corresponding documents. UPDATE: The Contractor Sign-in Sheet for the Site Visit held on 9 September 2025 has been posted in the attachments. UPDATE: Amendment 0003 was issued on 27 August 2025. Please see four (4) corresponding documents. UPDATE: A follow-on site visit is scheduled for September 9, 2025 at 10:00 am. Contractors interested in seeing the site need to make a reservation with Irene Whitmer by e-mail at Irene.E.Whitmer@usace.army.mil. Contractors are to meet at the Powerhouse. UPDATE: Amendment 0002 was issued on 6 August 2025. Please see two (2) corresponding documents and updated proposal due date. UPDATE: The Contractor Sign-in Sheet for the Site Visit held on 5 August 2025 has been posted in the attachments. UPDATE: Amendment 0001 was issued on 31 July 2025. Please see four (4) corresponding documents. Original Solicitation issued on 21 July 2025.
From Solicitation posted on Oct 01, 2025UPDATE: Amendment 0006 was issued on 3 October 2025. Please see four (4) corresponding documents. UPDATE: Amendment 0005 was issued on 1 October 2025. Please see four (4) corresponding documents. UPDATE: Amendment 0004 was issued on 22 September 2025. Please see seven (7) corresponding documents. UPDATE: The Contractor Sign-in Sheet for the Site Visit held on 9 September 2025 has been posted in the attachments. UPDATE: Amendment 0003 was issued on 27 August 2025. Please see four (4) corresponding documents. UPDATE: A follow-on site visit is scheduled for September 9, 2025 at 10:00 am. Contractors interested in seeing the site need to make a reservation with Irene Whitmer by e-mail at Irene.E.Whitmer@usace.army.mil. Contractors are to meet at the Powerhouse. UPDATE: Amendment 0002 was issued on 6 August 2025. Please see two (2) corresponding documents and updated proposal due date. UPDATE: The Contractor Sign-in Sheet for the Site Visit held on 5 August 2025 has been posted in the attachments. UPDATE: Amendment 0001 was issued on 31 July 2025. Please see four (4) corresponding documents. Original Solicitation issued on 21 July 2025.
From Solicitation posted on Oct 03, 2025UPDATE: Amendment 0007 was issued on 17 October 2025. Please see three (3) corresponding documents. UPDATE: Amendment 0006 was issued on 3 October 2025. Please see four (4) corresponding documents. UPDATE: Amendment 0005 was issued on 1 October 2025. Please see four (4) corresponding documents. UPDATE: Amendment 0004 was issued on 22 September 2025. Please see seven (7) corresponding documents. UPDATE: The Contractor Sign-in Sheet for the Site Visit held on 9 September 2025 has been posted in the attachments. UPDATE: Amendment 0003 was issued on 27 August 2025. Please see four (4) corresponding documents. UPDATE: A follow-on site visit is scheduled for September 9, 2025 at 10:00 am. Contractors interested in seeing the site need to make a reservation with Irene Whitmer by e-mail at Irene.E.Whitmer@usace.army.mil. Contractors are to meet at the Powerhouse. UPDATE: Amendment 0002 was issued on 6 August 2025. Please see two (2) corresponding documents and updated proposal due date. UPDATE: The Contractor Sign-in Sheet for the Site Visit held on 5 August 2025 has been posted in the attachments. UPDATE: Amendment 0001 was issued on 31 July 2025. Please see four (4) corresponding documents. Original Solicitation issued on 21 July 2025.
From Solicitation posted on Oct 17, 2025Notice history
10-
Presolicitation Posted Jun 23, 2025
-
Solicitation Posted Jul 21, 2025View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Jul 07, 2025 → Aug 20, 2025
-
Solicitation Posted Aug 21, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 20, 2025 → Oct 07, 2025
-
Solicitation Posted Oct 01, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Oct 07, 2025 → Oct 21, 2025