Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 4 notices 9 documents

Fort Peck Outside Maintenance Hydraulic Pivot Gate W9128F25QA094

Solicitation W9128F25QA094 Copied Notice ID b99edfb710bd46bfb274d21f25aa2967 Copied DEPT OF DEFENSE — W071 ENDIST OMAHA
SAM.gov
Posted
Aug 29, 2025
Deadline
Sep 12, 2025
Set-aside
SBA
NAICS
238990
PSC
Z2JZ

Summary

AI-generated · Aug 31, 2025

Procure and install a Hydraulic Vertical Pivot Gate, including all necessary hardware and appurtenances, to replace the existing double swing gate at the Outside Maintenance Facility fence in Fort Peck, Montana. The objective is to enhance equipment security and force protection by providing a reliable hydraulic pivot gate.

All solicitation documents will be posted on SAM.gov. Access requires SAM registration and up-to-date electronic annual representations and certifications. Questions should be submitted by the stated deadline, and answers will be posted by the stated date.

This SOLICITATION is for W9128F25QA094. Solicitation for Fort Peck Outside Maintenance Hydraulic Pivot Gate . The solicitation will close on 12 September 2025 by 2:00 PM CT. DESCRIPTION OF WORK: The purpose of this acquisition is to secure the procurement of a Hydraulic Vertical Pivot Gate. There is an existing fence around the Outside Maintenance Facility. This project will consist of installing a new Hydraulic Vertical Pivot Gate to replace the existing Double Swing Gate. The work shall consist of furnishing and installing a Hydraulic Pivot Gate and associated appurtenance, providing increased equipment security and force protection. Place of Performance: Fort Peck, Montana Contracting Office Address: USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901 Point Of Contact: All questions regarding this solicitation should be made to the Contract Specialist by submitting the questions to the emails listed below. All questions must be received on or before 2:00 PM CT, 4 September 2025. Answers will be posted by COB on 5 September 2025. Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database (https://sam.gov) exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov. Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendment current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update. Contract Specialist Lynne D. Reed, who can be reached by email: lynne.d.reed@usace.army.mil and/or Contracting Officer Marc R. Proietto at marc.proietto@usace.army.mil

From Combined Synopsis/Solicitation posted on Aug 29, 2025

This SOLICITATION is for W9128F25QA094. Solicitation for Fort Peck Outside Maintenance Hydraulic Pivot Gate . The solicitation will close on 12 September 2025 by 2:00 PM CT. DESCRIPTION OF WORK: The purpose of this is a construction acquisition is to secure the procurement of a Hydraulic Vertical Pivot Gate. There is an existing fence around the Outside Maintenance Facility. This project will consist of installing a new Hydraulic Vertical Pivot Gate to replace the existing Double Swing Gate. The work shall consist of furnishing and installing a Hydraulic Pivot Gate and associated appurtenance, providing increased equipment security and force protection. ROM: $25,000.00 and $100,000.00 Place of Performance: Fort Peck, Montana Contracting Office Address: USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901 Point Of Contact: All questions regarding this solicitation should be made to the Contract Specialist by submitting the questions to the emails listed below. All questions must be received on or before 2:00 PM CT, 4 September 2025. Answers will be posted by COB on 5 September 2025. Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database (https://sam.gov) exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov. Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendment current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update. Contract Specialist Lynne D. Reed, who can be reached by email: lynne.d.reed@usace.army.mil and/or Contracting Officer Marc R. Proietto at marc.proietto@usace.army.mil

From Combined Synopsis/Solicitation posted on Sep 03, 2025

AMENDMENT 0001 HAS BEEN POSTED IN THE ATTACHMENT SECTION THAT CONFIRMS THE DUE DATE FOR OFFERS IS ON 12 SEPTEMBER 2025 BEFORE CLOSE OF BUSINESS. ======================================================= This SOLICITATION is for W9128F25QA094. Solicitation for Fort Peck Outside Maintenance Hydraulic Pivot Gate . The solicitation will close on 12 September 2025 by 2:00 PM CT. DESCRIPTION OF WORK: The purpose of this is a construction acquisition is to secure the procurement of a Hydraulic Vertical Pivot Gate. There is an existing fence around the Outside Maintenance Facility. This project will consist of installing a new Hydraulic Vertical Pivot Gate to replace the existing Double Swing Gate. The work shall consist of furnishing and installing a Hydraulic Pivot Gate and associated appurtenance, providing increased equipment security and force protection. ROM: $25,000.00 and $100,000.00 Place of Performance: Fort Peck, Montana Contracting Office Address: USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901 Point Of Contact: All questions regarding this solicitation should be made to the Contract Specialist by submitting the questions to the emails listed below. All questions must be received on or before 2:00 PM CT, 4 September 2025. Answers will be posted by COB on 5 September 2025. Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database (https://sam.gov) exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov. Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendment current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update. Contract Specialist Lynne D. Reed, who can be reached by email: lynne.d.reed@usace.army.mil and/or Contracting Officer Marc R. Proietto at marc.proietto@usace.army.mil

From Combined Synopsis/Solicitation posted on Sep 10, 2025

AMENDMENT 0002 HAS BEEN POSTED IN THE ATTACHMENT SECTION TO CANCEL THIS SOLICITATION. THIS PROJECT WILL BE POSTED AGAIN IN FY2026. PLEASE CONTINUE TO WATCH SAM.GOV FOR FURTHER DETAILS. =================================================== AMENDMENT 0001 HAS BEEN POSTED IN THE ATTACHMENT SECTION THAT CONFIRMS THE DUE DATE FOR OFFERS IS ON 12 SEPTEMBER 2025 BEFORE CLOSE OF BUSINESS. ======================================================= This SOLICITATION is for W9128F25QA094. Solicitation for Fort Peck Outside Maintenance Hydraulic Pivot Gate . The solicitation will close on 12 September 2025 by 2:00 PM CT. DESCRIPTION OF WORK: The purpose of this is a construction acquisition is to secure the procurement of a Hydraulic Vertical Pivot Gate. There is an existing fence around the Outside Maintenance Facility. This project will consist of installing a new Hydraulic Vertical Pivot Gate to replace the existing Double Swing Gate. The work shall consist of furnishing and installing a Hydraulic Pivot Gate and associated appurtenance, providing increased equipment security and force protection. ROM: $25,000.00 and $100,000.00 Place of Performance: Fort Peck, Montana Contracting Office Address: USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901 Point Of Contact: All questions regarding this solicitation should be made to the Contract Specialist by submitting the questions to the emails listed below. All questions must be received on or before 2:00 PM CT, 4 September 2025. Answers will be posted by COB on 5 September 2025. Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database (https://sam.gov) exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov. Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendment current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update. Contract Specialist Lynne D. Reed, who can be reached by email: lynne.d.reed@usace.army.mil and/or Contracting Officer Marc R. Proietto at marc.proietto@usace.army.mil

From Combined Synopsis/Solicitation posted on Sep 16, 2025

Notice history

4
  1. Combined Synopsis/Solicitation Posted Aug 29, 2025
  2. Combined Synopsis/Solicitation Posted Sep 03, 2025
    • Description: Description was updated
  3. Combined Synopsis/Solicitation Posted Sep 10, 2025
    • Description: Description was updated
  4. Combined Synopsis/Solicitation LATEST Posted Sep 16, 2025
    • Description: Description was updated

Details

Solicitation number W9128F25QA094
Notice ID b99edfb710bd46bfb274d21f25aa2967
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) Z2JZ
NAICS 238990
Place of performance Fort Peck, Montana
Archive date Sep 27, 2025

Award Information

Not yet awarded

Contacts

primary
Lynne D. Reed

Email

Phone

secondary
Marc Proietto

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTHWESTERN
W071 ENDIST OMAHA

Place of Performance

Fort Peck, Montana 59223
USA

Dates

Posted Aug 29, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 12, 2025 10 months ago