Contacts, documents and full notice history are available with a subscription.
Sources Sought Expired 1 notice 1 document

Fort Peck Excitation System Upgrade W9128F27RA001

Solicitation W9128F27RA001 Copied Notice ID cda8de2fdb2d42a3a3c8ef863e3567a1 Copied DEPT OF DEFENSE — W071 ENDIST OMAHA
SAM.gov
Posted
Feb 23, 2026
Deadline
Mar 10, 2026
Set-aside
None
NAICS
335312
PSC
Z2KA

Summary

AI-generated · Feb 24, 2026

Fort Peck Dam’s excitation system modernization involves assessing options to upgrade the two powerhouses (five generating units) on the Missouri River near Glasgow, MT. The aging excitation systems show reliability and supportability concerns due to obsolete front-end components, legacy upgrades, and deteriorating controls. For Powerhouse 1 (Units 1–3), a targeted modernization may replace failing front-end components while reusing the existing digitals regulator hardware and cubicles, with modifications as needed.

For Powerhouse 2 (Units 4–5), a full replacement may be pursued, potentially removing existing equipment and installing new digital static excitation systems. This Sources Sought is for market research to assess industry capability, interest, and potential acquisition strategies, and it does not constitute a solicitation.

Background USACE is seeking information from interested and qualified contractors regarding potential modernization of excitation systems at Fort Peck Dam, a remote hydroelectric facility located on the Missouri River near Glasgow, Montana. The facility consists of two powerhouses with a total of five generating units. Existing excitation systems present reliability and supportability concerns due to aging equipment, partial legacy upgrades, and obsolescence of key control components. Powerhouse 1 Units 1 3 Existing digital excitation regulator hardware remains serviceable. Front-end excitation controls, field breakers, and operator interface components are obsolete and/or experiencing reliability issues. The Government is evaluating a targeted excitation system modernization approach, which may include replacement of failing or obsolete front-end components while reusing existing regulator hardware and cubicles, with modifications as required. Powerhouse 2 Units 4 5 Existing excitation systems include legacy components operating beyond their recommended design life. The Government is evaluating a full excitation system replacement for these units, which may include removal of existing equipment and installation of new digital static excitation systems. This Sources Sought notice is issued solely for market research purposes to assess industry capability, interest, and potential acquisition strategies. It does not constitute a solicitation.

From Sources Sought posted on Feb 23, 2026

Notice history

1
  1. Sources Sought LATEST Posted Feb 23, 2026

Details

Solicitation number W9128F27RA001
Notice ID cda8de2fdb2d42a3a3c8ef863e3567a1
Notice type Sources Sought
Product / Service (PSC) Z2KA
NAICS 335312
Place of performance Fort Peck, Montana
Archive date Mar 25, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Aaron Dugick

Email

secondary
Marc Proietto

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTHWESTERN
ENDIST OMAHA
W071 ENDIST OMAHA

Place of Performance

Fort Peck, Montana 59223
USA

Dates

Posted Feb 23, 2026 5 months ago
Last Updated Aug 06, 2026 2 days ago
Due Mar 10, 2026 4 months ago