Fort Chaffee Arkansas Fueling System Repairs W9128F26SS001
Summary
AI-generated · Feb 27, 2026Fort Chaffee fuel system repair project at both the service station and bulk fuel facilities includes removing three existing 8,000-gallon aboveground storage tanks and associated work (draining, cleaning, disposal of remaining product), installing three new 12,000-gallon ASTs on a new concrete pad, and reworking dispensers (two diesel, one MOGAS) on new islands with an offload point, parking hardstand, and spill containment. Also required are a new steel-framed canopy with its foundation, replacement of the equipment building, site lighting, pavement repairs, and foundation-removal experience. At the bulk fuel facility, upgrade three ASTs with catwalks, high-level shut-off, mechanical level gauge, water draw-off, and strapping charts; install offload pumps, site flow indicators, offload meters, Teflon pads, air eliminator, pressure-relief valves, product-recovery tanks, and dispenser sumps; replace fill-stand pump, piping (including undersized and threaded sections), valves, and dispensers; install pipe supports, remove transfer piping, add level alarms, repair supports, and install bollards.
Contractors must be licensed commercial contractors registered with the Arkansas Contractors Licensing Board and have demonstrated experience installing UL 2085 horizontal jet fuel (F-24) aboveground storage tanks and meter-proving connections, as well as foundation-removal work.
This project includes fuel system repairs at the Fort Chaffee retail and bulk fuel facilities. At the service station: Modify the three 8,000 gallon aboveground fuel storage tanks (AST?s) and appurtenances (including tank draining, cleaning, and disposal of any remaining product); Remove and dispose of three dispensers; Install three 12,000 gallon AST?s on new concrete pad; Repair dispensers (Two (2) diesel, One (1) MOGAS ) on new islands; Install offload point; Install parking hardstand area and spill containment system; AST work includes shut off valves, strapping charts, and catwalks; Install bollards; Repair emergency shut off system; Repair site lighting; Replace equipment building; Repair pavement. Construct a new steel framed canopy estimated to being 41.5 feet x 125 feet. Constructing new metal canopy construction and the associated foundation construction required. Foundation removal experience. At the bulk fuel facility: At the 3 AST?s provide catwalk, high level shut off, mechanical level gauge, water draw off, and strapping charts; Provide offload pumps, site flow indicator, offload meter Teflon pads, air eliminator, pressure relief valves, product recovery tanks, dispenser sumps; Replace fillstand pump, fuel piping, filter separator, undersized piping, threaded piping and valves, and dispensers; Install pipe supports; Remove transfer piping; Add level alarm; Repair pipe supports; Install bollards. All Contractors working at Fort Chaffee must be a licensed commercial contractor registered with the Contractors Licensing Board in Arkansas. Contractors will have experience installing brand new UL 2085 horizontal jet fuel (F-24) ASTs and installing meter proving connections.
From Sources Sought posted on Feb 26, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone