Fort Campbell - Aircraft Maintenance Hangar W912QR-26-HANGER-FCKY
Summary
AI-generated · Feb 26, 2026Identify qualified firms capable of providing Architect-Engineer design services for a 150,000 SF Modified Standard Design Medium TOE-RW Aircraft Maintenance Hangar at Fort Campbell, KY. The design scope includes integrated aviation maintenance operations, maintenance support, flight planning and flight operations areas, covered storage, a wash rack building and wash aprons, plus supporting facilities such as an aircraft parking apron connected to the Destiny Ramp, site development, utilities and connections, exterior lighting, paving, POV parking, walkways, storm drainage, landscaping, signage, and interior furnishings. The facility must be designed in accordance with all applicable UFCs and standard designs.
This market survey seeks to determine the availability of qualified Small Business firms (including HUBZone, 8A, Woman-Owned Small Business, and Service-Disabled Veteran-Owned Small Business) as well as Large Businesses to inform potential future set-asides. The design work will be procured as a Design-Bid-Build project under a Single Award Task Order Contract for the design portion, with an anticipated total capacity of $40 million.
This is a market survey being conducted to identify interested and capable firms for the design of a new Aircraft Maintenance Hangar at Fort Campbell, KY. The Government is seeking to determine the availability of qualified Small Businesses, certified HUBZone, 8A, Woman-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, as well as Large Businesses, to inform potential future set-asides for this project. Project Description The project requires Architect-Engineer (A-E) services for the design of a 150,000 SF Modified Standard Design Medium TOE-RW Aircraft Maintenance Hangar. The facility will include integrated aviation maintenance operations, maintenance support, company operations, flight planning, flight operations, covered storage, a wash rack building, and wash aprons. Supporting facilities include, but are not limited to, an aircraft parking apron with connection to the existing Destiny Ramp, site development, utilities and connections, exterior lighting, paving, POV parking, walkways, storm drainage, landscaping, and signage. The scope also includes comprehensive building and furnishings related to interior design services. The facility must be designed in accordance with all applicable UFCs and standard designs. The Government intends to award a Single Award Task Order Contract (SATOC) for the design portion of this Design-Bid-Build (DBB) project, with an anticipated total capacity of $40 million.
From Sources Sought posted on Feb 25, 2026This is a market survey being conducted to identify interested and capable firms for the design of a new Aircraft Maintenance Hangar at Fort Campbell, KY. The Government is seeking to determine the availability of qualified Small Businesses, certified HUBZone, 8A, Woman-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, as well as Large Businesses, to inform potential future set-asides for this project. Project Description The project requires Architect-Engineer (A-E) services for the design of a 150,000 SF Modified Standard Design Medium TOE-RW Aircraft Maintenance Hangar. The facility will include integrated aviation maintenance operations, maintenance support, company operations, flight planning, flight operations, covered storage, a wash rack building, and wash aprons. Supporting facilities include, but are not limited to, an aircraft parking apron with connection to the existing Destiny Ramp, site development, utilities and connections, exterior lighting, paving, POV parking, walkways, storm drainage, landscaping, and signage. The scope also includes comprehensive building and furnishings related to interior design services. The facility must be designed in accordance with all applicable UFCs and standard designs. The Government intends to award a Single Award Task Order Contract (SATOC) for the design portion of this Design-Bid-Build (DBB) project, with an anticipated total capacity of $40 million.
From Sources Sought posted on Feb 26, 2026This is a market survey being conducted to identify interested and capable firms for the design of a new Aircraft Maintenance Hangar at Fort Campbell, KY. The Government is seeking to determine the availability of qualified Small Businesses, certified HUBZone, 8A, Woman-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, as well as Large Businesses, to inform potential future set-asides for this project. Project Description The project requires Architect-Engineer (A-E) services for the design of a 150,000 SF Modified Standard Design Medium TOE-RW Aircraft Maintenance Hangar. The facility will include integrated aviation maintenance operations, maintenance support, company operations, flight planning, flight operations, covered storage, a wash rack building, and wash aprons. Supporting facilities include, but are not limited to, an aircraft parking apron with connection to the existing Destiny Ramp, site development, utilities and connections, exterior lighting, paving, POV parking, walkways, storm drainage, landscaping, and signage. The scope also includes comprehensive building and furnishings related to interior design services. The facility must be designed in accordance with all applicable UFCs and standard designs. The Government intends to award a Single Award Task Order Contract (SATOC) for the design portion of this Design-Bid-Build (DBB) project, with an anticipated total capacity of $40 million.
From Sources Sought posted on Feb 27, 2026Notice history
3-
Sources Sought Posted Feb 25, 2026
-
Sources Sought Posted Feb 26, 2026No changes from previous notice
-
Sources Sought LATEST Posted Feb 27, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA