Forest Service - Disaster, Bush Loop Accessible Paved Trail Reconstruction 127EAW25R0030
Summary
AI-generated · Aug 24, 2025Reconstruct a 0.46-mile, handicapped-accessible paved trail within a sensitive giant sequoia grove in Sequoia National Forest. The work includes vegetation trimming, removing existing trail components, widening and repaving with hot-mix asphalt, replacing drainage pipes, seal coating the trail, and building an accessible parking space with signage, all in line with environmental protections. It’s a construction contract performed under a firm-fixed-price arrangement, with Davis-Bacon wage rates, and a project value in the $250,000–$500,000 range for a 90-day duration after Notice to Proceed; the work is a total small-business set-aside and requires SAM registration with active UEI and CAGE codes.
Between notices, the site-visit requirement changed: the presolicitation stated a site visit would be provided with the RFP, but the actual solicitation clarifies there will be no organized site visit and that contractors should independently visit the site. The RFI process is available for questions to the Contract Specialist, and the full scope, specifications, and attachments will be provided with the RFP package. The project remains within the same magnitude and small-business set-aside framework.
PRE-SOLICITATION NOTICE This pre-solicitation notice is issued for informational purposes only to inform industry of an upcoming project requirement that will be solicited. This is NOT a Request for Proposal (RFP). At this time, no solicitation exists; therefore, please do NOT request a copy of the solicitation, bid documents, specifications, or drawings. Responses or proposals are not required at this stage. The USDA Forest Service Procurement and Property Services, Field Procurement Operations, Southwest Zone, Contract Service Area 6, on behalf of Region 5, is currently preparing a solicitation RFP to for a contractor to provide all necessary materials, supplies, equipment, and personnel to reconstruct a 0.46-mile handicapped-accessible paved trail within a sensitive giant sequoia grove, which includes tasks such as vegetation trimming, removal of existing trail components, widening and repaving the trail with hot mix asphalt, and replacing drainage pipes. Additionally, the project requires seal coating the trail, constructing an accessible parking space with necessary signage, and ensuring all work aligns with environmental considerations. Project Location Project location is in the State of California, County of Tulare, Sequoia National Forest, as described below. The Bush Loop Accessible trail is located off FS Road 22S82 Lloyd Meadow Road at the end of FS road 20S78 Freeman Creek Grove Road north of the community of Johnsondale on the Western Divide Ranger District of the Sequoia National Forest/Giant Sequoia National Monument. From Kernville, follow Sierra Way/Mountain Highway 99 north along the Kern River for approximately 20 miles and continue another 4 miles on Mtn 99 to Johnsondale. Shortly after passing Johnsondale, turn right on FS Rd 22S82 and continue approximately 18 miles; then left on FS Rd 20S78 for approximately 1 mile to the trailhead parking lot. The project is located at Township 20 South, Range 32 East, and in the Southeast of section 28. The contract duration is anticipated to be 90 calendar days from the issuance of the Notice to Proceed (NTP). Work is anticipated to start September 2025. The full scope including associated specifications and drawings shall be provided with the issued solicitation RFP - 127EAW25R0030. Site Visit information will be provided with the solicitation RFP when issued. ACQUISITION INFORMATION This acquisition shall be a total small business set-aside. This is a construction project, and Request for Proposal and resulting contract is for construction. Davis-Bacon Construction Wage Rates shall apply to any resulting contract. The awarded contract shall be firm-fixed-price. IAW Federal Acquisition Regulation (FAR) 36.204 Disclosure of the magnitude of construction projects, the estimated price range of the contract is between $250,000 and $500,000. The North American Industry Classification System (NAICS) code for this acquisition is 237310 Highway, Street, and Bridge Construction, with small business size standard of $45M in annual revenue. Solicitation posting date is tentatively planned for on or about 16 July 2025. All proposal submission instructions and evaluation information shall be provided with the solicitation RFP. Interested parties are hereby notified that the solicitation will be available exclusively on the Contract Opportunities website SAM.gov (https://sam.gov). The solicitation, attachments, and amendments (if any) will be published for viewing, printing, and downloading from the Contract Opportunities website only. It is the potential offeror's responsibility to monitor Contract Opportunities for the release of amendments, changes, or other information pertaining to the solicitation. No hardcopy/paper versions of the solicitation or amendments will be distributed. Contractors must be registered in the System for Award Management (SAM) database in order to receive a contract award from any USDA Forest Service activity. Lack of registration in the SAM will render an offeror ineligible for award. SAM information can be found at SAM.gov. Offerors shall have and maintain an active registration in the SAM database at the time of bid/proposal submission and award to be eligible for a Government contract award. If at the time of bid submission and/or award an offeror is not successfully and active in the SAM database, the Government reserves the right to award to the next prospective offeror. Unique Entity Identifier (UEI) number and CAGE Code numbers are required. For additional information or questions contact the Contract Specialist Tanya Torres via email at Tanya.Torres@usda.gov.
From Presolicitation posted on Jul 01, 2025127EAW25R0030 - Disaster, Bush Loop Accessible Paved Trail Reconstruction Sequoia National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $250,000 and $500,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: Refer to Section L, Paragraph L.2, on Page 35 for detailed instructions regarding the submission of proposals, including the required documents and information to be provided. All Requests for Information (RFI's) shall be submitted to the Contract Specialist, Tanya Torres on the attached RFI form not later than 1000 AM hours PDT, August 5th, 2025. An organized site visit will not be held.Contractors are encouraged to independently visit the site and submit any requests for information prior to the due date specified above. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
From Solicitation posted on Jul 16, 2025Notice history
2-
Presolicitation Posted Jul 01, 2025
-
Solicitation LATEST Posted Jul 16, 2025View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Jul 15, 2025 → Aug 18, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance