For replacement of 6 bathrooms and a re-pipe of all potable water lines, hot, cold, circulation and sewage PR15820469
Summary
AI-generated · Feb 03, 2026Replace all defective water and sewage pipes and modernize the facility’s potable water and sewage systems to meet current German safety, efficiency, and hygiene standards. The renovation includes full re-piping, fixture installation, waterproofing, tiling, painting, and electrical integration to deliver a long-term, code-compliant, and reliable system.
A mandatory site visit is scheduled for 02/13/2026 at 11 AM. See the SOW for further information and registration.
Purpose and Objectives The purpose of this project is to replace all defective water and sewage found pipes and modernizing the existing potable water and sewage systems throughout the facility to ensure compliance with current German standards for safety, efficiency, and hygiene. The renovation includes full re-piping, fixture installation, waterproofing, tiling, painting, and electrical integration, resulting in a long-term, code-compliant, and reliable system. A site visit is mandatory: 02/13/2026 at 11 AM. Please see SOW for further information and registration!
From Solicitation posted on Feb 02, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
DEU