Folsom Pumping Plant (FOU) Motor Repair - CCAO 140R2026Q0042
Summary
AI-generated · Feb 27, 2026Repair and commission Motor 2 at the Folsom Pumping Plant (FOU) to ensure reliable operation of the pumping system and maintain continuous water delivery.
The purpose of this requirement is to repair and commission Motor 2 at the Folsom Pumping Plant to ensure reliable operation of the pumping system and maintain continuous water delivery.
From Combined Synopsis/Solicitation posted on Feb 26, 2026The purpose of this requirement is to repair and commission Motor 2 at the Folsom Pumping Plant to ensure reliable operation of the pumping system and maintain continuous water delivery.
From Award Notice posted on Mar 23, 2026Notice history
2-
Combined Synopsis/Solicitation Posted Feb 26, 2026
-
Award Notice LATEST Posted Mar 23, 2026
Details
Award Information
Award Notices
Posted: Mar 23, 2026
The purpose of this requirement is to repair and commission Motor 2 at the Folsom Pumping Plant to ensure reliable operation of the pumping system and maintain continuous water delivery.
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| VALLEJO ELECTRIC MOTOR, INC | FN9TCEAM9AJ4 | 0KKG2 | Vallejo, CA |
Contacts
Phone